0.073 NOTES:-
3.355 3.543
ALL DIMENSIONS ARE IN MM, CHECK LAYOUT AS / ARCHITECT.
DO NOT SCALE THE DRAWING. ONLY WRITTEN DIMENSIONS
0.850 0.850 0.7500.750
0.7500.750 ARE TO BE FOLLOWED.
0.884 0.816
0.784 0.716
0.759 0.641
UNLESS SPECIFIED CONCRETE MIX IS TO BE M20 (IS: 456-2000)
1.700
1.500
1.400
A 0.000 OVERLAP LENGTH IN COLUMN VERTICAL REINFORCEMENT SHALL
F1-C2 F2-C1 F3-C1 NOT BE LESS THAN DEVELOPMENT LENGTH IN COMPRESSION.
P. BEDROOM
1.500 NOT MORE THAN 50 % OF BARS SHALL BE OVERLAP AT A SECTION.
1.500 11' X 13'2"
1.700 PROVIDE CONFINING LATERAL TIES 8 # @ 100 MM C/C IN COLUMN
ABOVE AND BELOW BEAM UPTO 500 MM AS SHOWN IN SECTION.
4.114
1.035
0.865 0.935
0.815 0.885
1.800
1.700
DINING
B 4.114 11' X 25'2" IF IN DOUBT, ASK UNDERSIGNED.
0.865
F4-C1 F5-C3 F6-C1 A. TOILET CONCRETE COVER : (FOR MILD ENVIRONMENTAL CONDITIONS )
7' X 4'3" S.N. STRCUTURAL ELEMENT TYPE COVER IN MM
2.100 1 PILES / PILE CAPS 75
1.800 1.900
2 RAFT FOUNDATION 75
3.780
3 ISOLATED FOOTING 50
UTILITY 4 COLUMNS/ PEDESTALS 40
5 BEAMS (PLINTH, LINTEL, FLOOR) 25 (SIDE), 40 (BOTTOM)
0.950 1.135 0.965
0.950 0.900 0.900 6 BASEMENT / FLOOR SLAB 20
UP
1.000 1.000
FOOTING TYPE : C2
0.885 0.815
FOOTING TYPE : C1 DEVELOPEMENT LENGTHS AS PER IS 456 : 2000 (Ld) : FOR M20 / Fe500
2.000
1.800
1.700
C 7.894 DIA. OF
F7-C2 F8-C3 F9-C1 BARS IN TENSION (MM) IN COMPRESSION (MM)
POOJA 8 MM 453 (460) 363 (365)
1.900 1.800 6'7" X 6'3" 10 MM 566 (570) 453 (455)
2.100
12 MM 680 (700) 544 (550)
DRAWING ROOM
16 MM 906 (910) 725 (725)
4.475
(DOUBLE HT.)
15'2" X 16'4" 20 MM 1133 (1135) 906 (910)
25 MM 1416 (1420) 1133 (1135)
ENTRANCE 32 MM 1813 (1815) 1450 (1450)
0.800 0.800 FOYER
40 MM 2266 (2270) 1813 (1815)
0.765 0.835
D 12.369
F12-C1 MINIMUM DEPTH OF FOUNDATION SHALL BE AS GIVEN IN DRAWING.
1.500
1.800
E 12.969 16MM
0.600
UP
2 SLAB SPANS ABOVE 4.50 M 14 DAYS
0.000
3.355
3.428
6.970
VERTICAL MAIN BARS (TYP) LOADS CONSIDERATION : (AS PER IS 875 (2))
F2-C1 1700 1700 1500 1500 450 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C L. TIES 8 # @ 150 C/C (TYP)
40 1. IMPOSED LOAD : 2 KN / SQ. M. (U.D.L.)
F3-C1 1500 1500 1300 1200 350 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C
8 # @ 100 C/C
CONF. L. TIES
2. FLOOR FINISHES : 1.5 KN / SQ. M. (U.D.L.)
(TYP)
PLINTH BEAM 3. WALL LOADS :EXTERNAL WALLS OF 9" THK.,
F4-C1 1800 1700 1600 1500 400 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C
500
INERNAL WALLS OF 6" THK. FOR FULL HT.
F5-C3 2100 1900 1900 1700 500 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C 40
4. PARAPET WALL (1.0 M HIGH) LOAD WHICH
F6-C1 1900 1800 1700 1600 450 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C IS CONSIDERED ONLY ON PERIPHERAL
BEAMS.
8 # @ 100 C/C
CONF. L. TIES
F7-C2 1900 1800 1700 1600 450 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C 65
(TYP)
500
F8-C3 2100 2000 1900 1800 500 PAD 150 10 # @ 125 C/C 10 # @ 125 C/C
F9-C1 1800 1700 1600 1500 450 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C G.L.
SHEET 1 OF 1
G.L.
THIS DRAWING MUST NOT BE RETAINED, COPIED OR USED WITHOUT PRIOR CONSENT
F10-C2 1600 1500 1400 1300 400 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C 65
COLUMN BELOW PLINTH
F11-C2 1900 1800 1700 1600 450 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C VERTICAL MAIN BARS (TYP) CONCRETE GRADE : M20 REIN. STEEL GRADE : Fe500
F12-C1 1600 1600 1400 1400 400 PAD 150 10 # @ 150 C/C 10 # @ 150 C/C
8 # @ 100 C/C
CONF. L. TIES
500
(TYP)
SCHEDULE OF COLUMNS :-
R/F PARALLEL TO 'L'
UPTO GROUND LEVEL ABOVE GROUND LEVEL L. TIES L. TIES (CONFINING) STRUCTURAL CONSULTANT :
DEPTH (D)
COL
TYPE (NOMINAL) FOR 500 MM NEAR R/F PARALLEL TO 'B' CEAD CONSULTANCY
B D LONG. REINF. B D LONG. REINF. JT. 100
100
Er. Swapnil Bokade
i gn
PLOT NO 28 JAYRAJ NAGAR TUKUM CHANDRAPUR
Civ i
Des
l E
C1 280 350 6 -12Ø 230 300 6 -12Ø 8 # @ 150 C/C 8 # @ 100 C/C
150
&
ng
ne is
PCC (M10)
i
er s
i n g A na l y
MO. NO 9370089519
300 MM THK.
PROJECT :
C2 280 400 8-12Ø 230 350 8-12Ø 8 # @ 150 C/C 8 # @ 100 C/C BOULDER + 40% DUST PROPOSED BUILDING
FOR :- SHENDE SIR
C3 280 450 4-16Ø+4-12Ø 230 400 4-16Ø+4-12Ø 8 # @ 150 C/C 8 # @ 100 C/C WELL COMPACTED AVAILABLE STRATA
TITLE :
DETAILS OF FOUNDATION
1:25 TYPICAL SECTION - FOOTING TYPE
ANALYZED BY: SWAPNIL
M20 DESIGNED BY: SWAPNIL
DEALT : R0 24.10.2021 ISSUED FOR CONSTRUCTION
/jai ambe/narendra nagar/04 ffsl
------ ------