1 Introduction
5 Summary
ISO 19443:2018:
▪ Concretizes the ISO 9001:2015 requirements
▪ Broadens the ISO 9001:2015 requirements
1 Introduction
5 Summary
1 Introduction
5 Summary
The organization shall determine and provide the resources needed for the establishment, implementation, maintenance
and continual improvement of the quality management system.
1 Introduction
5 Summary
0 Introduction
Verbal Forms:
• “shall“ → requirement
• “should“ → recommendation
• “may“ → permission
• “can“ → possibility or a capability
▪ Process approach when developing, implementing and improving the effectiveness of a quality management system
▪ Purpose: enhance customer satisfaction by meeting customer requirements
▪ Understanding and managing interrelated processes as a system
▪ Involves the systematic definition and management of processes, and their interactions
Subchapters:
▪ 0.3.2 Plan-Do-Check-Act Cycle
▪ 0.3.3 Risk-based Thinking
Risk based
thinking
Preventive action to Analysing any
eliminate potential nonconformity that
nonconformities do occur
Requirements
for Organization,
that ISO 9001
demonstrates plans to enhance
provision of high customer
quality products satisfaction
performs activities
supplies ITNS
on licensed nuclear ISO 19443
items/activities
site
▪ Chapter 3: Terms and Definitions : ISO 19443 adds the following Nuclear-specific Terms and Definitions:
Counterfeit /
Commercial grade
Activity Fraudulent / Graded Approach
item or activity
Suspect (CFS) item
Important to
Nuclear Safety Item Licensee Nuclear Safety
(ITNS)
4.2 Understanding
4.1 Understanding
the needs and 4.3 Determining the 4.4 QMS and its
the organization and
expectations of scope of the QMS Processes
its context
interested parties
4.4.3 The
4.4.1
organization shall
4.4.2
…. documentation
▪ Organization:
– Determination of external and internal issues
• relevant to organizations purpose and strategic direction
• That affect its ability to achieve intended result of organizations QMS
– Monitor and review information about issues
▪ The Organization shall determine boundaries and applicability of the quality management system to establish scope with
following taken into consideration:
a) external and internal issues
b) requirements of relevant interested parties
c) products and services of organization
Further Information in
ISO 10005:2018 ‐ Quality management systems - Guidelines for quality plans
ISO 10006:2018 ‐ Quality management systems - Guidelines for quality management in projects
Responsibility Operation
and Authority and Control
Processes
needed for QMS
Inputs Outputs
Resources
Sequence and interaction
Risks and
Opportunities
Review
5.3 Organizational
5.1 Leadership
roles,
and 5.2 Policy
responsibilities and
Commitment
authorities
5.2.1 5.2.2
5.1.1 5.1.2 Customer 5.1.3 Nuclear
Establishing the Communicating
General Focus Safety Culture the quality policy
quality policy
Nuclear Safety
#1 = behavioural #2 = structural
individuals organization
6.2 Quality
6.1 Actions to
objectives and 6.3 Planning of
address risks and
planning to achieve changes
opportunities
them
6.2.1, 6.2.2
6.1.3 Determination of ITNS items and 6.1.4 Graded approach to the application of
activities quality requirements
-grade the application of requirements related
-break down ITNS products and services into to quality management documentation,
items and activities monitoring and measurement
-determine the items and activities, whose
failure or malfunction might influence the -take into account: customer requirements for
products and/or services safety function(s) ITNS products or services , complexity of
item/activity, organizational aspects
Maintain/retain documented information
6.2.1 Establishing quality objectives at relevant functions, levels and processes needed for the QMS
Quality objectives:
• Consistent with quality policy
• Measurable
• Take applicable requirements into account
• Relevant to conformity of products and services
• Relevant to enhance customer satisfaction
• Monitored
• Communicated
• Updated as appropriate
• Documented (documented information)
Determine
• Purpose of the changes
• Potential consequences
• Integrity of the QMS
• Availability of resources
• Allocation or reallocation of responsibilities and
authorities
7.4 7.5
7.1 7.2 7.3
Communicat Documented
Resources Competence Awareness
ion Information
Internal resources
Ensure that Nuclear Safety is
not compromised..
External resources
-the suitability of the resources takes into -retains as documented information the
account the measuring range and output of the determination and the actions
measurement accuracy taken
Measurand
Measured value
Organization:
• Determine necessary competence of persons
• Ensure that these persons are competent on the basis
of education
• Take actions to acquire the necessary competence
• Retain documented information as evidence of
competence
Indiv. B x MM/YY
How should the welder behave? Should he proceed with the welding to
keep the job going? Or is it more appropriate to check with welding
supervision whether his personal qualifications are up to date?
The Manufacturing of high grade material bolts was contracted to a Tier 2 supplier. Drawings
and specification were supplied by the Tier 2 supplier giving details of the material
specification and certification to be providded by the manufacturer. The Tier 2 supplier
subcontracted the work to Tier 3/ Tier 4/ Tier 5 suppliers, who then subcontracted the work to
the final manufacturer. During the subcontracting stages, errors and assumptions were made
about the material to be used and the certification to be provided. This resulted in the bolts
inadvertently being manufactured from a lower grade material and without the required
certification.
▪ Situation B:
• The order for the manufacturing of high grade material bolts was given to the end manufacturer via 5 subcontractors. During
the subcontracting stages, errors were made about the material to be used and the certification to be provided. As a result,
the bolts were manufactured from a lower grade material without the required certification. During the receipt inspection it was
found out that the bolts had been manufactured from the wrong grade of material and without the required certification. The
nonconforming output has been managed and the customer has been informed. The organisation has included the event in
its lessons learned process in order to prevent a recurrence. Please fill in the attached lessons learned report.
▪ Situation C:
• During the visual inspection of the components the inspector was suspicious of their surface texture. The components were
investigated, and it was found out that the products was counterfeit or fraudulent. The top surface has been sanded down and
re-marked. The nonconforming output has been managed and the customer has been informed. The organisation has
included the event in its lessons learned process. Please fill in the attached lessons learned report.
▪ Event
7.5.3.1 7.5.3.2
Address following activities:
Control documented information, if it is: -distribution, access, retrieval and use
-available and suitable for use -storage and preservation
-adequately protected. -control of changes
-retention and disposition
ISO 19443
-managing the interfaces with external parties
8.2.3.1 8.2.3.2
Conduct a review before supplying the
product: retain documented information:
-requirements specified by the customer -on the results of the review
-requirements specified by the organization -on any new requirements for the products
-statutory and regulatory requirements and services
-contract or order requirements
ensure that:
• relevant documented information is amended
• relevant persons are made aware of the changed
requirements
Determination of type of
Design verification (4)
design outputs (2)
-consider any level of the supply chain and -define responsibilities and authorities
take into account the graded approach -appropriate control of the supply chain
-demonstrate equivalence of provisions taken -responsibility for the conformity of all
externally provided processes and products
TÜV SÜD Academy UK | ISO 19443 Training 21-23/06/2022 70
Demonstration of the evidence of provisions for monitoring activities
Typical inspection and test plan
Organization
(Title of) Inspection and Test Plan / Project Name / … Reference Revision
Name/Logo
Equipment Technical specification Rev. Code & Standard Safety classification
Production Procedure(s) Organization performer Organization Customer monitoring Owner monitoring Authorities monitoring
activity monitoring
No Descr. Ref. Rev. Name Date Record Interv. Name Date Interv. Name Date Interv. Name Date Interv. Name Date &
& Visa No. & Visa & Visa & Visa Visa
1
Identify:
• outputs to ensure the conformity of products and
services
• the status of outputs with respect to monitoring and
measurement
control:
• unique identification of the outputs
ISO 19443
• ensure that marks or labels do not prejudice product
conformity
• stamps, electronic signatures: control their usage
ISO 19443
• statement of conformity
• all required documented information must be present
at delivery
Product can be
made conform
to requirements
by repair
according to
Non Requrest for approval is
procedures Sending of non-conformance
conformance already report to the next level of the Approval made to the next level if the
corresponding manufacturing
Approval
approved by supply chain for approval of
procedure has initially been
repair procedure before any
in relation with the next level of of repair procedure approved by the next level of of repair procedure
intervention on the product
the supply chain the supply chain
the
contractural
requirements Product cannot
Request for authorization is
be repaired
and supplier‘s
Sending of non-conformance Authorization made to the next level if the Authorization
report to the next level of the requirement not satisfied is
intention is to supply chain for authorization defined in a document approved
propose „use as as „use-as-is“ for „use-as-is“ by the next level of the supply for „use-as-is“
is“ chain
9.1
Monitoring, 9.3
9.2
measurement, Management
analysis, Internal audit review
evaluation
Demonstrate:
-conformity to products and services requirements
-ability of the processes to achieve planned results
TÜV SÜD Academy UK | ISO 19443 Training 21-23/06/2022 83
Chapter 9 - Performance evaluation
9.1.3 Analysis and evaluation
evaluate:
• conformity of products and services
• the degree of customer satisfaction
• the performance and effectiveness of the qms
• the effectiveness of actions taken
• the performance of external providers
• the need for improvements to the qms
ISO 19443
• Nuclear safety culture aspects
10 - Improvement
10.2.1 10.2.2
ISO 19443
• lessons learned from nuclear experience
• risk mitigation
• technical advances and research and development
• methods for identifying good practices
share with customers learning from experience
10.2.1
retain
continually improve:
• the suitability
• the adequacy
• the effectiveness of the qms
consider the results of analysis and evaluation
• Are there needs or opportunities for improvement?
ISO 19443
• encompass nuclear safety culture
1 Introduction
5 Summary
This document and any information it contains shall not be used for any other
purpose than the one for which they were provided.
’’
Stock photos and ClipArt's: Licensed by TÜV SÜD.com Image Database.