You are on page 1of 3

Work Instruction Title:

LAUNCHING
WI. Ref NO Effectivity Date: Rev. No.: Page Total:
WI-RAJT-22 09.01.2020 00 1/3
PURPOSE: : To Inform operation personnel on how to properly proceed with Launching

SCOPE: : This procedure covers the standard workflow for Launching.

Responsible Process flow Details


Project Engineer
Dock master EQUIPMENT/TOOLS REQUIRED
Start  Air bag
 Compressor
 Hull blocks
 Winch
 Wire rope
Gather all the equipment  Shackle
needed  radio

PROCESS

Launching procedure would start by plotting the


location of the air bags to be inserted beneath the
hull reduction of hull blocks is required to put in
place the air bags
Are all the
equipment Upon securing the air bags to its location make sure
complete? that the air bags are properly laid off before
inflating. Secure the wire rope of the winch to the
hull using appropriate shackles.

Upon securing the hull to the winch inflating of the


air bag can be commenced. After inflating of the
Identify the missing
No equipment
airbags is done all remaining hull blocks should be
remove.
Yes
After removing all the obstruction partially loosen
the winch brake and control the winch to loosen its
wires. Launching of the vessel to the river should be
done slowly to control the risk of bumping to the
Reduce the hull blocks river wall at the other side
In way of the air bags

Are all the hull


blocks in way
of airbags
removed?
Identify the hull
No blocks to be
removed
Yes

A
PMM Prepared By: Reviewed and Approved By:

JOHN ANGELO D. TULIAO ALLEN JAMES C. TULIAO


Operations Head Director
REVISION HISTORY
No. Revision details: Effectivity Date:
0 Initial Issue 09.01.2020
Work Instruction Title:
LAUNCHING
WI. Ref NO Effectivity Date: Rev. No.: Page Total:
WI-RAJT-22 09.01.2020 00 2/3
PURPOSE: : To Inform operation personnel on how to properly proceed with Launching

SCOPE: : This procedure covers the standard workflow for Launching.

Responsible Process flow Details

Proceed with inserting the


air bag beneath the hull

Are the air bags


properly laid off?

Properly laid the air bags in


No their respective places
Yes

Secure the hull to winch

Is the shackle
properly
secure to the
pad eye?

No Re install the
shackle

Yes

B
PMM Prepared By: Reviewed and Approved By:

JOHN ANGELO D. TULIAO ALLEN JAMES C. TULIAO


Operations Head Director
REVISION HISTORY
No. Revision details: Effectivity Date:
0 Initial Issue 09.01.2020
Work Instruction Title:
LAUNCHING
WI. Ref NO Effectivity Date: Rev. No.: Page Total:
WI-RAJT-22 09.01.2020 00 3/3
PURPOSE: : To Inform operation personnel on how to properly proceed with Launching

SCOPE: : This procedure covers the standard workflow for Launching.

Responsible Process flow Details

Slightly loosen the brakes

Is the vessel
launching going
slowly?

No Secure the brake

Yes

Steadily launch the vessel


until it is fully floating in the
river

Deflate the air bags

Remove the shackle to the


hull

END

PMM Prepared By: Reviewed and Approved By:

JOHN ANGELO D. TULIAO ALLEN JAMES C. TULIAO


Operations Head Director
REVISION HISTORY
No. Revision details: Effectivity Date:
0 Initial Issue 09.01.2020

You might also like