Professional Documents
Culture Documents
L.O.W
4
4
7.3017
1.5500
1.0500
TP-149
L.O.W
L.O.W
TP-150
4
L.O.W
L.O.W
4
2 2
8 1 3
34 1
34
15
1 4
L.O.W
3
3 1
L.O.W
4
L.O.W
L.O.W
11
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
LINK IS PART OF 2030 DESIGN
FOR TEMPORARY
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
TIE TO EXISTING SHEIKH
BARRIER MOHAMMED
L.O.W
12
BIN
ZAYED
ROAD L.O.W
(E311)
EMERGENCY LAY BY
L.O.W
L.O.W
L.O
8 .W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
6
L.O.W BARRIER TO
L.O.W
L.O.W EXISTING
L.O.W
SHOULDER
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7
L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
J
NOTES
GENERAL LEGENDS
TRIAL PIT LOCATION
TP-01 TRIAL REF NUMBER
80
0
M
M
AC
IR
R.
M
AI
TP-147A N
LI
NE
TP-147
TP-146
TP-145B
JJ
NOC DRAWINGS
TP-145A
CONTRACTOR
CLIENT
POINT-1 POINT-2
AL
TP
UTILITY INTERFACE REMARKS
YA
NUMBER EASTING NORTHING EASTING NORTHING
LA
CONSULTANT
YA
TP 145 481978.073 2768255.843 481989.586 2768246.246 Dewa 11Kv & Water
S
ST
Dewa Road
. (D
TP 145A 481983.552 2768240.911 481986.234 2768241.217 Crosswing Duct
57
)
Dewa Road PROJECT TITLE
DRAWING TITLE
TP 147A 481776.791 2768194.522 481772.498 2768194.714 RTA Spare Duct COMBINED UTILITIES DRAWING
WITH TRIAL PIT LOCATION
TP 148 481607.940 2768154.767 481612.195 2768155.368 Telecom Du
NAME PROJECT STAGE
PRINTED AT :Wednesday, 19 October 2022 9:35:47 AM
COORDINATED BY AI
A1
TP 150 481385.604 2768116.561 481392.836 2768117.896 132kv Trough DRAWN BY
APPROVED BY
AA
AI
DRWG. SIZE
DRAWING No.
R1105-GEN-TP-SK-01301
MATCH LINE WITH DWG. No.01303
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
KEY PLAN
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
J
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
132kv
4
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
NOTES
GENERAL LEGENDS
TRIAL PIT LOCATION
TP-01 TRIAL REF NUMBER
J
MATCH LINE WITH DWG. No.01301
● ● ● ● ● ● ●
● ●
● ● ● ● ● ●
NOC DRAWINGS
CONTRACTOR
TP-144 CLIENT
80 CONSULTANT
0M
M
AC
IRR
.M
AIN
LIN
E
PROJECT TITLE
BLOCK
DRAWING TITLE
DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
CHECKED BY AI
DU194000
TP-143B
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01302
MATCH LINE WITH DWG. No.01304
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01301 KEY PLAN
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
LA
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
T. (
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
D5
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
7)
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
NOTES
GENERAL LEGENDS
TRIAL PIT LOCATION
TP-01 TRIAL REF NUMBER
N-
4
N-
4
D ROA
MED BIN ZAYE
O H A M
N-
IKH M
4
SHE
N-
4
N-
4
N-
4
N-
4
N-
4 NOC DRAWINGS
N-
4
N-
INE 4
. MAIN L PSLB 80
AC IRR
00 FOR APPROVAL SG OCT 2022
0M
800 MM M Rev.No. DESCRIPTION APP'D DATE
AC
N-
4
IR CONTRACTOR
R .M
AI
N
N-
NDM LIN
4
E
J
J
J
CLIENT
CS
LB
CONSULTANT
CS PROJECT TITLE
LB
R1105 - DEVELOPMENT OF THE
INTERCHANGE OF GHARN
AL SABKHA AND
SH. MOHD. BIN ZAYED ROAD
LOCATION DUBAI PROJECT NO. R1105
BLOCK
DRAWING TITLE
800
NAME PROJECT STAGE
PRINTED AT :Wednesday, 19 October 2022 9:35:47 AM
MM
DESIGNED BY MK C
AC
PS
DEVELOPED BY MK PROJECT No.
IRR
LB
COORDINATED BY AI
DU194000
.M
CHECKED BY AI
AIN
VERIFIED BY AI SCALE
LIN
DRAWN BY AA DRWG. SIZE A1
E
APPROVED BY AI DATE OCT 2022
DRAWING No.
R1105-GEN-TP-SK-01303
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01302 KEY PLAN
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
TP-143A
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
J
TP-143 1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
NOTES
TP-137
1. ALL DIMENSIONS ARE IN METER.
2. ALL THE COORDINATES ARE IN DLTM SYSTEM
TP-140 TP-139
TP-142 TP-141 TP-138
TP-136
GENERAL LEGENDS
TRIAL PIT LOCATION
TP-01 TRIAL REF NUMBER
3 11)
YED R OAD (E
BIN ZA
MOHAMMED
SHEIKH
L.O.W
TP-123A
TP-122A TP-122 TP-121 TP-120A TP-120 TP-119
TP-123
TP-124
TP-125A
L.O.W
MATCH LINE WITH DWG. No.01303
POINT-1 POINT-2
TP NUMBER UTILITY INTERFACE REMARKS
EASTING NORTHING EASTING NORTHING
TP on Pile and Pilecap
TP 119 482779.267 2768526.611 482791.207 2768516.035
Location
TP on Pile and Pilecap
TP 120 482764.917 2768503.272 482769.578 2768499.107
Location
TP on Pile and Pilecap
TP 120A 482738.932 2768474.190 482743.592 2768470.025
Location
TP on Pile and Pilecap
TP 121 482705.615 2768436.886 482710.297 2768432.746
Location
NOC DRAWINGS
L.O
TP on Pile and Pilecap
TP 122 482680.840 2768406.567 482684.805 2768403.411
.W
Location NE
MAIN LI
TP on Pile and Pilecap AC IRR.
TP 122A 482661.447 2768382.254 482666.475 2768378.542 800
MM
00 FOR APPROVAL SG OCT 2022
Location LINE CS
LB
Rev.No. DESCRIPTION APP'D DATE
IN
R. MA CONTRACTOR
TP on Pile and Pilecap C IR
TP 123 482639.531 2768351.032 482644.907 2768347.448 mA
Location 800
m
"482640.379 "82642.624
TP 123A 2768354.346 2768357.897 ITS
" "
CLIENT
TP on Pile and Pilecap
TP 124 482619.672 2768318.486 482623.950 2768315.898
Location
TP on Pile and Pilecap
TP 125 482599.359 2768295.682 482613.204 2768287.367
Location CONSULTANT
TP 138 482629.520 2768542.622 482633.872 2768538.136 SH. MOHD. BIN ZAYED ROAD
M
M
Location
AC
DESIGNED BY MK C
TP on Pile and Pilecap
TP 142 482507.845 2768400.801 482516.759 2768392.325 DEVELOPED BY MK PROJECT No.
Location COORDINATED BY AI
CHECKED BY AI
DU194000
TP 143 482424.340 2768336.200 482418.802 2768331.360 Dewa 11Kv VERIFIED BY AI SCALE
" "
LB
DRAWING No.
R1105-GEN-TP-SK-01304
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
KV SS
KEY PLAN
●
15 Match with Existing L.O.W
L.O.W
●
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
●
5 5
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
SHEIKH MOHAMMED
●
3 7.8230
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
TP-133
TP-133A TP-132
TP-131 NOTES
TP-130A
TP-130 1. ALL DIMENSIONS ARE IN METER.
1000 MM G SHEIKH M 2. ALL THE COORDINATES ARE IN DLTM SYSTEM
RP IRR. MA
E= 276
IN OHAMMED
N=
TP-135 LINE PSLB BIN ZAYE
48 87
D ROAD (E
TP-134
●
311)
28 40
36 .18
J
.7 4
●
TP-132A
55
J
TP-129
●
1000 MM G
R P IRR. MAIN
LINE PSLB TP-127
TP-133B
●
TP-133C
TP-128 GENERAL LEGENDS
●
TP-126A
E= =27
TRIAL PIT LOCATION
N
48 68
●
TP-126
28 74
TP-01 TRIAL REF NUMBER
42 6.1
●
.1 62
46
●
●
●
●
●
1400 GRP SLEEVE
●
●
●
●
TP-118A TP-118 TP-117 TP-116 TP-115 TP-112A
J
J
J
TP-113A
MATCH LINE WITH DWG. No.01304
NOC DRAWINGS
POINT-1 POINT-2
TP NUMBER UTILITY INTERFACE REMARKS
EASTING NORTHING EASTING NORTHING
TP POINT-1 POINT-2 00 FOR APPROVAL SG OCT 2022
UTILITY INTERFACE REMARKS TP 128 483167.681 2769091.283 483171.948 2769094.391 Dewa Water
Rev.No. DESCRIPTION APP'D DATE
NUMBER EASTING NORTHING EASTING NORTHING CONTRACTOR
TP 112 483258.937 2769015.972 483255.382 2769012.497 Telecom Etisalat TP 129 483100.735 2769036.155 483111.192 2769044.151 132Kv
TP 115 483026.730 2768800.706 483031.901 2768805.935 Telecom Etisalat TP 132A 482864.945 2768811.915 482868.324 2768815.377 RTA Spare Duct PROJECT TITLE
DRAWING TITLE
TP 118 482959.137 2768723.271 482953.390 2768715.896 Dewa Water TP 132C 482836.755 2768740.184 482842.146 2768746.162 Irrigation
COMBINED UTILITIES DRAWING
WITH TRIAL PIT LOCATION
TP 118A 482917.526 2768672.805 482923.274 2768680.180 Irrigation Line TP 133 482848.845 2768807.270 482845.466 2768803.808 Dewa Water
NAME PROJECT STAGE
PRINTED AT :Wednesday, 19 October 2022 9:35:47 AM
TP 126 483188.263 2769106.205 483184.083 2769103.008 Dewa Water TP 133A 482823.113 2768770.391 482829.732 2768763.328 Irrigation End Cap DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
TP 134 482762.049 2768670.235 482771.229 2768662.048 TP on Pile and Pilecap Location DU194000
TP 126A 483219.505 2769132.612 483223.685 2769135.810 RTA Spare Duct CHECKED BY AI
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01305
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01309 KEY PLAN
L.O.W
D59
EASTING NORTHING EASTING NORTHING
4
4
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
3 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
TP-77 2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 3
SHEIKH MOHAMMED
7.8230
NE TP-78 TP-11E
BIN ZAYED RD.
11
2
AL
TP 10 483689.446 2769510.533 483683.645 2769506.012 Dewa 11 & 132Kv
YALAYAS
1
ST.
(D57)
LAY BY
LI
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETE
TILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
TP-11B
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING
BARRIER
5
1
N
L.O.W
L.O.W
8
6
11
SHEIKH
I
TIE TO
EXISTING MOHAMMED
BARRIER
L.O.W
12
BIN
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
MA
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W
L.O.W
SHOULDER
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
R.
L.O.W
L.O.W
IR TP 10A 483586.148 2769429.089 483592.346 2769432.047 Irrigation Duct 14
SHEIK
H MOH TP-10B
AMME
10
D BIN
00
ZAYED
MM
ROAD
4
TP-83 (E311)
GR
P
IR
TP-10A
R.
MA
IN
LIN
E
TP-10
MATCH LINE WITH DWG. No.01305
TP-08
J
TP-109A TP 109B 483395.734 2769138.161 483403.838 2769144.024 RTA Spare Duct
EWA TP 110 483423.959 2769105.112 483432.210 2769093.700 132Kv Trough
C ORRI
DOR
Telecom Du & ETC +
TP 111 483394.711 2769118.968 483400.477 2769110.977
Dewa 11 & 132Kv
TP-111
TP-109
TP-85A TP 111A 483380.355 2769112.118 483376.255 2769117.695 Telecom Etisalat
TP-85
NOC DRAWINGS
TP-86 TP-89A
TP-110
DEW
TP-87 A CO 00 FOR APPROVAL SG OCT 2022
RRID Rev.No. DESCRIPTION APP'D DATE
OR
LI
NK
TP-95
LI
TP-88
NK
BO
X
TP-89
CLIENT
TP POINT-1 POINT-2
UTILITY INTERFACE REMARKS
NUMBER EASTING NORTHING EASTING NORTHING
TP on Pile and Pilecap TP-96
TP 80 483308.124 2769299.634 483314.054 2769301.609 TP-92 TP-94A
Location TP-97A
CONSULTANT
TP on Pile and Pilecap TP-91
TP 81 483324.624 2769262.597 483330.058 2769265.686
Location
TP-90 TP POINT-1 POINT-2
LI
TP 81A 483365.201 2769267.210 483367.533 2769272.554 Irrigation Line
NK
UTILITY INTERFACE REMARKS
BO
NUMBER
X
EASTING NORTHING EASTING NORTHING
TP 81B 483373.620 2769283.526 483375.554 2769289.040 RTA Spare Duct DEW
TP 90 483689.430 2769266.523 483678.299 2769260.966 Telecom ETC & Du A CO
TP 82 483348.005 2769229.471 483352.735 2769233.556
TP on Pile and Pilecap RRID- DEVELOPMENT OF THE
PROJECT TITLE
R1105
Location
TP 91 483702.709 2769308.968 483707.206 2769303.148 132Kv Trough OR
INTERCHANGE OF GHARN
TP on Pile and Pilecap
TP 83 483389.974 2769199.804 483385.008 2769196.009 AL SABKHA AND
Location
TP 92 483702.812 2769319.315 483707.308 2769313.495 132Kv Trough
TP on Pile and Pilecap SH. MOHD. BIN ZAYED ROAD
TP 84 483425.313 2769179.594 483418.712 2769177.059
Location Telecom ETC & Du + LOCATION DUBAI PROJECT NO. R1105
TP 93 483728.835 2769379.454 483736.208 2769370.354 132Kv Trough
TP on Pile and Pilecap BLOCK
TP 85 483456.248 2769171.641 483453.857 2769162.189
Location DRAWING TITLE
Location COORDINATED BY AI
TP 89A 483573.400 2769277.321 83576.430 2769280.030 RTA Spare Duct TP 109A 483428.942 2769149.782 483424.843 2769155.359 Telecom Etisalat DRAWING No.
R1105-GEN-TP-SK-01306
MATCH LINE WITH DWG. No.01314
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
KEY PLAN
J
15 Match with Existing L.O.W
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
Dewa 11 & 132Kv +Telecom
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
7
ETC & Du + ITS
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
TP 06 484126.369 2769842.008 484130.865 2769836.189 Irrigation + Dewa Water 1. ALL DIMENSIONS ARE IN METER.
2. ALL THE COORDINATES ARE IN DLTM SYSTEM
ITS + Irrigation + Telecom
TP 06A 484127.887 2769832.780 484118.899 2769826.097
Du
Telecom ETC + Irrigation +
TP 06B 484116.472 2769824.093 484110.736 2769819.491
Dewa 11Kv
Telecom Du & ETC +Dewa
TP 07 483973.641 2769740.119 483978.137 2769734.299
132Kv
N-4
TP-07
TP 97A 483868.089 2769502.818 483871.504 2769505.621 RTA Spare Duct
N-4
TP-07A
10 TP 98 483914.148 2769480.487 483921.014 2769471.325 132Kv Trough
00 MM
GRP I
RR. M
AIN L LINK BOX
INE
N-4
N-4
SHEIK
TP-06B TP-06A H MO
HAMM
N-4
TP-06 ED BI
J
N ZAYE
D RO
AD (E L.O
3 11)
N-4
.W
J
TP-05A
N-4
TP-05
MATCH LINE WITH DWG. No.01306
DEW PSLB
A CO
RRID 4W
OR
TP-99 1W
TP-99A
TP-98
JJ
TP-100
TP-106
TP-105
6W
TP-104
NOC DRAWINGS
TP-101
6W
TP-106A 00 FOR APPROVAL SG OCT 2022
TP-102 Rev.No. DESCRIPTION APP'D DATE
TP-103 CONTRACTOR
TP-102A
TP-103A
L.O.W DEW
L.O.W A CO TP-03F
RRID
OR CLIENT
LI
POINT-1 POINT-2
NK
TP
BO
UTILITY INTERFACE REMARKS
X
NUMBER EASTING NORTHING EASTING NORTHING CONSULTANT
J
TP 101 484089.216 2769610.833 484093.713 2769605.013 Telecom Du & ETC + Dewa 11 Kv AL SABKHA AND
SH. MOHD. BIN ZAYED ROAD
TP 102 484098.858 2769601.208 484104.923 2769594.468 Dewa Water + Telecom ETC LOCATION DUBAI PROJECT NO. R1105
BLOCK
TP 102A 484105.983 2769593.319 484112.048 2769586.579 Dewa 11Kv DRAWING TITLE
TP 103 484123.237 2769622.173 484128.551 2769615.796 Dewa Water + Telecom ETC COMBINED UTILITIES DRAWING
WITH TRIAL PIT LOCATION
TP 103A 484135.065 2769606.416 484129.038 2769613.114 Dewa 11Kv
NAME PROJECT STAGE
PRINTED AT :Wednesday, 19 October 2022 9:35:47 AM
TP 105 484107.242 2769666.970 484112.414 2769659.994 Telecom Du + Dewa 11 & 132Kv COORDINATED BY AI
CHECKED BY AI
DU194000
TP 106 484111.649 2769680.305 484116.146 2769674.485 Dewa 11Kv VERIFIED BY AI SCALE
R1105-GEN-TP-SK-01307
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
KEY PLAN
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
EASTING NORTHING EASTING NORTHING
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
Irrigation
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
J
J
1. ALL DIMENSIONS ARE IN METER.
TP 107A 484751.400 2770180.021 484754.108 2770182.388 RTA Spare Duct 2. ALL THE COORDINATES ARE IN DLTM SYSTEM
TP 107D 484635.924 2770090.714 484641.046 2770095.245 RTA Spare Duct GENERAL LEGENDS
TRIAL PIT LOCATION
TP 108 484867.052 2770260.415 484873.339 2770264.231 Dewa Water TP-01 TRIAL REF NUMBER
TP-03E
TP-03
TP-01
TP-01A
L.
TP-02 O.
W
J
J
TP-02A
MATCH LINE WITH DWG. No.01307
J
J
J JJJ
.W
L.O
TP-03D
SHE
IKH
MOH
AMM
ED
LI
TP-03C
NK
BIN
BO
X
ZAY
.W
ED
ROA
L.O
DEW D (E
311
A CO )
RRID
O
JJ
R
J
TP-03B
TP-03A NOC DRAWINGS
TP-107D TP-107C
L.O.W
TP-107
CLIENT
J
DEW
TP POINT-1 POINT-2 A CO TP-108
UTILITY INTERFACE REMARKS RRID
NUMBER EASTING NORTHING EASTING NORTHING O R CONSULTANT
J J JJ
AL SABKHA AND
TP 02 484664.129 2770253.815 484668.625 2770247.995 Dewa Water + Irrigation
SH. MOHD. BIN ZAYED ROAD
LOCATION DUBAI PROJECT NO. R1105
DRAWING TITLE
J
COORDINATED BY AI
TP 03B 484593.478 2770038.931 484592.464 2770047.083 DU194000
+Telecom ETC CHECKED BY AI
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01308
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01310 KEY PLAN
L.O.W
POINT-1 POINT-2
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
NDRC
2 2
.W
L.O
L.O.W
1 2 9
2.7692
TP 12A 483309.655 2769542.425 483315.006 2769535.036
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
+ITS + Dewa 11Kv
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7
TP-64
L.O.W
Irrigation
L.O.W
L.O.W L.O.W
TP 12B
L.O.W
L.O.W
14
J
NOTES
TP 13 483301.517 2769550.545 483306.727 2769545.630 Dewa 11Kv
1. ALL DIMENSIONS ARE IN METER.
2. ALL THE COORDINATES ARE IN DLTM SYSTEM
TP 14 483312.103 2769555.761 483311.531 2769548.429 132Kv Trough
NDRC
TP-65A
TP-24A GENERAL LEGENDS
TP-65 TP 17 483210.565 2769642.794 483216.109 2769637.961 Dewa Water TRIAL PIT LOCATION
TP-24
TP-01 TRIAL REF NUMBER
TP-66 TP 17A 483187.936 2769644.584 483194.816 2769638.306 Dewa 11Kv
TP-67
TP 19 483172.329 2769662.600 483178.285 2769657.263 Dewa Water
Dewa Road
TP 20 483123.959 2769712.220 483128.455 2769706.400
ACCESS ONLY
MAINTENANCE
TP-23
Crosswing Duct
L.O.W
Dewa Road
TP 21 483108.707 2769725.226 483113.203 2769719.407 Crosswing Duct
TP-68 E
TP-22
.W ANC LY TP 22 483084.164 2769756.597 483088.661 2769750.777 Dewa Water
O
L. EN ON
TP-69 NT S
AI ES
M C
AC TP 23 483067.528 2769762.531 483072.024 2769756.711 Dewa Water
Dewa 11Kv +ETC
TP 24 483025.713 2769793.490 483030.210 2769787.670 Road Crossing
TP-21 Ducts
TP 24A 483017.213 2769794.696 483021.039 2769791.355 RTA Spare Duct
Rev.No.
TP 71 483158.846 2769624.704 483163.706 2769619.184 Dewa Water CONTRACTOR
TP-72A TP-17
TP 71A 483166.711 2769622.147 483174.893 2769614.872 RTA Spare Duct
INTERCHANGE OF GHARN
MAINT
L.O.W
BLOCK
ONLY
ANCE
DRAWING TITLE
TP-14
COMBINED UTILITIES DRAWING
J WITH TRIAL PIT LOCATION
TP-75
DESIGNED BY MK C
J
COORDINATED BY AI
TP-76 DU194000
TP-12 CHECKED BY AI
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01309
MATCH LINE WITH DWG. No.01306
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01311 KEY PLAN
15
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
TP-55 TP-54
8
4
1
34
3
3
4
1
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
TP 26 482922.881 2769891.115 482928.129 2769885.963 Dewa 132Kv
L.O.W
11
2 2
.W
Dewa Road
L.O
L.O.W
2.7692
2.7257
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
GP R S
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
132Kv Trough
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
NOTES
TP 29 482634.484 2770151.225 482639.761 2770146.102 Dewa 11Kv
TP-56 TP-54B 1. ALL DIMENSIONS ARE IN METER.
2. ALL THE COORDINATES ARE IN DLTM SYSTEM
TP 29A 482635.086 2770133.983 482640.363 2770128.860 Dewa 11Kv
Dewa Road
TP 30 482622.967 2770160.632 482626.407 2770157.292 Crosswing Duct
TP-57
TP 54 482544.778 2770222.833 482550.301 2770217.976 Dewa 11Kv TP-61
JJ TP-58
TP-30
J J GENERAL LEGENDS
TP 54A 482552.958 2770215.855 482558.481 2770210.998 Irrigation
JJJJJJ TP-27 TRIAL PIT LOCATION
TP-59
TP-01 TRIAL REF NUMBER
TP 54B 482581.435 2770193.633 482586.958 2770188.776 Dewa 11Kv
NOC DRAWINGS
CONTRACTOR
CONSULTANT
PROJECT TITLE
BLOCK
DRAWING TITLE
DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
CHECKED BY AI
DU194000
TP-63 VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01310
MATCH LINE WITH DWG. No.01309
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01312 KEY PLAN
L.O.W
4
4
1000mm G
TP-37
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
13
RP IR
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
R.MAIN L
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
AL
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
AS
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
AY 14
EL
INE
STR
TP-53 EE NOTES
TP-53B T
1. ALL DIMENSIONS ARE IN METER.
TP-53A 2. ALL THE COORDINATES ARE IN DLTM SYSTEM
13
2K
V
TP-36
J
TP-35C
TP-36A
J
TRIAL PIT LOCATION
TP-36B
TP-53C TP-35B TP-35D
TP-01 TRIAL REF NUMBER
TP-35E
TP-35A
TP-35
13
13
TP-34
2K
2
KV
V
13
13
2K
2
KV
V
13
13 2KV
13
13
2K
2K
2
V
KV
V
POINT-1 POINT-2
TP NUMBER UTILITY INTERFACE REMARKS
J
GHARN AL SABKHA STREET D59
EASTING NORTHING EASTING NORTHING
13 V
13
13
13
2K
2K
2K
2K
TP-33
V
V
V
TP 31 482512.727 2770284.532 482504.882 2770275.238 132Kv Trough
TP on Pile and Pilecap
TP 32 482350.829 2770381.887 482343.951 2770374.086
Location
TP on Pile and Pilecap
TP 33 482309.546 2770418.240 482302.673 2770410.435
Location N-4 N-4 N-4 N-4
TP on Pile and Pilecap
13 V
13 KV
13
13
2K
2K
2K
2
TP 34 482268.274 2770454.584 482261.401 2770446.778
V
V
J
Location TP-32
TP on Pile and Pilecap
TP 35 482233.676 2770484.898 482226.803 2770477.093
Location NOC DRAWINGS
Dewa 132Kv + RTA Spare
13
2K
V
TP 35A 482237.915 2770513.429 482250.618 2770517.723
Ducts
00 FOR APPROVAL SG OCT 2022
TP 35B 482254.903 2770587.050 482246.394 2770580.362 Dewa 11Kv +Irrigation Rev.No. DESCRIPTION APP'D DATE
13
13
2K
2
KV
CONTRACTOR
V
TP 35C 482269.107 2770592.050 482275.209 2770596.366 Dewa Water
BLOCK
TP 53 482106.933 2770482.677 482102.162 2770477.096 Dewa 132Kv DRAWING TITLE
TP 53B 482137.101 2770491.267 482141.388 2770490.662 Irrigation Ducts NAME PROJECT STAGE
PRINTED AT :Wednesday, 19 October 2022 9:35:47 AM
TP-31 DESIGNED BY MK C
TP 53C 482174.540 2770465.593 482179.619 2770461.326 RTA Spare Duct DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
CHECKED BY AI
DU194000
TP 53D 482043.397 2770461.719 482046.598 2770462.797 ITS Ducts VERIFIED BY AI SCALE
TP 53E 482014.517 2770453.730 482019.593 2770455.185 Irrigation Ducts APPROVED BY AI DATE OCT 2022
DRAWING No.
R1105-GEN-TP-SK-01311
MATCH LINE WITH DWG. No.01310
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01313 KEY PLAN
L.O.W
NUMBER
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
TP 38A 481980.525 2770453.810 481991.842 2770454.793 RTA Spare Ducts BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
TP-46
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
Dewa 11Kv + Irrigation Ducts
13
13
TP 38B 481898.457 2770456.609 481918.521 2770453.773
2K
2K
V
V
NOTES
1.7
00
0
TP on Pile and Pilecap
TP 41 481961.037 2770725.767 481954.169 2770717.958
Location TP-45
TP on Pile and Pilecap
TP 42 481929.663 2770759.729 481916.285 2770744.492 GENERAL LEGENDS
Location
TRIAL PIT LOCATION
TP 43 481843.914 2770877.932 481837.046 2770870.122 132Kv Trough TP-44 TP-01 TRIAL REF NUMBER
13
13
2K
2K
V
V
TP 45A 481776.948 2770901.447 481783.345 2770896.475 RTA Spare Duct + Irrigation
13
13
2K
2K
V
V
+ RTA Spare Ducts
13
13
2K
2K
2K 13
2K
V
V
V 2K
V
13
2K
V
V
TP-42
13
13
2
2K
KV
13
13 KV
13 V
V
13 V
2
2K
2K
2K
V
NOC DRAWINGS
TP-41
00 FOR APPROVAL SG OCT 2022
Rev.No. DESCRIPTION APP'D DATE
13
13
132K
13
2
2KV
2K
KV
V
CONTRACTOR
CLIENT
TP-40
13 V
13
132KV
2K
2K
CONSULTANT
V
13
13
2K
2K
PROJECT TITLE
V
2K
2K
INTERCHANGE OF GHARN
13
13 V
2K
2K
V
13 1V3 V
13 13
V V
13
132KV
13
2K
2K
V
V
BLOCK
DRAWING TITLE
TP-38B
COMBINED UTILITIES DRAWING
WITH TRIAL PIT LOCATION
DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
CHECKED BY AI
DU194000
TP-38A VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01312
MATCH LINE WITH DWG. No.01311
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01315 KEY PLAN
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
TP 46A 481683.404 2770979.538 481689.025 2770974.654 ETC Ducts
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
TP-47C
NOC DRAWINGS
CONTRACTOR
CLIENT
TP-47A
TP-47B
PROJECT TITLE
TP-47 BLOCK
DRAWING TITLE
DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
TP-46A DU194000
TP-46B CHECKED BY AI
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01313
MATCH LINE WITH DWG. No.01312
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
MATCH LINE WITH DWG. No.01306 KEY PLAN
L.O.W
4
4
14
1.0500
L.O.W
L.O.W
L.O.W
L.O.W
4
2 2
8 1 3
3 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 3
SHEIKH MOHAMMED
7.8230
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
LAY
BY
4
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETE
TILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING
BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
L.O.W
12
BIN
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W
L.O.W
SHOULDER
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
NOTES
GENERAL LEGENDS
TRIAL PIT LOCATION
TP-01 TRIAL REF NUMBER
NOC DRAWINGS
CONTRACTOR
CLIENT
CONSULTANT
PROJECT TITLE
BLOCK
DRAWING TITLE
DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
CHECKED BY AI
DU194000
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01314
CAD FILE: D:\Working\R1105\R1105-GEN-TP-SK-01301-1315.dwg
KEY PLAN
L.O.W
4
4
D59
7.3017 1.5500
14
1.0500
L.O.W
NUMBER
L.O.W
L.O.W
L.O.W
4
2 2
34 1
4 4
15
1 4
L.O.W
3
3 1
L.O.W
4
4
L.O.W
L.O.W
11
2 2
.W
L.O
L.O.W
1 2 9
2.7692
2.7257
3 7.8230
3
SHEIKH MOHAMMED
BIN ZAYED RD.
11
2
AL
YALAYAS
1
ST.
(D57)
LAY BY
EMERGENCY TIE TO EXISTING
BARRIER
SHEIKH MOHAMMED
BIN ZAYED
ROAD (E311)
EMERGENCY
L.O.W
SHEIKH
MOHAMMED
BIN ZAYED
ROAD
2
(E311)
FOR TEMPORARY LINK IS PART OF 2030 DESIGN
L.O.W
BARRIER
CONCRETETILL 2030
CLOSURE
ROAD (E311)
BIN ZAYED
MOHAMMED
SHEIKH
3 4 5 6
(E311)
BIN ZAYED ROAD
SHEIKH MOHAMMED
L.O.W
L.O.W
TIE TO EXISTING BARRIER
5
1
L.O.W
L.O.W
8
6
11
SHEIKH
TIE TO
EXISTING MOHAMMED
BARRIER
BIN L.O.W
12
ZAYED
ROAD
(E311) L.O.W
EMERGENCY LAY BY
L.O.W
L.O.W
L.O.
8 W
8
L.O.W
L.O.W
5
TIE TO
EXISTING TIE
L.O.W
6
BARRIER TO
EXISTING
L.O.W
L.O.W SHOULDER
L.O.W
SHEIKH
MOHAMMED
GUARD RAIL
BIN
ZAYED
L.O.W
ROAD
12
END TERMINAL
(E311)
7 7 L.O.W
L.O.W
L.O.W L.O.W
L.O.W
L.O.W
14
TP 51A 481205.237 2771397.074 481208.890 2771393.660 ITS 1. ALL DIMENSIONS ARE IN METER.
2. ALL THE COORDINATES ARE IN DLTM SYSTEM
GENERAL LEGENDS
TRIAL PIT LOCATION
TP-01 TRIAL REF NUMBER
132KV SS
JPRK
L.O.W
Match with E
xisting
TP-51B
CONTRACTOR
CLIENT
TP-51A
CONSULTANT
TP-51
PROJECT TITLE
AL SABKHA AND
V
1
V
13
2K 32K 32K 2KV 2KV 2KV 2KV 2KV KV KV
V
1
V
BLOCK
1
DRAWING TITLE
DESIGNED BY MK C
DEVELOPED BY MK PROJECT No.
COORDINATED BY AI
CHECKED BY AI
DU194000
VERIFIED BY AI SCALE
DRAWING No.
R1105-GEN-TP-SK-01315
13
2K
V