Professional Documents
Culture Documents
A
L
A
GH
AU
I
RN
D
D
A
IA
HQ
AN
LW
K
GHAIDAND ANNEXURE B
U
AK
TO
AR
MU
H
K
A
Y
W
O
T
N
A
RE
AL
K
OK
HH
ZONE-02
EA
RY
LK
A
HA
KL
KUNG
R
L
A
K
H
E
K
O
H
BAHI KHAWAZAI
R
E
E
N
A
M
A
Z
DOGH
FAQEER
INT
ABAD
A
J
A
W
R
A
V
C
H
ER
AF
ZANAWAR
AT
GH
CHINA
ION
ZONE-01
AN
GRID STATION
AL
IST
I
K
H
E
L
G
A
Z
BO
AN
ASHRAF
RD
ABAD
D
A
C
K
S
U
R
ER
JU
UN
A
RA
B
AK
BO
HN
AA
NO
AR
GU
R
STAFF QUARTER AT GATH
AO
BR
AU
HN
R
K
A
K
X=2287854.79 Y=12488892.82
PASHAM SPERO
A
K
O
R
U
N
K
A
K
Y
GHUNDAI KALY
I
G
A
N
T
A
B
L
RA
EK
NA
ZN
AD
S.D.O OFFICE & RESIDENCE =10 KW JUANR
HU
SN
HA
I
BK
UO
KR
X = 2283694.56 Y = 12490131.80 KOR
L=2,266' KAHLO
L=
DUCK QALAGAI FROM
ELBO-1 GHAL
7,
HL
K
OY
L
K
AK
CA
LANA
I
33
ELBO-1
4'
PLEASE
,2 20'
AL
JK
UH
ME
L=8
ON
OA
D
D
AK
WU
REFER
R
INTERMEDIATE PUMPING STATION TO NOTE
PUMPING-3 ROUTE ON WHICH THE POWER
POWER CONSUMPTION=110 KW LINE WILL BE INSTALLED
STAFF QUARTER =05 KW
X =2284709.02 Y =12489162.61 COLLECTING TANK
POWER CONSUMPTION =165 KW
ELBO-2 STAFF QUARTER =05 KW
PLEASE X =2299865.16Y=12468506.45
REFER
TO NOTE
INTERMEDIATE PUMPING L=
STATION PUMPING-2 ELBO-3 23 PUMPS INSTALLED OVER
POWER CONSUMPTION=165 KW PLEASE ,8 90 PERCOLATION WELLS
STAFF QUARTER =05 KW REFER TO ELBO-2 ' No.OF PUMPS = 05
X =2284998.99 Y =12483799.92 NOTE POWER CONSUMPTION=20 KW
NOTE:
INTERMEDIATE PUMPING STATION THE ELECTRIC SUPPLY WILL BE
PUMPING-1 ALONG THE KATCHA ROAD BUILT FOR
POWER CONSUMPTION=165 KW ELBO-3
ARMY CHECK POST ELBO 1,2 AND 3
STAFF QUARTER =05 KW
X =2291982.64 Y =12483065.31 LEGEND
KABUL RIVER
RAOD
THIS DRAWING SHOULD NOT BE CHANGED OR REPRODUCED WITHOUT WRITTEN PERMISSION FROM THE CONSULTANT.
PROJECT BOUNDARY
INTERNATIONAL BORDER
INTERMEDIATE
PUMPING STATION
SURFACE TANK
CLIENT: CONSULTANT: PROJECT TITLE: Scale: Drawing Title:
ES CONSULTANT (PVT) LTD Drawn By: NAVEED AKHTAR
1"=10500'
House # 85, A-3, Street No.9, Johar Town Lahore. Designed by: ENGR.FAIZAN AHMAD Date:
WAPDA POWER TRANSMISSION MAIN
PUBLIC HEALTH ENGINEERING DEPARTMENT Tell: +92-42-35235702 CHD./VER. ENGR M.KHALID oct. ,2020 ROUTE FOR PUMPING MACHINERY
Fax: +92-42-35235703 FEASIBILITY STUDY & DESIGN OF DRINKING WATER SUPPLY Sheet No.
Revision Revision Date Revision tital Drawing No.
MERGED AREAS KHYBER PAKHTUNKHWA Cell: 0300-4848025 SCHEME KHEWAIZAI / BAIZAI BASED ON RIVER KABUL
E-mail: esc@esclahore.com.pk R-1 10-08-2021
--- WS---
Web: http://www.esclahore.com.pk 02
ectronic File Name: EFN