ETABS 20.2.

0 12/21/2022

1 2 3 4 5 6 7 8 9
2.3 (m) 0.6 (m) 3.1 (m) 2.3 (m) 6 (m) 6 (m) 3 (m) 2.5 (m)

1.5 (m)
A F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250
2.25 (m)

1.5 (m)

B F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250 F1500X1500X250


1.5 (m)

4.6 (m)

4.2 (m)
3 (m)

F2400X2400X350

D
Y
1.5 (m)

E F1500X1500X250 X F1500X1500X250 F1500X1500X250

Iron Casting Factory.EDB Plan View - Base - Z = 0 (m)