BPM 305 (TMA01) – PROJECT SCHEDULING AND CONTROL (MOHAMED ALI B1210887)

(i) 250mm thick reinforced concrete suspended floor slab with


1500x1500x150mm drop panels and supported by 400x400mm reinforced
concrete columns on a 6500mm grid; (20 marks)

The cost per m2 is 21,145.24 ÷ 169 = $125.12 as calculated in the Table.

13 m
3.25 m 6.5 m 3.25 m

  m
   5
   2
 .
   3

  m   m
   3    5
 .
   1    6

  m
   5
   2
 .
   3

Legend :
Slab (250 mm)

Drop Panel (1500 x 1500 x 150 mm)

Column (400 x 400 mm)

Page 16 of 22