BPM 305 (TMA01) – PROJECT SCHEDULING AND CONTROL (MOHAMED ALI B1210887)

(b) You are to advise the client on the cost per m 2 for the composite item of upper 
floors includ
including
ing beam
beams/drop
s/drop panels
panels and col
columns
umns of a building
building (ass
(assuming
uming fl
floor
oor to floor 
height of 3.50m) having the following constructions:

 A list of unit rates is given in


in Table Q2.

Description Unit Rate


Reinforced Concrete in beams and slab $185/ m3
Formwork to soffit of slabs $41/ m2
Formwork to drop panels 100-200mm high $11.50/m
Reinforcement in slabs $1,450/ton
(Y12 at 300c/c top and bottom both ways)
Y12 reinforcement bars = 0.888kg/m
Screeded finish and curing $3.50/ m2
Reinforced Concrete in columns $205/ m3
Formwork to sides and soffit of beams $56/ m2
Formworks to sides of columns $53/ m2
Reinforcement in columns/beams $1,450/ton
(Y20 and R10)
Y20 reinforcement bars = 2.466kg/m
R10 reinforcement bars = 0.616kg/m

Column
6 Nos of Y20 along the length of columns
R10 ties at 300c/c

Beam
4 Nos of Y20 along the length of beams
R10 ties at 150c/c

Table Q2: Unit Rates