BPM 305 (TMA01) – PROJECT SCHEDULING AND CONTROL (MOHAMED ALI B1210887)
(b) You are to advise the client on the cost per m 2 for the composite item of upper
floors includ
including
ing beam
beams/drop
s/drop panels
panels and col
columns
umns of a building
building (ass
(assuming
uming fl
floor
oor to floor
height of 3.50m) having the following constructions:
Column
6 Nos of Y20 along the length of columns
R10 ties at 300c/c
Beam
4 Nos of Y20 along the length of beams
R10 ties at 150c/c