Professional Documents
Culture Documents
Structure 3D View
Software: ROBOT
2018
2
1. GENERAL
1.1 SCOPE
1.2 The purpose of the building is, residential building. the materials used
are R.C structures of framed type, Solid two way slabs and cement blocks for wall
elevation, whereas the roof is made up with wood trusses covered with metal
sheets.
DESIGN INFORMATION
VICTOR Client
Lx = short span
ly = long span
Po rtee(lx )
Efficient thickness of slab = 2 0*2.0
4.633 * 10
hs
1115.75mm;
20 * 2.0
Let take a slab of thickness hs = 120mm for the whole slab
Let assume h (the overall depth of slab) to be 120mm so that construction reinforcement bar
being easy on site. We will only consider the fire resistance of 1.5 hour to get the cover. From
table 3.4 given in the BS 8110, the cover for 1.5 hour fire resistance is 20mm.
2
Finishes 1.5 kN/m
2
Dead load = 3+1.5 = 4.5 kN/m
2
Imposed load = 1.5 kN/m
Design load = 1.4 Gk+1.6Qk= 1.4×4.5+1.6x 1.5 = 8.7 kN/m
2.2.3 Moment result:
3.0 BEAM 1
3.2 Geometry:
2.2.1 Span Position L.supp. L R.supp.
(m) (m) (m)
P1 Span 0.20 4.00 0.20
Span length: Lo = 5.00 (m)
Section from 0.00 to 4.80 (m)
20 x 35 (cm)
without left slab
without right slab
150
[kN]
100
50
-50
-100
[m]
-150
0 1 2 3 4 5
Shear Force ULS: V Vr Vc(stirrups) Vc(total)
1000
800 [mm2/m]
600
400
200
0
200
400
600
800 [m]
1000
0 1 2 3 4 5
Reinforcement Area for Shear: Ast Asr AsHang
3.4.4 Deflection and cracking
at(s-t) - initial deflection due to total load
ap(s-t) - initial deflection due to long-term load
ap(l-t) - long-term deflection due to long-term load
a - total deflection
aall - allowable deflection
-10
-5
10
15 [m]
20
0 1 2 3 4 5
Deflections: ap(s-t) ap(l-t) at(s-t) a a adm
0.3
[mm]
0.2
0.1
0.1
0.2
[m]
0.3
0 1 2 3 4 5
Cracking: Cw Cw adm
ULS SLS
Abscissa Q max. Q max. Cw
(m) (kN) (kN) (mm)
0.20 60.61 0.00 0.00
0.60 55.81 0.00 0.00
1.10 34.64 0.00 0.00
1.60 28.64 0.00 0.00
2.10 13.55 0.00 0.00
2.60 0.07 0.00 0.00
3.10 -5.93 0.00 0.00
3.60 -17.17 0.00 0.00
4.10 -23.18 0.00 0.00
12
4.60 -23.40 0.00 0.00
5.00 -28.20 0.00 0.00
3.6 Reinforcement:
2.6.1 P1 : Span from 0.20 to 4.20 (m)
Longitudinal reinforcement:
bottom
3 T 12 l = 5.68 from 0.03 to 5.17
assembling (top)
3 T 12 l = 4.51 from 0.60 to 5.10
support (T)
3 T 12 l = 1.73 from 0.03 to 1.41
1 T 12 l = 1.88 from 0.08 to 1.51
3 T 12 l = 1.23 from 4.28 to 5.17
Transversal reinforcement:
main
stirrups 44 R8 l = 0.79
e = 1*0.09 + 21*0.22 (m)
pins 44 R 8 l = 0.79
e = 1*0.09 + 21*0.22 (m)
Steel T
Total weight = 36.69 (kG)
Density = 100.79 (kG/m3)
Average diameter = 12.0 (mm)
Survey according to diameters:
Steel R
Total weight = 13.77 (kG)
Density = 37.84 (kG/m3)
Average diameter = 8.0 (mm)
Survey according to diameters:
TWAGIRIMANA PROJECT
4.2 Geometry:
2.2.1 Span Position L.supp. L R.supp.
(m) (m) (m)
P1 Span 0.20 4.80 0.20
Span length: Lo = 5.00 (m)
Section from 0.00 to 4.80 (m)
20 x 20 (cm)
without left slab
without right slab
ERIC PROJECT
14
4.3 Calculation options:
-10
-5
5
10 [m]
15
0 1 2 3 4 5
Bending Moment ULS: M Mr Mc
80
[kN]
60
40
20
0
-20
15
-40
-60 [m]
-80
0 1 2 3 4 5
Shear Force ULS: V Vr Vc(stirrups) Vc(total)
300
200
100
0
100
200 [m]
300
0 1 2 3 4 5
Reinforcement Area for Bending: Abt Abr Abmin
1500
[mm2/m]
1000
500
500
1000
[m]
1500
0 1 2 3 4 5
Reinforcement Area for Shear: Ast Asr AsHang
0.3
[mm]
0.2
0.1
0.1
0.2
[m]
0.3
0 1 2 3 4 5
Cracking: Cw Cw adm
4.5 Theoretical results - detailed results:
4.5.1 P1 : Span from 0.20 to 4.20 (m)
ULS SLS
Abscissa M max. M min. M max. M min. A bottom A top A compressive
(m) (kN*m) (kN*m) (kN*m) (kN*m) (mm2) (mm2) (mm2)
0.20 0.00 -17.72 0.00 0.00 8 349 8
0.60 0.00 -9.64 0.00 0.00 0 164 0
1.10 0.00 -1.49 0.00 0.00 0 24 0
1.60 4.72 -0.00 0.00 0.00 76 0 0
2.10 8.98 -0.00 0.00 0.00 152 0 0
2.60 11.30 -0.00 0.00 0.00 197 0 0
3.10 11.68 -0.00 0.00 0.00 205 0 0
3.60 10.11 -0.00 0.00 0.00 174 0 0
4.10 6.60 -0.00 0.00 0.00 108 0 0
4.60 1.15 -0.00 0.00 0.00 18 0 0
5.00 0.23 -5.00 0.00 0.00 4 80 0
ULS SLS
Abscissa Q max. Q max. Cw
(m) (kN) (kN) (mm)
0.20 21.35 0.00 0.00
0.60 18.25 0.00 0.00
1.10 14.36 0.00 0.00
1.60 10.47 0.00 0.00
2.10 6.58 0.00 0.00
2.60 2.70 0.00 0.00
3.10 -1.19 0.00 0.00
3.60 -5.08 0.00 0.00
4.10 -8.96 0.00 0.00
4.60 -12.85 0.00 0.00
5.00 -15.96 0.00 0.00
4.6 Reinforcement:
4.6.1 P1 : Span from 0.20 to 4.20 (m)
Longitudinal reinforcement:
bottom
2 T 12 l = 5.80 from 0.03 to 5.17
assembling (top)
2 T 12 l = 4.01 from 1.10 to 5.10
support (T)
2 T 12 l = 2.10 from 0.03 to 1.78
2 T 12 l = 1.25 from 0.08 to 0.88
2 T 12 l = 1.10 from 4.42 to 5.17
Transversal reinforcement:
main
stirrups 48 R8 l = 0.61
e = 1*0.05 + 47*0.10 (m)
pins 48 R 8 l = 0.61
e = 1*0.05 + 47*0.10 (m)
Steel T
Total weight = 25.29 (kG)
Density = 121.60 (kG/m3)
Average diameter = 12.0 (mm)
Survey according to diameters:
Steel R
Total weight = 11.46 (kG)
Density = 55.12 (kG/m3)
Average diameter = 8.0 (mm)
Survey according to diameters:
TWAGIRIMANA PROJECT
18
5.2 Geometry:
2.2.1 Rectangular 20 x 20 (cm)
2.2.2 Height: L = 3.38 (m)
2.2.3 Slab thickness = 0.12 (m)
2.2.4 Beam height = 0.35 (m)
2.2.5 Cover = 2 (cm)
5.4 Loads:
5.5.1.1 Eccentricity:
5.5.2 Reinforcement:
5.6 Reinforcement:
Main bars:
4 T 12 l = 3.25 (m)
Transversal reinforcement:
stirrups: 21 R 8 l = 0.61 (m)
Steel T
Total weight = 11.53 (kG)
3
Density = 98.53 (kG/m )
Average diameter = 12.0 (mm)
Reinforcement survey:
Steel R
Total weight = 5.02 (kG)
Density = 42.87 (kG/m3)
Average diameter = 8.0 (mm)
Reinforcement survey:
TWAGIRIMANA
7. ANALYSIS AND DESIGN OF FOUNDATION
7.1.1 Assumptions
7.1.2 Geometry:
7.1.3 Materials
7.1.4 Loads:
Foundation loads:
Case Nature Group N Fx Fy Mx My
(kN) (kN) (kN) (kN*m) (kN*m)
COMB1 design ---- 257.38 -1.96 -1.63 1.05 1.39
Backfill loads:
Case Nature Q1
24
25
(kN/m2)
7.2.2 Soil:
7.3 RC design
7.3.1 Assumptions
Exposure : mild
Shear
Spread footing:
bottom:
top:
A'sx = 0 (mm2/m)
A'sy = 0 (mm2/m)
As min = 0 (mm2/m)
Column pier:
Longitudinal reinforcement A = 160 (mm2) A min. = 160
(mm2)
A = 2 * (Asx + Asy)
Asx = 30 (mm2) Asy = 50 (mm2)
2.3.2 Pier
Longitudinal reinforcement
Along X axis:
2 T 12 l = 1.76 (m) e = 1*-0.02 + 1*0.03
Along Y axis:
2 T 12 l = 1.80 (m) e = 1*-0.05
Transversal reinforcement
5 R8 l = 0.45 (m) e = 1*0.05
7.4Material survey:
Concrete volume = 0.27 (m3)
Formwork = 1.56 (m2)
Steel T
Total weight = 5.68 (kG)
Density = 21.29 (kG/m3)
Average diameter = 12.0 (mm)
Survey according to diameters:
Steel R
Total weight = 7.20 (kG)
Density = 26.97 (kG/m3)
Average diameter = 11.0 (mm)
Survey according to diameters:
TWAGIRIMANA
8. FOUNDATION ANALYSIS & DESIGN DOUBLE COLUMN (F2)
8.1.1 Assumptions
8.1.2 Geometry:
c1 = 5 (cm)
c2 = 5 (cm)
8.1.3 Materials
8.1.4 Loads:
Foundation loads:
Case Nature Group Pier N Fx Fy Mx My
(kN) (kN) (kN) (kN*m) (kN*m)
COMB1 design ---- 1 -44.57 -5.05 0.24 -0.25 -5.35
2 185.26 -5.62 0.02 -0.01 -5.95
Backfill loads:
Case Nature Q1
(kN/m2)
8.2.2 Soil:
Silty sand
• Soil level: 0.00 (m)
3
• Unit weight:2000 (kG/m )
3
• Unit weight of solid: 2502.25 (kG/m )
• Internal friction angle: 42.0 (Deg)
• Cohesion: 0.00 (kPa)
8.3 RC design
8.3.1 Assumptions
Exposure : mild
Shear
Spread footing:
bottom:
top:
As min = 0 (mm2/m)
Column pier: 1
Longitudinal reinforcement A = 672 (mm2) A min. = 320 (mm2)
A = 2 * (Asx1 + Asy1)
Asx1 = 223 (mm2) Asy1 = 113 (mm2)
Column pier: 2
Longitudinal reinforcement A = 160 (mm2) A min. = 160 (mm2)
A = 2 * (Asx2 + Asy2)
Asx2 = 30 (mm2) Asy2 = 50 (mm2)
8.3.2 Pier
Column pier: 1
Longitudinal reinforcement
Along X axis:
2 T 12 l = 1.76 (m) e = 1*-0.12 + 1*0.03
Along Y axis:
2 T 12 l = 1.80 (m) e = 1*-0.15
Transversal reinforcement
5 R8 l = 0.45 (m) e = 1*-0.05
Column pier: 2
Longitudinal reinforcement
Along X axis:
2 T 12 l = 1.76 (m) e = 1*0.08 + 1*0.03
Along Y axis:
2 T 12 l = 1.80 (m) e = 1*0.05
Transversal reinforcement
5 R8 l = 0.45 (m) e = 1*0.15
Steel T
Total weight = 17.58 (kG)
Density = 36.63 (kG/m3)
Average diameter = 12.0 (mm)
Survey according to diameters:
Steel R
Total weight = 14.40 (kG)
Density = 30.00 (kG/m3)
Average diameter = 11.0 (mm)
Survey according to diameters:
TWAGIRIMANA
9. ANALYSIS & DESIGN OF STAIR
a) Load on stair:
1. 40 2. 20 1. 40
SHEAR FOR CE V m a x = 3 8.1 kN @ 0 .00 m
40.0
35.0
30.0
25.0
20.0
15.0
10.0
.200
60
40
80
5.00
20
40
20
40
00
20
80
00
60
80
. 0
00
60
80
00
60
80
40
60
20
40
00
1.
1.
2.
2.
3.
3.
3.
4.
4.
4.
1.
1.
1.
2.
2.
2.
3.
3.
4.
4.
5.
-5.00
.
-10.0
-15.0
13.7 -20.0
13.7 17.3 13.7 -25.0
-30.0
-35.0
I = 10.0E-3 m^4 E = 206E6 kPa
.200
2.00
2.20
2.40
2.60
4.00
4.20
4.40
4.60
1.00
1.20
1.40
1.60
1.80
2.80
3.00
3.20
3.40
3.60
3.80
.800
4.80
5.00
-.005
.400
.600
.800
.200
.400
1.40
2.40
3.40
3.60
4.60
-.010
1.60
2.60
4.80
1.00
1.20
1.80
2.00
2.20
2.80
3.00
3.20
3.80
4.00
4.20
4.40
5.00
5.00
-.015
10 .0
-.020
15 .0
-.025
-.030 20 .0
-.035 25 .0
-.040
30 .0
-.045
35 .0
-.050
-.055 40 .0
-.060 45 .0
Mmax= 50.5KNm
50 .0
Vmax =38.1KN
c) Reinforcement design
- Effective depth of tread: h – 2.5cm = 28.9-2.5 = 26.4cm
- Parameters corresponding on slab :
-
M max 50.5 x1000000
k 2 2 0.0289 0.05
b.d 1000x(264) x25
Fcu
Z {0.5 (0.25 k / o.9)^1/ 2}d 0.95d
2
Asmin=0.13xbxh/100=0.13x1000x264=375.7mm /m
2
We take 5Ф12/m and As provided is 565.2mm with spacing 150mm in principle direction and
2
We take 5Ø10/m and As provided is 392.5mm spacing 150mm in second direction.