BPM 305 (TMA01) – PROJECT SCHEDULING AND CONTROL (MOHAMED ALI B1210887)

Net Rent
Net Rentab
able
le Area
Area cons
constititu
tute
te th
the
e to
tota
tall sum
sum of all
all ren
renta
tabl
ble
e are
areas
as insi
inside
de a
commerc
com mercial
ially
ly protot
prototype
ype buildi
building.
ng. It is calcula
calculated
ted fro
from
m the intinteri
erior
or surf
surface
ace of 
external walls and windows at a height more than 1.5 metre from floor level as
well as those areas taken up or filled up by the structural columns. Elements
such as staircase, toilets, lift shafts, escalators, ramps, lift lobbies, lift motor and
pumps rooms, car parks, access ways are omitted. The GFA can be calculate calculated
d
as follows in Scenario 4 below:

Scenario 4: Proposed office block

Required NRA = 15000m 2


Efficiency = NRA/GFA = 75%
GFA = 15000m2/0.75 = 20000m2

Rates employed or utilized in the calculations can be retrieved from internal office
records or archives. Conscientiously and discreetly adopt or pick rates from
published cost guides affiliated or corresponding to similar prototype of building
and of similar nature. However, each element should be measured according
th
thei
eirr corre
corresp
spon
ondi
ding
ng fu
func
ncti
tion
onss an
andd respe
respect
ctiv
ive
e rate
rates
s wo
woul
uld
d then
then ne
need
ed to be
applied.

The extracted or adopted estimated rate form the basis for the rate of the cost of 
a general or common building or structure within the confined function or quality
boundar
bou ndaryy and purpurvie
view
w and not thothose
se comple
complexes
xes and ela
elabor
borate
atedd desi
designed
gned
buildi
building
ng or str
struct
ucture.
ure. The costing
costing for externa
externall works,
works, precinc
precinctt works,
works, and
excepti
exce ptiona
onall compone
componentsnts in the substr
substruct
ucture
ure wor
works
ks such
such as piling
piling wor
works
ks or 
peculiar foundation works in the prime costs, provisional costs and contingency
sums independently of tendered sums such as lump sums or reimbursable cost
contract or measured term contract and added as separate entity.

 An
the extract
varioushas been taken
available facts from BCISfor
and data in cost
the table belowproposals
planning for illustration to display
and purposes.
The location is UK based for the 4 th quarter of 2005.

Page 8 of 22