1-Apr-2010 Calculation sheet was revised and rearranged using deformed bar U32.
2 Design Parameters
737673708.xls
-2-
Summary
Coefficient of static earth pressure Ka= 0.5
737673708.xls
-3-
Summary
Design Note for DED Report Babakan River BB-2 Sub Project
Dimension of frame
t1 B t1
H0: Height of frame t2/2 + H + t3/2 1.200 m
D1 B0: Width of frame B + t1 1.200 m
D1: Covering depth at middle of top slab D + t2/2 5.100 m
t2
H H0
t3
B0
Page 4 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.L1: Pvt1 = 0.083 tf/m2, B= 1.200 m Combination for Case.L2 (2) (2) (3) (3)
Pvt2 = 0.083 tf/m2, B= 1.200 m a) + b) a) + c) a) + b) a) + c)
Case.L2: Pvt1 = 0.165 tf/m2, B= 1.200 m Distributed load total 0.165 0.103 0.165 0.083
Pvt2 = 0.000 tf/m2, B= 0.000 m Select the combination case of 0.165 tf/m2,
for Case.L2, which is the largest load to the top slab.
In case of covering depth (D) is over 3.0m, uniform load of 1.0 tf/m2 is applied on the top slab of culvert instead of live load calculated above.
Page 5 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
3 Load calculation
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*gc/B0 Wbot= 0.605
Wtop Wtop= 0.605
Ws=Wsw*2/B0 Ws= 0.800
Pvd Pvd= 8.595
Pvt1 Pvt1= 1.000
Pvt2 Pvt2= 0.000
Wiw=(hiw*B-2Hf^2)*gw/B0 Wiw= 0.000 hiw: internal water depth 0.000 m
Up=-gw*U/B0 Up= -1.633
Q= 9.972
Page 6 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*gc/B0 Wbot= 0.605
Wtop Wtop= 0.605
Ws=Wsw*2/B0 Ws= 0.800
Pvd Pvd= 8.595
Pvt1 Pvt1= 1.000
Pvt2 Pvt2= 0.000
Wiw=(hiw*B-2Hf^2)*gw/B0 Wiw= 0.000 hiw: internal water depth 0.000 m
Up=-gw*U/B0 Up= -1.633
Q= 9.972
Page 7 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*gc/B0 Wbot= 0.605
Wtop Wtop= 0.605
Ws=Wsw*2/B0 Ws= 0.800
Pvd Pvd= 8.595
Pvt1 Pvt1= 1.000
Pvt2 Pvt2= 0.000
Wiw=(hiw*B-2Hf^2)*gw/B0 Wiw= 0.796 hiw: internal water depth 1.000 m
Up=0 Up= 0.000
Q= 12.401
Page 8 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*gc/B0 Wbot= 0.605
Wtop Wtop= 0.605
Ws=Wsw*2/B0 Ws= 0.800
Pvd Pvd= 8.595
Pvt1 Pvt1= 1.000
Pvt2 Pvt2= 0.000
Wiw=(hiw*B-2Hf^2)*gw/B0 Wiw= 0.796 hiw: internal water depth 1.000 m
Up=0 Up= 0.000
Q= 12.401
Page 9 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Page 10 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
k1 = 1.000
k2 = H0t23/(B0t13) = 1.000
k3 = H0t33/(B0t13) = 1.000
qA = -qD qB = -qC R =0
qA = -0.268 qC = -0.258
qB = 0.258 qD = 0.268
MAB = k1(2qA +qB) - CAB = -1.052 tf・m
MBA = k1(2qB+qA)+CBA = 0.966 tf・m
MBC = k2(2qB+qC) - CBC = -0.966 tf・m
MCB = k2(2qC+qB)+CCB = 0.966 tf・m
MCD = k1(2qC+qD) - CCD = -0.966 tf・m
MDC =k1 (2qD+ qC)+CDC = 1.052 tf・m
MDA = k3(2qD+qA) - CDA = -1.052 tf・m
MAD = k3(2qA+qD)+CAD = 1.052 tf・m
Page 11 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MA = MAB = -1.052 tf・m
MB = -MBA = -0.966 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 4.044 -7.429 x + 1.012 x2 , x = 6.747
0.592
Bending moment at x 0.592 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 0.110 tf・m
Page 12 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MB = MBC = -0.966 tf・m
MC = -MCB = -0.966 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x 0.600 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.870 tf・m
c) Bending Moment
MC = MCD = -0.966 tf・m
MD = -MDC = -1.052 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 3.414 -5.000 x -1.012 x2 , x = -5.547
0.608
Bending moment at x 0.608 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.110 tf・m
Page 13 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MD = MDA = -1.052 tf・m
MA = -MAD = -1.052 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 6.600 -11.000 x , x = 0.600
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
k1 = 1.000
k2 = H0t23/(B0t13) = 1.000
k3 = H0t33/(B0t13) = 1.000
qA = -qD qB = -qC R =0
qA = -0.268 qC = -0.258
qB = 0.258 qD = 0.268
MAB = k1(2qA +qB) - CAB = -1.052 tf・m
MBA = k1(2qB+qA)+CBA = 0.966 tf・m
MBC = k2(2qB+qC) - CBC = -0.966 tf・m
MCB = k2(2qC+qB)+CCB = 0.966 tf・m
MCD = k1(2qC+qD) - CCD = -0.966 tf・m
MDC =k1 (2qD+ qC)+CDC = 1.052 tf・m
MDA = k3(2qD+qA) - CDA = -1.052 tf・m
MAD = k3(2qA+qD)+CAD = 1.052 tf・m
Page 14 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MA = MAB = -1.052 tf・m
MB = -MBA = -0.966 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 4.044 -7.429 x + 1.012 x2 , x = 6.747
0.592
Bending moment at x 0.592 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 0.110 tf・m
Page 15 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MB = MBC = -0.966 tf・m
MC = -MCB = -0.966 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x 0.600 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.870 tf・m
c) Bending Moment
MC = MCD = -0.966 tf・m
MD = -MDC = -1.052 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 3.414 -5.000 x -1.012 x2 , x = -5.547
0.608
Bending moment at x 0.608 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.110 tf・m
Page 16 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MD = MDA = -1.052 tf・m
MA = -MAD = -1.052 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 6.600 -11.000 x , x = 0.600
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
k1 = 1.000
k2 = H0t23/(B0t13) = 1.000
k3 = H0t33/(B0t13) = 1.000
Page 17 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
qA = -qD qB = -qC R =0
qA = -0.354 qC = -0.330
qB = 0.330 qD = 0.354
MAB = k1(2qA +qB) - CAB = -0.966 tf・m
MBA = k1(2qB+qA)+CBA = 0.894 tf・m
MBC = k2(2qB+qC) - CBC = -0.894 tf・m
MCB = k2(2qC+qB)+CCB = 0.894 tf・m
MCD = k1(2qC+qD) - CCD = -0.894 tf・m
MDC =k1 (2qD+ qC)+CDC = 0.966 tf・m
MDA = k3(2qD+qA) - CDA = -0.966 tf・m
MAD = k3(2qA+qD)+CAD = 0.966 tf・m
Page 18 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MA = MAB = -0.966 tf・m
MB = -MBA = -0.894 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 3.003 -4.915 x + 0.013 x2 , x = 375.045
0.612
Bending moment at x 0.612 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -0.048 tf・m
c) Bending Moment
MB = MBC = -0.894 tf・m
MC = -MCB = -0.894 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x 0.600 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.942 tf・m
Page 19 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MC = MCD = -0.894 tf・m
MD = -MDC = -0.966 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 2.876 -4.883 x -0.013 x2 , x = -373.845
0.588
Bending moment at x 0.588 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -0.048 tf・m
c) Bending Moment
MD = MDA = -0.966 tf・m
MA = -MAD = -0.966 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 6.600 -11.000 x , x = 0.600
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
Page 20 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
k1 = 1.000
k2 = H0t23/(B0t13) = 1.000
k3 = H0t33/(B0t13) = 1.000
qA = -qD qB = -qC R =0
qA = -0.354 qC = -0.330
qB = 0.330 qD = 0.354
Page 21 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Page 22 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MA = MAB = -0.966 tf・m
MB = -MBA = -0.894 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 3.003 -4.915 x + 0.013 x2 , x = 375.045
0.612
Bending moment at x 0.612 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -0.048 tf・m
c) Bending Moment
MB = MBC = -0.894 tf・m
MC = -MCB = -0.894 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x 0.600 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.942 tf・m
Page 23 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Sx2 = -1.530 tf
Page 24 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
c) Bending Moment
MC = MCD = -0.894 tf・m
MD = -MDC = -0.966 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 2.876 -4.883 x -0.013 x2 , x = -373.845
0.588
Bending moment at x 0.588 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -0.048 tf・m
c) Bending Moment
MD = MDA = -0.966 tf・m
MA = -MAD = -0.966 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 6.600 -11.000 x , x = 0.600
Page 25 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Check M N S (tf)
Member Case
Point (tf・m) (tf) at joint at 2d
Side wall A -1.052 6.600 4.044 1.906
(left) Case.1 Middle 0.110 6.363 0.000 -
B -0.966 6.120 -3.414 -1.823
A -1.052 6.600 4.044 1.906
Case.2 Middle 0.110 6.363 0.000 -
B -0.966 6.120 -3.414 -1.823
A -0.966 6.600 3.003 1.530
Case.3 Middle -0.048 6.355 0.000 -
B -0.894 6.120 -2.876 -1.410
A -0.966 6.600 3.003 1.530
Case.4 Middle -0.048 6.355 0.000 -
B -0.894 6.120 -2.876 -1.410
Top slab B -0.966 3.414 6.120 3.060
Case.1 Middle 0.870 3.414 0.000 -
C -0.966 3.414 -6.120 -3.060
B -0.966 3.414 6.120 3.060
Case.2 Middle 0.870 3.414 0.000 -
C -0.966 3.414 -6.120 -3.060
B -0.894 2.876 6.120 3.060
Case.3 Middle 0.942 2.876 0.000 -
C -0.894 2.876 -6.120 -3.060
B -0.894 2.876 6.120 3.060
Case.4 Middle 0.942 2.876 0.000 -
C -0.894 2.876 -6.120 -3.060
Side wall C -0.966 6.120 3.414 1.823
(right) Case.1 Middle 0.110 6.363 0.000 -
D -1.052 6.600 -4.044 -1.906
C -0.966 6.120 3.414 1.823
Case.2 Middle 0.110 6.363 0.000 -
D -1.052 6.600 -4.044 -1.906
C -0.894 6.120 2.876 1.410
Case.3 Middle -0.048 6.355 0.000 -
D -0.966 6.600 -3.003 -1.530
C -0.894 6.120 2.876 1.410
Case.4 Middle -0.048 6.355 0.000 -
D -0.966 6.600 -3.003 -1.530
Invert D -1.052 4.044 6.600 3.300
Case.1 Middle 0.928 4.044 0.000 -
A -1.052 4.044 -6.600 -3.300
D -1.052 4.044 6.600 3.300
Case.2 Middle 0.928 4.044 0.000 -
A -1.052 4.044 -6.600 -3.300
D -0.966 3.003 6.600 3.300
Case.3 Middle 1.014 3.003 0.000 -
A -0.966 3.003 -6.600 -3.300
D -0.966 3.003 6.600 3.300
Case.4 Middle 1.014 3.003 0.000 -
A -0.966 3.003 -6.600 -3.300
Page 26 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.2
M= -1.052 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.600 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= 4.044 tf n= 24 d' = 5 cm (protective covering depth)
S2d= 1.906 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 15.94 cm
Solving the formula shown below, sc = 36.578 kgf/cm2 ( 0.00031 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +69.07 sc^2 -2150 sc -62709
s = nsc/(nsc+ssa) = 0.385
Asreq = (sc*s/2 - N/(bd))bd/ssa = 2.838 cm2
Case.3
M= -0.966 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.600 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= 3.003 tf n= 24 d' = 5 cm (protective covering depth)
S2d= 1.530 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 14.64 cm
Solving the formula shown below, sc = 35.071 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +70.22 sc^2 -2016.1 sc -58802
s = nsc/(nsc+ssa) = 0.375
Asreq = (sc*s/2 - N/(bd))bd/ssa = 2.340 cm2
Case.4
M= -0.966 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.600 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= 3.003 tf n= 24 d' = 5 cm (protective covering depth)
S2d= 1.530 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 14.64 cm
Solving the formula shown below, sc = 35.071 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +70.22 sc^2 -2016.1 sc -58802
s = nsc/(nsc+ssa) = 0.375
Asreq = (sc*s/2 - N/(bd))bd/ssa = 2.340 cm2
The maximum requirement of reinforcement bar is 2.838 cm2 in Case1 from above calculation.
Case. 1 2 3 4
Requirement 2.838 2.838 2.340 2.340 (cm2)
Page 27 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.2
M= -0.966 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.120 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
Page 28 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.3
M= -0.894 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.120 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= -2.876 tf n= 24 d' = 5 cm (protective covering depth)
S2d= -1.410 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 14.61 cm
Solving the formula shown below, sc = 33.361 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +71.5 sc^2 -1866.4 sc -54438
s = nsc/(nsc+ssa) = 0.364
Asreq = (sc*s/2 - N/(bd))bd/ssa = 2.131 cm2
Case.4
M= -0.894 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.120 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= -2.876 tf n= 24 d' = 5 cm (protective covering depth)
S2d= -1.410 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 14.61 cm
Solving the formula shown below, sc = 33.361 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +71.5 sc^2 -1866.4 sc -54438
s = nsc/(nsc+ssa) = 0.364
Asreq = (sc*s/2 - N/(bd))bd/ssa = 2.131 cm2
The maximum requirement of reinforcement bar is 2.542 cm2 in Case1 from above calculation.
Case. 1 2 3 4
Requirement 2.542 2.542 2.131 2.131 (cm2)
Case.2
M= -0.966 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 3.414 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= 6.120 tf n= 24 d' = 5 cm (protective covering depth)
S2d= 3.060 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 28.29 cm
Solving the formula shown below, sc = 32.211 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +72.35 sc^2 -1767.5 sc -51553
s = nsc/(nsc+ssa) = 0.356
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.700 cm2
Case.3
M= -0.894 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 2.876 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= 6.120 tf n= 24 d' = 5 cm (protective covering depth)
S2d= 3.060 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 31.08 cm
Page 29 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Page 30 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.4
M= -0.894 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 2.876 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= 6.120 tf n= 24 d' = 5 cm (protective covering depth)
S2d= 3.060 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 31.08 cm
Solving the formula shown below, sc = 30.397 kgf/cm2 ( 2E-05 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +73.66 sc^2 -1614.1 sc -47079
s = nsc/(nsc+ssa) = 0.343
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.524 cm2
The maximum requirement of reinforcement bar is 3.700 cm2 in Case1 from above calculation.
Case. 1 2 3 4
Requirement 3.700 3.700 3.524 3.524 (cm2)
Case.2
M= -1.052 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 4.044 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= -6.600 tf n= 24 d' = 5 cm (protective covering depth)
S2d= -3.300 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 26.02 cm
Solving the formula shown below, sc = 34.333 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +70.78 sc^2 -1951.2 sc -56911
s = nsc/(nsc+ssa) = 0.371
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.926 cm2
Case.3
M= -0.966 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 3.003 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= -6.600 tf n= 24 d' = 5 cm (protective covering depth)
S2d= -3.300 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 32.17 cm
Solving the formula shown below, sc = 31.844 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +72.62 sc^2 -1736.3 sc -50642
s = nsc/(nsc+ssa) = 0.353
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.879 cm2
Case.4
M= -0.966 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 3.003 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
S0= -6.600 tf n= 24 d' = 5 cm (protective covering depth)
S2d= -3.300 tf c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 32.17 cm
Solving the formula shown below, sc = 31.844 kgf/cm2 ( 3E-06 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +72.62 sc^2 -1736.3 sc -50642
s = nsc/(nsc+ssa) = 0.353
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.879 cm2
The maximum requirement of reinforcement bar is 3.926 cm2 in Case1 from above calculation.
Case. 1 2 3 4
Page 31 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Page 32 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.2
M= 0.110 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.363 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 1.73 cm
Solving the formula shown below, sc = 17.713 kgf/cm2 ( 0.0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +81.79 sc^2 -665.95 sc -19424
s = nsc/(nsc+ssa) = 0.233
Asreq = (sc*s/2 - N/(bd))bd/ssa = 0.000 cm2 Tensile is on inside of member
Case.3
M= -0.048 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.355 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 0.75 cm
Solving the formula shown below, sc = 16.151 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +82.63 sc^2 -568.58 sc -16583
s = nsc/(nsc+ssa) = 0.217
Asreq = (sc*s/2 - N/(bd))bd/ssa = 0.000 cm2 Tensile is on outside of member
Case.4
M= -0.048 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 6.355 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 0.75 cm
Solving the formula shown below, sc = 16.151 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +82.63 sc^2 -568.58 sc -16583
s = nsc/(nsc+ssa) = 0.217
Asreq = (sc*s/2 - N/(bd))bd/ssa = 0.000 cm2 Tensile is on outside of member
The maximum requirement of reinforcement bar is 0.000 cm2 in Case- from above calculation.
Case. 1 2 3 4
Requirement 0.000 0.000 0.000 0.000 (cm2)
Side inside inside outside outside
Case.2
M= 0.870 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 3.414 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
Page 33 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Page 34 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
e = |M/N| = 25.50 cm
Solving the formula shown below, sc = 30.460 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +73.62 sc^2 -1619.5 sc -47235
s = nsc/(nsc+ssa) = 0.343
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.159 cm2 Tensile is on inside of member
Case.3
M= 0.942 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 2.876 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 32.76 cm
Solving the formula shown below, sc = 31.290 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +73.02 sc^2 -1689.3 sc -49270
s = nsc/(nsc+ssa) = 0.349
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.798 cm2 Tensile is on inside of member
Case.4
M= 0.942 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 2.876 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 32.76 cm
Solving the formula shown below, sc = 31.290 kgf/cm2 ( 7E-06 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +73.02 sc^2 -1689.3 sc -49270
s = nsc/(nsc+ssa) = 0.349
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.798 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 3.798 cm2 in Case3 from above calculation.
Case. 1 2 3 4
Requirement 3.159 3.159 3.798 3.798 (cm2)
Side inside inside inside inside
7) At Middle of invert
Case.1
M= 0.928 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 4.044 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 22.94 cm
Solving the formula shown below, sc = 32.098 kgf/cm2 ( 0 kgf/cm2) o.k. h d
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0 d
0 = sc^3 +72.43 sc^2 -1757.8 sc -51270 1
s = nsc/(nsc+ssa) = 0.355
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.215 cm2 Tensile is on inside of member
Case.2
M= 0.928 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 4.044 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 22.94 cm
Solving the formula shown below, sc = 32.098 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +72.43 sc^2 -1757.8 sc -51270
s = nsc/(nsc+ssa) = 0.355
Asreq = (sc*s/2 - N/(bd))bd/ssa = 3.215 cm2 Tensile is on inside of member
Case.3
M= 1.014 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 3.003 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 33.77 cm
Solving the formula shown below, sc = 32.716 kgf/cm2 ( 9E-07 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +71.98 sc^2 -1810.8 sc -52815
Page 35 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
s = nsc/(nsc+ssa) = 0.359
Asreq = (sc*s/2 - N/(bd))bd/ssa = 4.153 cm2 Tensile is on inside of member
Page 36 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Case.4
M= 1.014 tf・m sca = 60 kgf/m2 h= 20 cm (height of member)
N= 3.003 tf ssa = 1400 kgf/m2 d= 15 cm (effective height of member)
n= 24 d' = 5 cm (protective covering depth)
c= 5.00 cm (distance from neutral axis)
b= 100 cm
e = |M/N| = 33.77 cm
Solving the formula shown below, sc = 32.716 kgf/cm2 ( 0 kgf/cm2) o.k.
sc^3+{3ssa/(2n) - 3N(e+c)/(bd^2)}sc^2 - 6N(e+c)ssasc/(nbd^2) - 3N(e+c)ssa^2/(n^2bd^2) = 0
0 = sc^3 +71.98 sc^2 -1810.8 sc -52815
s = nsc/(nsc+ssa) = 0.359
Asreq = (sc*s/2 - N/(bd))bd/ssa = 4.153 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 4.153 cm2 in Case3 from above calculation.
Case. 1 2 3 4
Requirement 3.215 3.215 4.153 4.153 (cm2)
Side inside inside inside inside
Required reinforcement for design is the maximum required reinforcement calculated above in 1) - 7).
Item Side wall Side wall Top slab Invert Side wall Top slab Invert
Point bottom top end end middle middle middle
Side outside outside outside outside inside inside inside
Calculation 1) 2) 3) 4) 5) 6) 7)
Requirement 2.838 2.542 3.700 3.926 0.000 3.798 4.153 (cm2)
Page 37 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Required R-bar Asreq cm2 2.84 0.00 2.54 3.70 3.80 3.93 4.15
Section area of R-bar As cm2 5.07 5.07 5.07 5.07 5.07 5.07 5.07
Perimeter of R-bar U cm 16 16 16 16 16 16 16
M/N e cm 15.94 0.75 15.78 28.29 32.76 26.02 33.77
Dist. from neutral axis c cm 5.00 5.00 5.00 5.00 5.00 5.00 5.00
a' 17.8 -27.7 17.3 54.9 68.3 48.1 71.3
b' 152.9 42.0 151.7 243.0 275.7 226.5 283.0
c' -2293 -630 -2275 -3645 -4135 -3397 -4245
x 7.01 27.05 7.04 6.00 5.84 6.10 5.81
0.000 0.000 0.000 0.000 0.000 0.000 0.000
(check) ok ok ok ok ok ok ok
Compressive stress sc kgf/cm2 31.1 4.5 28.6 29.2 28.5 31.7 30.7
Allowable stress sca kgf/cm2 60.0 60.0 60.0 60.0 60.0 60.0 60.0
ok ok ok ok ok ok ok
Tensile stress ss kgf/cm2 851.2 0.0 775.0 1050.5 1073.5 1110.4 1165.3
Allowable stress ssa kgf/cm2 1400.0 1400.0 1400.0 1400.0 1400.0 1400.0 1400.0
ok ok ok ok ok ok ok
Shearing stress at joint t kgf/cm2 2.70 0.00 2.28 4.08 0.00 4.40 0.00
Allowable stress ta kgf/cm2 13.00 13.00 13.00 13.00 13.00 13.00 13.00
ok ok ok ok ok ok ok
Shearing stress at 2d t2d kgf/cm2 1.27 - 1.22 2.04 - 2.20 -
Allowable stress t2da kgf/cm2 6.50 - 6.50 6.50 - 6.50 -
ok ok ok ok
Resisting Moment Mr kgfcm 198,559 198,459 198,369 191,139 180,803 197,825 183,209
Mr for compression Mrc kgfcm 198,559 198,459 198,369 197,750 197,721 197,825 197,725
x for Mrc cm 5.926 5.886 5.848 5.429 5.349 5.523 5.368
ss for Mrc kgf/cm2 2204.8 2229.5 2253.4 2538.9 2597.9 2470.7 2584.0
Mr for tensile Mrs kgfcm 259,480 253,756 248,336 191,139 180,803 203,664 183,209
x for Mrs cm 8.393 8.318 8.245 7.353 7.162 7.570 7.207
sc for Mrs kgf/cm2 74.1 72.6 71.2 56.1 53.3 59.4 54.0
Distribution bar (>As/6 and >Asmin) D13@250 D13@250 D13@250 D13@250 D13@250 D13@250 D13@250
Section area of R-bar As cm2 5.07 5.07 5.07 5.07 5.07 5.07 5.07
ok ok ok ok ok ok ok
Reinforcement bar for fillet Err:504 Err:504
Section area of R-bar As cm2 Err:504 Err:504
Page 38 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
h1
h2
Ha
h3
b1 b2 b1
Bb
Section of Culvert
1. Design Data
b1 = 0.200 m b2 = 1.000 m
h1 = 0.200 m h2 = 1.000 m h3 = 0.200 m d = 0.05 m
Bb = 1.400 m Ha = 1.400 m Fillet = 0.15 m
2. Data Pembesian
Bottom slab : Tumpuan Lapangan Tulangan bagi :
As1 (cm2) : D 13 @ 250 D 13 @ 250 D 13 @ 250
As2 (cm2) : D 13 @ 250 D 13 @ 250
Page 39 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
h1
h2
Ha
h3
b1 b2 b1
Bb
Section of Culvert
1. Design Data
b1 = 0.200 m b2 = 1.000 m
h1 = 0.200 m h2 = 1.000 m h3 = 0.200 m
Bb = 1.200 m Ha = 1.200 m
2. Result Calculation
Side wall (left) Ma Mmax Mb Sa Sb Na Nb MAB MBA
Case 1 -1.052 0.110 -0.966 4.044 -3.414 6.600 6.120 -1.052 0.966
Case 2 -0.966 -0.048 -0.894 3.003 -2.876 6.600 6.120 -0.966 0.894
Case 1
Mmax x x1 x2 x3 x4 x5 x6 x7 q1 q2
Mab = 0.592 -0.53 -0.16 0.05 0.11 0.03 -0.18 -0.51 7.429 5.000
Mcd = 0.608 -0.53 -0.16 0.05 0.11 0.03 -0.18 -0.51 5.000 7.429
Mmax y1 y2 y3 y4 y5 y6 y7 q1
Mbc = 0.6 -0.16 0.41 0.76 0.87 0.76 0.41 -0.16 10.20
Mad = 0.6 -0.19 0.43 0.80 0.93 0.80 0.43 -0.19 11.00
x x1 x2 x3 x4 x5 x6 x7
Sab 1.200 2.95 1.91 0.91 -0.05 -0.96 -1.82 -2.64
Case 2
Mmax x x1 x2 x3 x4 x5 x6 x7 q1 q2
Mab = 0.6 -0.53 -0.16 0.05 0.11 0.03 -0.18 -0.51 4.915 4.883
Mcd = 0.6 -0.53 -0.16 0.05 0.11 0.03 -0.18 -0.51 4.883 4.915
Mmax y1 y2 y3 y4 y5 y6 y7 q1
Mbc = 0.6 -0.09 0.48 0.83 0.94 0.83 0.48 -0.09 10.20
Mad = 0.6 -0.10 0.52 0.89 1.01 0.89 0.52 -0.10 11.00
Page 40 of 41
Design Note for DED Report Babakan River BB-2 Sub Project
Page 41 of 41