7(i) Providing push on joint to centrifugally (spun) cast 18.00 each 96.15
iron pipes or ductile iron pipes i/c testing of joints
and i/c the cost of rubber gasket (i)100 mm dia.
8(i) Labour for cutting C.I. pipe with steel saw 100 mm 35.00 each cut 160.70
dia.
11(i) Providing and laying cast iron detachable joints 40.00 each 865.30
to asbestos cement pressure pipes and plain
ended Class 15 C.I specials with collars rubber
rings,flanges, bolts and nuts etc. complete,
including testing of joints. 100 mm diameter
14 Brick work with common burnt clay FPS (non 2.50 cum 6658.25
modular) bricks of class designation 7.5 in
foundation and plainth in cement mortar 1:6(1C:6
Coarse sand)
15 12 mm cement plaster of mix 1:6(1 cement: 10.00 Sqm 282.00
6 fine sand)
19 P/F G.I union in G.I pipe including cutting and 40.00 each 262.30
threading the pipe and making long screws etc.
complete (new work) 15 mm dia. nominal bore
Say Rs.
EE(M)-13 D/M(M)-3
of water leakages
(M)-3.
AMOUNT
12372.00
56901.29
5479.43
4246.13
22528.80
110988.90
52842.90
21735.45
13992.28
17477.08
1730.70
936.30
459.00
840.45
1072.80
5624.50
7547.50
6039.75
2504.25
3008.00
90068.48
112119.23
34612.00
21571.00
17620.00
13917.90
16747.20
46827.50
16391.60
17941.35
23219.00
16748.50
23162.70
16645.63
2820.00
678.00
10877.49
71492.00
10492.00
1340.00
37100.70
208802.00
3607.20
5677.44
19547.14
16686.57
1205040.14
1205040.00
/M(M)-3