You are on page 1of 4

QF-SPM-14

POWER GRID COMPANY OF BANGLADESH LTD.


Differential Relay Test Report

Name of The Substation : TONGI CTR 1 : 800/1


Name of The Feeder : Uttara 3rd Phase CTR-2 :
Relay Type : RED670 Matching CTR-1 : Not Required
Relay Serial No : T1803140 Matching CTR-2 : Not Required
Duty : 87T Testing Date : 19.09.2021
Manufacturer : ABB :

Id> 0.3IB
Id>>
Relay Setting Slope-1

Slope-2

Sensitivity Test:
Current Pickup Breaker Signal
Phase Remarks
Injected Current Tripping Relay Panel Control Panel
Side 1 0.599A 0.599A OK 87T Operated
R Element
Side 2 - - OK 87T Operated
Side 1 0.599A 0.599A OK 87T Operated
Y Element
Side 2 - - OK 87T Operated
Side 1 0.599A 0.599A OK 87T Operated
B Element
Side 2 - - OK 87T Operated

Slope Test:
High
Current Slope Actual
Phase I Diff I Rest % Error Set Remarks
Injected Given Slope
Test
Side 1
R Element
Side 2
Side 1
Y Element
Side 2
Side 1
B Element
Side 2
Add additional table if necessary

Tested By Checked By

Sub Divisional Engineer Executive Engineer


SPMD, Dhaka-2, PGCB SPMD, Dhaka-2, PGCB
QF-SPM-02
POWER GRID COMPANY OF BANGLADESH LTD.
Distance Relay Test Report

Name Of The Substation: TONGI CTR: 800/1 A


Name Of The Line Feeder: Uttara 3P PTR: 132/0.110 kV
Relay Type: RED670 Date 19.09.2021
Relay Serial No: T1803140 Manufacturer: ABB
Testing Instrument: CMC 356
Testing Type: Annual Maintenance

Reverse Starter Resitive


Z1 Z1E Z2 Z2E Z3 Z3E
Zone Zone Reach
Impedance 2.57 Ω 2.57 Ω 3.83 Ω 3.83 Ω 5.75 Ω 5.75 Ω 0.00 Ω - -
Relay Setting
Time 0 ms 0 ms 400 ms 400 ms 800 ms 800 ms 800 ms - -

Test Result: Machine Generated Results Can be added.

Phase L1-E:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 38 ms 27% Passed

2 3.51 Ω 75° Z2 430 ms 429 ms 0% Passed

3 5.27 Ω 75° Z3 830 ms 829 ms 0% Passed

4 0.00 Ω -105° Reverse 830 ms 828 ms 0% Passed

5 7.19 Ω 75° Out - no trip - Passed

Phase L2-E:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 27 ms -10% Passed

2 3.51 Ω 75° Z2 430 ms 440 ms 2% Passed

3 5.27 Ω 75° Z3 830 ms 832 ms 0% Passed

4 0.00 Ω -105° Reverse 830 ms 836 ms 1% Passed

5 7.19 Ω 75° Out - no trip - Passed

Phase L3-E:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 35 ms 17% Passed

2 3.51 Ω 75° Z2 430 ms 435 ms 1% Passed

3 5.27 Ω 75° Z3 830 ms 835 ms 1% Passed

4 0.00 Ω -105° Reverse 830 ms 825 ms -1% Passed

5 7.19 Ω 75° Out - no trip - Passed


QF-SPM-02

Phase L1-L2:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 26 ms -13% Passed

2 3.51 Ω 75° Z2 430 ms 428 ms 0% Passed

3 5.27 Ω 75° Z3 830 ms 839 ms 1% Passed

4 0.00 Ω -105° Reverse 830 ms 831 ms 0% Passed

5 7.19 Ω 75° Out - no trip - Passed

Phase L2-L3:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 31 ms 3% Passed

2 3.51 Ω 75° Z2 430 ms 426 ms -1% Passed

3 5.27 Ω 75° Z3 830 ms 832 ms 0% Passed

4 0.00 Ω -105° Reverse 830 ms 838 ms 1% Passed

5 7.19 Ω 75° Out - no trip - Passed

Phase L3-L1:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 37 ms 23% Passed

2 3.51 Ω 75° Z2 430 ms 428 ms 0% Passed

3 5.27 Ω 75° Z3 830 ms 834 ms 0% Passed

4 0.00 Ω -105° Reverse 830 ms 835 ms 1% Passed

5 7.19 Ω 75° Out - no trip - Passed

Phase L1-L2-L3:

Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed

1 1.93 Ω 75° Z1 30 ms 36 ms 20% Passed

2 3.51 Ω 75° Z2 430 ms 430 ms 0% Passed

3 5.27 Ω 75° Z3 830 ms 829 ms 0% Passed

4 0.00 Ω -105° Reverse 830 ms 829 ms 0% Passed

5 7.19 Ω 75° Out - no trip - Passed

Tested By Checked By

Sub Divisional Engineer Executive Engineer


SPMD, Dhaka - 2, PGCB SPMD, Dhaka - 2, PGCB
QF-SPM-03

POWER GRID COMPANY OF BANGLADESH LTD.


Over Current Relay Test Report

Name Of The Substation: TONGI CTR: 800/1


Name Of The Feeder: Uttara 3rd Phase Date: 19.09.2021
Relay Type: MCGG52 Manufacturer: GEC
Relay Amps: 1A Relay Serial No: 598430C

Actual Dir
Characterstic Polarizing Pick up Drop off Current Calculated
Phase Duty Is (A) T.M.S RCA Time % Error Signal Operating Remarks
Curve Phase (A) (A) Injected Time (sec)
(sec) Area
3.00 3.009 2.971 -1.27
R
51 1.5 0.30 IEC SI - - 1.57 1.51 4.50 1.891 1.881 -0.51 Okay -
Element
7.50 1.284 1.281 -0.23

Y
51
Element

3.00 3.009 2.971 -1.27


B
51 1.5 0.30 IEC SI - - 1.55 1.5 4.50 1.891 1.881 -0.51 Okay -
Element
7.50 1.284 1.281 -0.23
0.60 4.012 3.937 -1.90
N
51N 0.3 0.40 IEC SI - - 0.35 0.3 0.90 2.521 2.494 -1.07 Okay -
Element
1.50 1.712 1.700 -0.70

Tested By Checked By

Sub Divisional Engineer Executive Engineer


SPMD, Dhaka - 2, PGCB SPMD, Dhaka - 2, PGCB

You might also like