Phase L1-E:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Phase L2-E:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Phase L3-E:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Phase L1-L2:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Phase L2-L3:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Phase L3-L1:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Phase L1-L2-L3:
Sl No. Testing Imp (Z) Angle Zone T Nominal T Actual % DEV Passed / Failed
Tested By Checked By
Actual Dir
Characterstic Polarizing Pick up Drop off Current Calculated
Phase Duty Is (A) T.M.S RCA Time % Error Signal Operating Remarks
Curve Phase (A) (A) Injected Time (sec)
(sec) Area
12.00 4.012 4.056 1.09
R
51 6.00 0.40 IEC SI - - 15.00 3.028 3.082 1.76 Okay -
Element
18.00 2.521 2.553 1.26
12.00 4.012 4.056 1.09
Y
51 6.00 0.40 IEC SI - - 15.00 3.028 3.082 1.76 Okay -
Element
18.00 2.521 2.553 1.26
12.00 4.012 4.056 1.09
B
51 6.00 0.40 IEC SI - - 15.00 3.028 3.082 1.76 Okay -
Element
18.00 2.521 2.553 1.26
2.00 6.519 6.590 1.08
N
51N 1.00 0.65 IEC SI - - 3.00 4.096 4.150 1.30 Okay -
Element
5.00 2.782 2.818 1.28
Tested By Checked By
Actual Dir
Characterstic Polarizing Pick up Drop off Current Calculated
Phase Duty Is (A) T.M.S RCA Time % Error Signal Operating Remarks
Curve Phase (A) (A) Injected Time (sec)
(sec) Area
12.00 3.510 3.604 2.60
R -145°
67 6.00 0.35 IEC SI YB 15.00 2.649 2.755 3.83 Okay
Element ~+25°
18.00 2.206 2.310 4.52
12.00 3.510 3.604 2.60
Y -145°
67 6.00 0.35 IEC SI BR 15.00 2.649 2.755 3.83 Okay
Element ~+25°
18.00 2.206 2.310 4.52
12.00 3.510 3.604 2.60
B -145°
67 6.00 0.35 IEC SI RY 15.00 2.649 2.755 3.83 Okay
Element ~+25°
18.00 2.206 2.310 4.52
2.00 6.017 6.030 0.21
N -145°
67N 1.00 0.60 IEC SI -3V0 3.00 3.781 3.794 0.34 Okay
Element ~+25°
5.00 2.568 2.610 1.62
Tested By Checked By