The document outlines a full body harness control program for the construction team working on boilers 1, 2, and the electrostatic precipitator from November to December. A total of 72 harnesses were distributed with some being rejected, broken, or returned by workers. The document was prepared by the environmental, health, and safety team.
The document outlines a full body harness control program for the construction team working on boilers 1, 2, and the electrostatic precipitator from November to December. A total of 72 harnesses were distributed with some being rejected, broken, or returned by workers. The document was prepared by the environmental, health, and safety team.
The document outlines a full body harness control program for the construction team working on boilers 1, 2, and the electrostatic precipitator from November to December. A total of 72 harnesses were distributed with some being rejected, broken, or returned by workers. The document was prepared by the environmental, health, and safety team.