EMRILL SERVICES LLC - HARD SERVICES (PPM)

Facility Management PPM Task Sheet


Task No: Reference: HVAC-AHUS-1M
Asset: Air Handling Units Created On: 20th
August 2007
Frequency: Monthly Technical Director
Health & Safety General Notices:
1. You must disconnect and lock out the electrical supply before commencing any Electrical work on this
asset, unless directed differently in the instructions below.
2. All tools should have proper insulation. You are to ensure that proper personal protective equipment is worn
at all times.
3. Post appropriate "Maintenance in Progress" sign in front of the asset.

Maintenance Instructions: Yes No Fault


1. Record all the parameters
a) Chilled water inlet temperature deg c

b) Chilled water outlet temperature deg c

c) Air flow before filter L/S

e) Air flow after filter L/S

2. Check the temperature of the motor by physically


3. Check for any abnormal sound (Motor & Blower)
4. Check physically blower bearing temperature.
5. Check motor bearing noise by physically.
6. Check for any water leakage in the system.
7. Check all the fasteners by physically
8. Inspect Heater temperature in winter if applicable
9. Inspect blower motor AMPS.

Note: If values recorded are harmful to life or equipment contact supervisor / follow the Emrill escalation procedure

Consumables & Spares Qty JR Details Status

Task Sheet No. EM/GEN/TS-001 (Rev 0) Dated 10th July 2008 1/2
EMRILL SERVICES LLC - HARD SERVICES (PPM)

PLANNED PREVENTIVE MAINTENANCE CHECKLIST

Asset No: PPM Schedule Date:

Criticality:

Date Started: Technician /s:


Time Started: 1.
Date Completed: 2.
Time Completed: 3.
Total Hrs/Min Taken: 4.

FAULT AND CORRECTIVE ACTION TAKEN (IF ANY) REMARKS

Technician/s Supervisor Site In Charge

Task Sheet No. EM/GEN/TS-001 (Rev 0) Dated 10th July 2008 2/2