BUILDING SURVEYING PROGRAM

DEPARTMENT OF BUILT ENVIRONMENT STUDIES AND


TECHNOLOGY
UNIVERSITI TEKNOLOGI MARA
PERAK BRANCH, PERAK

ASSIGNMENT 3- GROUPING ASSIGNMENT


BSR255 (March- August 2021)
(BUILDING SURVEYING PRACTICE II)
(Grouping assignment- Group of 4 members)

A remedial action is intended to correct something that is wrong or to improve a


bad situation: to take urgent/immediate remedial action. One of the importance of
estimated of repair costs is useful for a budget plan that needs to be prepared by
owner/maintenance management in the future.

TASKS:

You are required to prepare the estimated repairing cost for defects found in your
Assignment 2. Please select the defects and provide the repair cost for the elements
below:

a) Building services (sanitary/ water supply/ electrical/ mechanical/ etc.)


b) Building Fabrics and Components
c) External (compound area/ perimeter drain/ apron/ etc.)

Each group are required to find 10 (ten) defects. Please add the defects sheet for
the defect selected, defects description and remedies for each remedial defect
cost.

Kindly submit your report in Pdf Format on Week 15.


The total marks of this assignment are 30%.

Prepared by RP:
Sr Dr Suriani Ngah Abdul Wahab