02 SITE CONSTRUCTION
02300 EXCAVATION
02 SITE CONSTRUCTION
To Building Summary S.R 67,310.10
1 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
03 CONCRETE WORK
To Collection 117,348.20
2 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 2,512,861.90
3 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 11,508.40
4 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 33,271.00
COLLECTION
Page 1 117,348.20
Page 2 2,512,861.90
Page 3 11,508.40
Page 4 33,271.00
03 CONCRETE WORK
To Building Summary S.R. 2,674,989.50
5 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
04 MASONRY
04 MASONRY
To Building Summary S.R. 230,085.00
6 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
05 METALS
To Collection 64,250.00
7 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 73,000.00
COLLECTION
Page 1 64,250.00
Page 2 73,000.00
05 METALS
To T6 Building Summary S.R. 137,250.00
8 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 41,598.00
9 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
10 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 79,160.00
11 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 16,720.00
COLLECTION
Page 1 41,598.00
Page 2 79,160.00
Page 3 16,720.00
12 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 53,300.00
13 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 295,100.00
14 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 246,510.00
15 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 5,080.00
COLLECTION
Page 1 53,300.00
Page 2 295,100.00
Page 3 246,510.00
Page 4 5,080.00
16 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 327,684.00
17 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
18 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 375,998.00
19 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 35,460.00
COLLECTION
Page 1 327,684.00
Page 2 417,654.00
Page 3 375,998.00
Page 4 35,460.00
09 FINISHES
To Building Summary S.R. 1,156,796.00
20 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
10 SPECIALITIES
10 SPECIALITIES
To Building Summary S.R. 1,300.00
21 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
13 SPECIAL CONSTRUCTION
To Collection 50,020
22 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
A 80 dn 151 m 60 9,060
0
B 100 dn 60 m 80 4,800
0
C 125 dn 12 m 130 1,560
0
D 150 dn 58 m 170 9,860
0
Valves 0
0
E Gate valves, 150 dn 2 Nr 4200 8,400
0
F Drain valves, 75 dn 2 Nr 3000 6,000
0
G Drain valves, 110 dn 2 Nr 3400 6,800
0
H Test and drain valves, 150 dn 1 Nr 4200 4,200
0
I Check Valve, 150 dn 1 Nr 4200 4,200
0
J Zone Valve, 125 dn 1 Nr 3800 3,800
0
Fire Hose Connection 0
0
K Type FHCN 9 Nr 300 2,700
0
Fire Department Connections 0
0
L Siamese 150 dn 1 Nr 500 500
0
M Pressure gages 1 Item 300 300
0
Fire hose cabinet 0
0
N Type FHC-1 14 Nr 1600 22,400
0
Sprinklers 0
0
O PENDENT SP-2 10 Nr 36 360
To Collection 84,940
23 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 274,480
COLLECTION
Page 1 50,020
Page 2 84,940
Page 3 274,480
13 SPECIAL CONSTRUCTION
To Building Summary S.R. 409,440.00
24 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
14 CONVEYING SYSTEMS
Passenger lifts
14 CONVEYING SYSTEMS
To Building Summary S.R. 465,000.00
25 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
15 MECHANICAL
A 15 dn 750 m 12 9,000
0
B 20 dn 185 m 15 2,775
0
C 25 dn 270 m 20 5,400
0
D 32 dn 500 m 23 11,500
0
E 40 dn 20 m 26 520
0
F 50 dn 55 m 30 1,650
0
G 65 dn 110 m 35 3,850
0
H 80 dn 120 m 50 6,000
0
I 110 dn 35 m 75 2,625
0
Ball Valves 0
0
J 15 dn 1 Nr 150 150
0
K 25 dn 50 Nr 250 12,500
0
L 32 dn 59 Nr 300 17,700
0
Gate Valves 0
0
M 80 dn 3 Nr 1800 5,400
0
N 100 dn 3 Nr 2500 7,500
To Collection 86,570
26 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Drain Valves
A 25 dn 12 Nr 250 3,000
0
Domestic Hot Water Piping 0
0
CPVC Pipes and fittings 0
0
B 15 dn 425 m 15 6,375
0
C 20 dn 310 m 20 6,200
0
15420 - DRAINAGE AND VENT PIPING 0
0
Under ground. uPVC drain pipes 0
0
D 50 dn 16 m 30 480
0
E 82 dn 82 m 40 3,280
0
F 110 dn 158 m 50 7,900
0
G 125 dn 35 m 60 2,100
0
H 200 dn 23 m 80 1,840
0
Above ground uPVC drain pipes 0
0
I 50 dn 597 m 30 17,910
0
J 82 dn 164 m 40 6,560
0
K 110 dn 207 m 60 12,420
0
uPVC vent pipes 0
0
L 50 dn 38 m 30 1,140
0
M 65 dn 58 m 35 2,030
0
N 82 dn 13 m 40 520
To Collection 71,755
27 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
A 110 dn 14 m 50 700
0
uPVC Rain Water Pipe (Under Ground) 0
0
B 125 dn 18 m 70 1,260
0
C 160 dn 22 m 75 1,650
0
D 200 dn 30 m 80 2,400
0
uPVC Rain Water Pipe (Above Ground) 0
0
E 50 dn 62 m 30 1,860
0
F 82 dn 39 m 40 1,560
0
G 110 dn 96 m 50 4,800
0
15430 - PLUMBING SPECIALITIES 0
0
H Roof drains 0
0
I Type RD-1, 50 dn 21 Nr 200 4,200
0
J Type RD-1, 82 dn 8 Nr 220 1,760
0
K Type RD-1, 110 dn 5 Nr 230 1,150
0
Floor drains 0
0
L Type FD-1, 82 dn 131 Nr 320 41,920
0
Floor cleanouts 0
0
M Type FCO; 50 dn 2 Nr 300 600
0
N Type FCO; 80 dn 1 Nr 320 320
0
O Type FCO; 110 dn 9 Nr 330 2,970
0
P Type FCO; 125 dn 1 350 350
To Collection 67,500
28 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 161,310
29 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Bathtub
To Collection 155,600
30 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 28,500
COLLECTION
Page 1 86,570
Page 2 71,755
Page 3 67,500
Page 4 161,310
Page 5 155,600
Page 6 28,500
15 MECHANICAL
To Building Summary S.R. 571,235
31 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
16 ELECTRICAL WORK
To Collection 177580
32 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
A 100 mm dn 30 mt 12 360
0
B 50 mm dn 85 mt 8 680
0
C 38 mm dn 1300 mt 5 6500
0
D 25 mm dn 32 mt 4 128
0
Distribution and draw boxes 0
0
E T.V riser distribution draw box, surface
galvanized steel 8 Nr 400 3200
0
F T.V distribution box, recessed PVC 29 Nr 100 2900
0
16139 CABLE TRAYS 0
0
Cable trays: galvanized steel 0
0
G 150 mm wide 190 m 65 12350
0
H 300 mm wide 80 m 100 8000
0
I 600 mm wide 30 m 150 4500
0
J 900 mm wide 12 m 200 2400
0
Cable trays: galvanized steel with cover 0
0
H 300 mm wide 25 mt 150 3750
To Collection 44768
33 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 68215
34 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
35 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
16442 PANELBOARDS
Distribution panelboard
To Collection 121880
36 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 72820
COLLECTION
Page 1 177580
Page 2 44768
Page 3 68215
Page 4 27796
Page 5 121880
Page 6 72820
16 ELECTRICAL WORK
To Building Summary S.R. 513,059
37 of 39
SUMMARY
RESIDENTIAL BUILDINGS
AMOUNT
S.R.
2 SITE CONSTRUCTION 67,310.10
4 MASONRY 230,085.00
9 FINISHES 1,156,796.00
10 SPECIALITIES 1,300.00
15 MECHANICAL 571,235.00
16 ELECTRICAL 0.00
513,059.00
38 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
10 SPECIALITIES
39 of 39