Professional Documents
Culture Documents
Belur Estimation For GP
Belur Estimation For GP
Date :- 9/20/2022
5 Cum
1 7.31 0.23 0.125 0.21
1 9.45 0.23 0.125 0.27
0.48 5500 2650.18
6 Cum
G.F 15 0.23 0.30 5.8 6.003
F.F 15 0.23 0.30 3.25 3.36375
7 Cum
GF 4 7.31 0.23 0.3 2.02
3 9.45 0.23 0.3 1.96
3.97 3365.00 13371.53
8 Cum
G.F 3 9.45 0.23 3.25 21.19
5 7.31 0.23 3.25 27.32
10 Sqm
G.F 1 2.5 1.52 3.80
1 1.52 1.52 2.31
4 1.1 1.52 6.69
2 0.9 0.6 1.08
F.F 6 1.22 1.52 11.13
2 0.9 0.60 1.08
12 Cum
G.F 3 9.45 0.23 0.15 0.978075
5 7.31 0.23 0.15 1.260975
F.F 3 9.45 0.23 0.15 0.978075
5 7.31 0.23 0.15 1.260975
2 4 0.23 0.15 0.276
14
G.F 3 9.45 0.23 0.45 2.934225
5 7.31 0.23 0.45 3.782925
2 3.65 0.23 0.45 0.75555
F.F 3 9.45 0.23 0.45 2.934225
5 7.31 0.23 0.45 2.934225
2 3.65 0.23 0.45 0.75555
14.10 2565.00 36158.04
KSRB 4-6.2:Providing and removing SLAB
centering, shuttering,strutting,propping
etc.& removal of from work for flat surface
such as suspended
floors,roofs,landings,balconies and
likes,thickness upto 200mm including cost
of all materials,labor complete as per
specification Sp no KBS 4.6.2(SI no
4.29/17)
15 Sqm
GF 1 11 8.85 97.35
F.F 1 11 8.85 97.35
16 Cum
GF 1 11 8.85 97.35
F.F 1 11 8.85 97.35
17
Footing 440
Column 1450
lintel 860.00
beam 1153.00
slab 3010.00
20 Sqm
G.F 2 9.45 3 56.7
3 7.31 3 65.79
F.F 2 9.45 3 56.7
3 7.31 3 65.79
Parape 2 10.2 0.9 18.36
2 8.8 0.9 15.84
24 Doors Sqm
G.F 1 1.3 1.3 1.69
3 0.9 2.7 7.29
2 0.76 1.52 2.31
F.F 2 0.9 1.8 3.24
2 0.76 1.52 2.31
26 Sqm
G.F 6 12.8 0.23 17.664 312.0169
10 7.31 0.23 16.813 282.677
F.F 6 12.8 0.23 17.664 312.0169
8 3.81 0.23 7.0104 49.14571
Parape 4 13.71 0.23 12.6132 159.0928
4 7.62 0.23 7.0104 49.14571
Total 3149903.95
5% Electrification charges 157495.20
5% Plumbing 157495.20
Supervision 3% 94497.12
GRAND TOTAL Rs--------- 3559391
THIRTY FIVE LAKHS SIXTY THOUSAND RUPEES ONLY. SAY 3560000/-