Date: 1/6/2022
Contents:
1- Pump Data
2- Problem Description
3- Our plan for check
4- Inspection Measurement
5- Procedure Plan
6- Tools – Equipment
7- Time Period
8- Manpower Required.
9- Conclusion & Recommended
1- Pump Data
• RPM: 1489
• Head: 60 M
• Flow Rate: 1400 M3 / hr.
• Model: 20 ENL-2
➢ Bowl Diameter :20 inch
➢ impeller Type: E (Enclosed)
➢ Bowl Model Type: N
➢ Impeller Model Designation: L
➢ No of Stage: 2
2-Problem:
pump shutoff pressure decreases from 10 bar to 4.5 bar.
3-Our plan to check the following points
✓ Inner diameter of First stage suction bell wear ring
✓ Outer diameter of first stage impeller wear ring
✓ Diameter of housing of Protective collar in first stage
✓ Outer diameter of protective collar in First Stage
✓ Shaft axial play
✓ Fist stage impeller status
✓ Shaft sleeves condition
And the Result of checking will be as the following:
4-Inspection Measurement
6-Tools:
Chain Block :2, Puller, slings :4, hand tools, Micrometer.
Equip:
Mobile Crane 120 Ton
7-Time Period:
2 days (48 hr.)
8-Man power Required:
1 Engineer + 2 Rotary Tech + 1 Helper
9- Conclusion & Recommendation