You are on page 1of 1

PROJECT: PETROCHEMICAL COMPLEX IN SOUTH OF

VIETNAM
Tổ hợp hóa dầu Miền Nam Việt Nam

OWNER: LONG SONG PETROLCHEMICAL CO., LTD

QUALITY CONTROL FORM PROJ. No.: 036909C QCF REV. A SH. 1 OF 1

NDT REQUEST FOR PIPING SUBCONTRACTOR: LILAMA Request No. : LLM-RQ-NDT-002

DATE: 03-Apr-2020
WORKING AREA PREFABRICATION ERECTION ✘

TRACE NUMBER (BEFORE) NDT Requirement


SPOOL JOINT JOINT VISUAL INSPECTION
LINE or DWG No. TYPE (1) JOINT DIAM. Schedule/ Thickness Material %NDT PWHT Remark
N° N° (BY SUBC.) (2)(3)/4)
TRACE NUMBER (AFTER) RT PAUT MT PT

R21718 74"
2DUG04-CWR-53125-01 - 026 B A 12,7 mm cs 100% X
R20141 74"
R21718 74"
2DUG04-CWR-53125-01 - 030 B A 12,7 mm cs 100% X
R20141 74"

NOTES:
(1) B=Buttweld S=Socket Weld EW=External Weld
(2) A=ACCEPTED R=TO BE REPAIRED
(3) Signature of the Subcontractor's Inspector (or equivalent Personnel).
(4) Signature of the Contractor's Inspector (or equivalent Personnel) only in case of its inspection’s attendance.

INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER

NAME

SIGNATURE

DATE