PROJECT: PETROCHEMICAL COMPLEX IN SOUTH OF

VIETNAM
Tổ hợp hóa dầu Miền Nam Việt Nam

OWNER: LONG SONG PETROLCHEMICAL CO., LTD

PROJ. No.:
QUALITY CONTROL FORM 036909C
QCF REV. A SH. 1 OF 1

NDT REQUEST FOR PIPING SUBCONTRACTOR: LILAMA Request No. : LLM-RQ-NDT-008

DATE: 13-Apr-2020
WORKING AREA PREFABRICATION ERECTION ✘

NDT Requirement
JOINT VISUAL
SPOOL JOINT Schedule/
LINE or DWG No. TYPE (1) JOINT DIAM. WPS WELDING WELDER(s) STAMP INSPECTION (BY Material %NDT PWHT Remark
N° N° Thickness
SUBC.) (2)(3)/4)
RT PAUT MT PT

2DUG03-IDW-53164-01 - 031 B 58" WPS-LLM-002 11-Apr-20 LLM-003/LLM-014 A 12,7 mm cs 100% X PIPE TO 90⁰ ELBOW
2DUG04-IDW-53164-01 - 006 B 48" WPS-LLM-002 11-Apr-20 LLM-001/LLM-011 A 12,7 mm cs 100% X PIPE TO 45⁰ ELBOW
2DUG04-IDW-53164-01 - 009 B 48" WPS-LLM-002 11-Apr-20 LLM-001/LLM-011 A 12,7 mm cs 100% X PIPE TO 45⁰ ELBOW
2EUG04-CWS-53065-01 - 078 B 48" WPS-LLM-002 11-Apr-20 LLM-007/LLM-008 A 12,7 mm cs 100% X PIPE TO PIPE
NOTES:
(1) B=Buttweld S=Socket Weld EW=External Weld
(2) A=ACCEPTED R=TO BE REPAIRED
(3) Signature of the Subcontractor's Inspector (or equivalent Personnel).
(4) Signature of the Contractor's Inspector (or equivalent Personnel) only in case of its inspection’s attendance.

INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER

NAME

SIGNATURE

DATE