VIETNAM
Tổ hợp hóa dầu Miền Nam Việt Nam
PROJ. No.:
QUALITY CONTROL FORM 036909C
QCF REV. A SH. 1 OF 1
DATE: 13-Apr-2020
WORKING AREA PREFABRICATION ERECTION ✘
NDT Requirement
JOINT VISUAL
SPOOL JOINT Schedule/
LINE or DWG No. TYPE (1) JOINT DIAM. WPS WELDING WELDER(s) STAMP INSPECTION (BY Material %NDT PWHT Remark
N° N° Thickness
SUBC.) (2)(3)/4)
RT PAUT MT PT
2DUG03-IDW-53164-01 - 031 B 58" WPS-LLM-002 11-Apr-20 LLM-003/LLM-014 A 12,7 mm cs 100% X PIPE TO 90⁰ ELBOW
2DUG04-IDW-53164-01 - 006 B 48" WPS-LLM-002 11-Apr-20 LLM-001/LLM-011 A 12,7 mm cs 100% X PIPE TO 45⁰ ELBOW
2DUG04-IDW-53164-01 - 009 B 48" WPS-LLM-002 11-Apr-20 LLM-001/LLM-011 A 12,7 mm cs 100% X PIPE TO 45⁰ ELBOW
2EUG04-CWS-53065-01 - 078 B 48" WPS-LLM-002 11-Apr-20 LLM-007/LLM-008 A 12,7 mm cs 100% X PIPE TO PIPE
NOTES:
(1) B=Buttweld S=Socket Weld EW=External Weld
(2) A=ACCEPTED R=TO BE REPAIRED
(3) Signature of the Subcontractor's Inspector (or equivalent Personnel).
(4) Signature of the Contractor's Inspector (or equivalent Personnel) only in case of its inspection’s attendance.
NAME
SIGNATURE
DATE