You are on page 1of 1

PROJECT: PETROCHEMICAL COMPLEX IN SOUTH OF

VIETNAM
Tổ hợp hóa dầu Miền Nam Việt Nam

OWNER: LONG SONG PETROLCHEMICAL CO., LTD

PROJ. No.:
QUALITY CONTROL FORM 036909C
QCF REV. A SH. 1 OF 1

NDT REQUEST FOR PIPING SUBCONTRACTOR: LILAMA Request No. : LLM-RQ-NDT-006

DATE: 10-Apr-2020
ERE
WORKING AREA PREFABRICATION CTIO ✘
N

NDT Requirement
JOINT VISUAL
SPOOL JOINT Schedule/
LINE or DWG No. TYPE (1) JOINT DIAM. WPS WELDING WELDER(s) STAMP INSPECTION (BY Material %NDT PWHT Remark
N° N° Thickness
SUBC.) (2)(3)/4)
RT PAUT MT PT

2DUG04-CWR-53125-01 N/A 001 B 74" WPS-LLM-002 9-Apr-20 LLM-010/ LLM-014 A 12,7 mm cs 100% X PIPE TO PIPE

2DUG04-IDW-53164-01 N/A 008 B 48" WPS-LLM-002 9-Apr-20 LLM-001/ LLM-011 A 12,7 mm cs 100% X PIPE TO 45⁰ ELBOW

2EUG03-CWS-53065-01 N/A 004 B 30" WPS-LLM-002 9-Apr-20 LLM-007/ LLM-008 A 12,7 mm cs 100% X PIPE TO 45⁰ ELBOW

2EUG03-CWS-53065-01 N/A 008 B 30" WPS-LLM-002 9-Apr-20 LLM-004 A 9,53 mm cs 100% X PIPE TO 90⁰ ELBOW

2EUG04-CWS-53065-01 N/A 009 B 30" WPS-LLM-002 7-Apr-20 LLM-002 A 9,53 mm cs 100% X PIPE TO 90⁰ ELBOW

2EUG04-CWS-53065-01 N/A 021 B 30" WPS-LLM-002 7-Apr-20 LLM-003 A 9,53 mm cs 100% X PIPE TO 90⁰ ELBOW

2EUG04-CWS-53065-01 N/A 028 B 24" WPS-LLM-002 8-Apr-20 LLM-007/ LLM-008 A 8,74 mm cs 100% X PIPE TO 45⁰ ELBOW

2EUG04-CWS-53065-01 N/A 037 B 24" WPS-LLM-002 7-Apr-20 LLM-002 A 8,74 mm cs 100% X PIPE TO 45⁰ ELBOW

2EUG04-CWS-53065-01 N/A 047 B 24" WPS-LLM-002 8-Apr-20 LLM-009 A 8,74 mm cs 100% X PIPE TO 45⁰ ELBOW

2EUG04-CWS-53065-01 N/A 062 B 24" WPS-LLM-002 8-Apr-20 LLM-007/ LLM-008 A 8,74 mm cs 100% X PIPE TO 45⁰ ELBOW

2EUG04-CWS-53065-01 N/A 072 B 30" WPS-LLM-002 9-Apr-20 LLM-004 A 9,53 mm cs 100% X PIPE TO 45⁰ ELBOW

2DUG03-CWR-53125-01 N/A 018 B 74" WPS-LLM-002 6-Apr-20 LLM-007/LLM-008 A 12,7 mm cs 100% X 45⁰ ELBOW TO 45⁰ ELBOW

2DUG04-CWR-53125-01 N/A 029 B 74" WPS-LLM-002 5-Apr-20 LLM-009/ LLM-002 A 12,7 mm cs 100% X 45⁰ ELBOW TO 45⁰ ELBOW
NOTES:
(1) B=Buttweld S=Socket Weld EW=External Weld
(2) A=ACCEPTED R=TO BE REPAIRED
(3) Signature of the Subcontractor's Inspector (or equivalent Personnel).
(4) Signature of the Contractor's Inspector (or equivalent Personnel) only in case of its inspection’s attendance.

INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER

NAME

SIGNATURE

DATE