Professional Documents
Culture Documents
Vendor: Client:
Petroleum Engineering and Development Company
DOCUMENT TITLE
DOCUMENT NUMBER
CT-PL-20-021 -DS-006
PURCHASER'S COMMENT/APPROVAL STATUS
Purchaser: PETROPARS IRAN (PPI)
AP: Approved Requisition No.:
AN: Approved with Minor Comments RE: Rejected SA01-CEPXX-SDEL-RQMA-0008
NF: Approved With Comments NR: will not be returned to the vendor Item No. (Tag No.):
EE-2-00-2-TX-10A & EE-2-00-2-TX-10B
Page 1 of 8
National Iranian Oil Company
Vendor: Client:
Petroleum Engineering and Development Company
Rev- Rev- Rev- Rev- Rev- Rev- Rev- Rev- Rev- Rev-
Page Page
V00 V01 V02 V03 V04 V00 V01 V02 V03 V04
1 * 36
2 * 37
3 * 38
4 * 39
5 * 40
6 * 41
This document is the property of PEDEC Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
7 * 42
8 43
9 44
10 45
11 46
12 47
13 48
14 49
15 50
16 51
17 52
18 53
19 54
20 55
21 56
22 57
23 58
24 59
25 60
26 61
27 62
28 63
29 64
30 65
31 66
32 67
33 68
34 69
35 70
Page 2 of 8
MZ-99-5068 ; M435-d22/Rev.2
National Iranian Oil Company
Petroleum Engineering and Development Company
South Azadegan Oil Field Development Project Phase I
I °
Ell Central Treatment and Export Plant (CTEP)
ENERCHIMI Class: A
DOCUMENT TITLE: DATA SHEET FOR ZIG-ZAG TRANSFORMER
DOCUMENT TITLE:
DOCUMENT NUMBER:
SA01-CTEPXX-SDEL-DSEL-0028
(tr 4
-C
\c‘ p
t(\\ (4 799 /iY/
0
Nr)t 6,),3 L4'1.)-k' 9 0,-"344.•
11.1
15
0.
0. D02 1-Mar-21 E.Jamali . H.Abdollahi A.Ladjvardizadeh SH.Mojahed Approved For Construction
DO1 24-Jan-21 E.Jamali H.Abdollahi A.Ladjvardizadeh SH.Mojahed Approved For Design
DOD 6-Oct-20 M.Maghsoudi H.Abdollahi A.Ladjvardizadeh SH.Mojahed Issued For Approval
15
PPI
REV DATE ISSUE PREPARED CHECKED AUTH PURPOSE OF ISSUE
APPROVED
Page 1 of 6 '
MZ-99-5068 ; M435-d22/Rev.2
ENERCHIMI
DOCUMENT TITLE: DATA SHEET FOR ZIG-ZAG TRANSFORMER Class: A
Page Rev-000 Rev-D01 Rev-D02 Rev-D03 Rev-004 Page Rev-000 Rev-D01 Rev-D02 Rev-D03 Rev-004
1 X X x 36
2 x x x 37
3 x x 38
4 x x 39
5 x 40
6 x 41
7 42
8 43
9 44
10 45
11 46
12 47
13 48
14 49
15 50
16 51
17 52
18 53
19 54
20 55
21 56
22 57
23 58
24 59
25 60
26 61
27 62
28 63
29 64
30 65
31 66
32 67
33 68
34 69
35 70
Page 2 of 6
MZ-99-5068 ; M435-d22/Rev.2
000 B QUANTITY
000 1 QUANTITY NUMBER No 2 OK
DUO 2 TAG NO EE-2-00-2-TX-10A & EE-2-00-2-TX-10B
age 3 of 6
MZ-99-5068 ; M435-d22/Rev.2
I no
National Iranian Oil Company A i
Petroleum Engineering and Development Company PPI
I. all ePTP,
South Azadegan Oil Field Development Project Phase I
Is 1111
Central Treatment and Export Plant (CTEP)
ENERCHIMI
DOCUMENT TITLE: DATA SHEET ZIG•ZAG TRANSFORMER Class: A
000 F CONSTRUCTION
TERMINAL BOX ARRANGEMENT: HV & LV & CONTROL CABLE
000 1 OPPOSITE TO EACH OTHER
TERMINAL BOX
CABLE BOX WITH DISCONNECTING
000 2 PRIMARY TERMINAL TYPE: •
CHAMBER
OK
000 2.1 CABLE / CONDUCTOR SIZE TBA
DOO 2.2 ENTRY DIRECTION BOTTOM OK
CABLE BOX WITH DISCONNECTING
DOD 3 SECONDARY TERMINAL TYPE:
CHAMBER
OK
I
DOD 3.1 CABLE / CONDUCTOR SIZE 3 • 8 • ( 1 • 500 mm ) CU/XLPE/AWA/PVC OK
DOD 3.2 ENTRY DIRECTION BOTTOM OK
DETACHABLE AND EQUIPPED WITH
000 4 RADIATOR
ISOLATING VALVES
OK
DOO 5 PAINTING EPDXY RAL7032 OK
BIDIRECTIONAL ROLLERS WITH SKID
DOD6 BIDIRECTIONAL RAILWHEEL / ROLLER OK
UNDERBASE
r
enr N.
.
,.....,,,
,._:. 451
c.
v, iw,I Y , dt
----
7
....---
,-
-----
Page 4 of 6
MZ-99-5068 ; M435-d22/Rev.2
....------
--------r<."-------
../ C ' //----'
Page 5 of 6
MZ-99-5068 ; M435-d22/Rev.2
_
National Iranian Oil Company i
1111 Petroleum Engineering and Development Company ap.., !
i #
INN
South Azadegan Oil Field Development Project Phase I 1
Ili
Central Treatment and Export Plant (CTEP)
ENERCHIMI
DOCUMENT TITLE: DATA SHED' ZIG-ZAG TRANSFORMER Class:A
000 I NAME PLATES, LABLES AND THEIR FIXING MATERIALS AS PER GENERAL SPECIFICATION / IPS
DOO N NOTES:
TRANSFORMER SHALL BE ADDITIONALLY PROVIDED WITH PROTECTIVE RELAY WITH THE FOLLOWING ALARM
000 1
CONTACTS:
Page 6 of 6