You are on page 1of 560

Historical

Perspective

Safety and Health Officer


Certificate Course

1
Learning Objectives
• To describe the historical development of
OSH management over the centuries

• To recall the background to the


development of OSHA 1994 and its
underlying philosophy

• To recall the development of occupational


safety and health management system

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• OSH before and during the industrial
revolution

• Development in OSH management


between the 1930’s and 1970’s

• Development of self-regulation legislation

• Modern OSH management


3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Early Recognition of
Occupational Diseases
• In 1473 a German physician, Ellenborg,
published the first known pamphlets on
occupational disease from gold
miners.

• In 1556 the German scholar, Agricola,


described the diseases of miners.

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Early Recognition Of
Occupational Diseases
• In 1713 Ramazzini, who is regarded as
the father of occupational medicine,
suggested that in diagnosis doctors
should ask patients about their
occupations.

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of
Industrial Safety Legislation
• In 1833 English Factory Act was the first
effective industrial safety law.

• It provide compensation for accidents


rather than to control their causes.

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of
Industrial Safety Legislation
• Insurance companies inspected work
places and suggested prevention
methods

• Problem: Safety became injury and


insurance oriented

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management
• Role of Herbert W. Heinrich (1930’s),
– Developed Domino Theory and promoted
control of workers behaviour.

• Problem:
• Focused on worker behaviour and not
management
• Caused people to think that safety is about
policing worker
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management
• Frank Bird (1970) developed Loss
Control Theory.
• Suggested that underlying cause of
accidents are lack of management
controls and poor management
decisions.
• Problem:
– Not so popular: blames management
(responsibility and control).
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management
• In 1980’s, Behavioural Based Safety (BBS) was
introduced;
• Based on Heinrich’s findings.
• Work by recognizing safe work habits and
offering rewards and punishment.
• Problem:
– Focuses on workers and not on hazard or
management
– Reward and punishment system have flaws
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management System
• Current development of Occupational Safety
And Health management system was driven
by two parallel forces:

A. Self-regulatory legislation in the United


Kingdom (1974),

B. Quality management movement

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation
• Lord Robens, Chairman of a Royal Safety
Commission Report noted that:
– there was too many OSH legislation,
– was fragmented,
– limited in coverage (specific hazards &
workplace),
– out of date and difficult to update,
– inflexible (prescriptive),
– people thought that safety was what
government inspectors enforced.
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation

• Lord Robens recommended


– Self regulation

• Report resulted in the Health and


Safety of Workers At Work Act in the UK
in 1974

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation

• Similar legislation was enacted in


Australia in 1984

• Enacted in Malaysia in 1994 after the


1992 Bright Sparkler accident in Sungai
Buloh

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation
• Features of “Robens style” legislation:
– General duties of care by:
• Employer, employee, manufacturer, designer,
supplier
• Duty of employer to make the workplace safe

– Consultation with employees through Safety


and Health Committees
– Safety and Health Officer as advisor and
coordinator
– Improvement and prohibition notices
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation

Legislation follow major accidents and


reinforce need for management system
ACCIDENT REGULATION/PROGRAMME
Flixborough (1974) CIMAH regulations 1996

Bhopal (1984) “Responsible Care” /


Process safety

Piper Alpha (1988) Risk Assessment /


Management system
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quality Management Approach
to Occupational Safety and
Health Management
• There are similar issues in safety management
as in quality management
• Example:
– Productivity
– Worker involvement
– Proactive approach
– Scientific approach
– Customer and human rights
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quality Management Approach
to Occupational Safety and
Health Management
• Management system standards:

– ISO 9000 QMS was proven successful and


ISO 14000 EMS was introduced in 1996

– UK published BS 8800 and Australia AS8401


OSH management systems in 1996

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quality Management Approach
to Occupational Safety and
Health Management
– International and auditable OHSAS 18001
OSH Management System published in
1999

– ILO approved an OSH management


system for governments to adopt during
2000
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
– The industrial revolution cause of industrial
accidents.

– Laws were enacted to compensate and


protect workers in 1833.

– Safety management guidelines began


with Heinrich and followed by Frank Bird
and others.

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary

– Lord Robens in 1972 recommended self-


regulatory legislation. Adopted by
Malaysia in 1994.

– Outcome of accidents in the 1970s and


1980s resulted in OSH management
system today.

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary

- Health problems due to occupation has


been known from ancient times

- Industrial accidents became rampant after


the industrial revolution

- Accidents in the 70’s & 80’s resulted in OSH-


MS today

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident Prevention

Safety And Health Officer


Certificate Course

1
Learning Objectives
• To define what is incident

• To explain the causes of incident & role


of management control

• To explain 3 theory on accident


causation

• To list the cost involved in an incident


2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Principles of loss prevention

• Causes of incidents

• Incidents and productivity

• Approach to loss prevention

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of
Incident Prevention

1. Incident prevention is an essential part


of good management

2. Management and workers must fully


cooperate

3. Top management must lead in


organising safety

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of
Incident Prevention
4. There must be an OSH policy

5. Must have organisation and


resources to implement the OSH
policy

6. Best available knowledge and


methods must be applied
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Is An Incident?
• An incident is:
– An unexpected, unplanned event in a
sequence of events
– That occurs through a combination of
causes
– Which result in:
• Physical harm (injury, ill-health or disease) to an individual,
• Damage to property,
• A near-miss,
• Any combination of these effects.
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Prevent Incidents?

• Legal

• Human Rights

• Business

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Causes of Incidents

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Incidents
• Cause immediate injury or damage to
equipment or property:
– A forklift dropping a load
– Someone falling off a ladder

• That occur over an extended period:


– Hearing loss
– Illness resulting from exposure to
chemicals
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Early Theory of Accidents
(Heinrich (1930's))
Ancestry/social
environment

Fault of a person

Unsafe
act/condition

Accident

Injury
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Heinrich’s
Five Stage Sequence
Ancestry/social
environment

Fault of a person

Unsafe
act/condition

Accident

Injury
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Accident Causation Model
(1974)

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Three Basic Causes of
Accidents
•Poor Management Safety Policy & Decisions
 •Personal Factors
•Environmental Factors
Basic Causes
 Unsafe Act Indirect causes Unsafe
Condition 

Unplanned Incident ACCIDENT


Personal Injury,
Direct Causes Property Damage

13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Lack of Management Control
• Management responsible for:
– Selection of workers
– Machinery and equipment
– System of work
– Information, training and Instruction
– Supervision, etc
• The accident prone worker is a false
approach. It is like blaming the victim
instead of the perpetrator
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Multiple Cause of Accidents
Cause A
(Poor lighting)

Cause B Accident
(Not look where going) (Trip)

Cause C
(Wood in walkway)

Compatible with Loss Causation Theory


15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fall From a Defective Ladder

– Why was the defective ladder not


identified during normal inspection?

– Why did the supervisor allow its


usage?

– Didn't the injured employee knew it


should not be used?

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fall From a Defective Ladder
– Was the employee well trained?

– Was the employee reminded not to


use the ladder?

– Did the superior examine the job


first?

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Trip Although Warned in
Dark Walkway
– Was there a necessity for that person
to walk in that area or was there a
safer route

– If the person was not in a hurry


would they have been more aware
of their surroundings and avoided
the wood
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Trip Although Warned in
Dark Walkway

– If the area was better lit would the


person have avoided the wood

– Could the wood have been


removed

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Accident Pyramid

1 Fatal / Serious injury

3 Lost days

50 First aid

80 Property

400 Near misses


TYE/PEARSON/BIRD 1969-1975
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Accepted Accident Theory
• Multiple Causation Theory
– A single unsafe act or condition may or
may not cause an accident but both
are caused by lack of management
control

• Bird Loss Causation Model


– In line with Schewhart(1930’s) theory of
quality control
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Accepted Accident Theory

• Heinrich’s theory is weak and negative


– Blaming victim and lack system thinking,
continual improvements, upstream
control and worker participation

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Productivity Aspect of OSH

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Direct Vs. Indirect
Incident Cost Iceberg

Direct It is estimated that


for every $1 in direct
Costs incident costs, there
Indirect are anywhere from
Costs $4 to $11 in indirect
or “hidden” costs

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Hidden Costs
Insured Costs -- covering injury, ill health, damage.
Hidden Uninsured – 8-36 times as much as insured costs

1. Product and 7. Investigation time


material damage 8. Supervisors time
2. Plant and building diverted
damage 9. Clerical Effort
3. Tool and 10.Overtime working
equipment 11.Temporary labour
damage 12.Loss of expertise /
4. Expenditure on experience supplies
emergency 13.Clearing site
5. Fines 14.Production delays
6. Legal costs
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident Prevention Costs
• DESIGN COSTS (e.g to install machine
guards)

• OPERATIONAL COSTS (training costs, PPE,


etc.)

• SAFE GUARDING THE FUTURE COSTS (health


surveillance, audits etc)

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Cost- Benefit Analysis of Control
Measures
• Compare specific incident costs with
cost of specific improvement being
suggested

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Du Pont Ten Principles of Safety
Management
• All injuries and occupational illnesses are
preventable

• Management is directly responsible for


doing this

• Safety is a condition of employment

• Training is required
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Du Pont Ten Principles of Safety
Management
• Safety audits and inspections must be
carried out

• Deficiencies must be corrected promptly

• All unsafe practices, incidents and injury


accidents will be investigated

29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Du Pont Ten Principles of Safety
Management
• Safety away from work is as important as
safety at work

• Incident prevention is cost-effective; the


highest cost is human suffering

• Employees must be actively involved

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Incident in the workplace is largely caused
by lack of management control
• “If you think safety is expensive, try
accidents”
• Implement an appropriate company policy
• Control OSH risk
• Put a management system in place
• Promote Occupational Safety and Health

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Management
System (OSH-MS)

Safety and Health Officer


Certificate Course

1
Learning Objectives
• To define what is a system
• To define what is an OSH
management system
• To describe the purpose of a system
• To explain 5 components of typical
OSH-MS

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope

• Introduction to concept of “system”


• Application of Management System to
Occupational Safety And Health
• Review of existing Occupational Safety
And Health Management Systems
• Typical occupational safety and
health management systems elements

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is a system

More
than one
elements

SYSTEM

Inter- Moving in
related sequence

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is a System
• An orderly set of components that work
together for a certain purpose
• E.g. the blood circulatory system
– Components:
• Heart and blood vessels (artery, veins,
capillaries)
– Purpose:
• To transport blood which contains oxygen and
nutrients to all parts of the body
• To carry wastes away to be filtered out of the
body
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an OSH Management
System
• An OSH management system
– Components:
• Arrangements (policy, planning, implementation
and operation, checking, management review)
– Purpose:
• To ensure safety, health and welfare of workers
• To comply with regulation
• To manage and minimize OSH risk to
acceptable level
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Do You Need a System
• A system is useful when there are:
– Many activities have to be managed
together
– Complex information that are
changing have to be taken into
account at all times
– Enables training needs to be
identified and the adequacy of
subsequent training assessed through
measures of competency
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Do You Need a System

• A system organises and simplifies


complexity

• A system provides order, structure, and


focuses on the purpose and objective
of activities

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Typical OSH-MS “Components”
1. Policy
2. Plan - System planning, OSH objectives,
development and implementation
3. Do - Responsibility and accountability;
Competence and training, Hazard
control system
4. Check -Performance measurement;
Accident / incident investigation;
Auditing
5. Act - Preventive and corrective action,
Continual improvement
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
An OSH-MS System Model
OSH-MS such as MS1722:2011 & OHSAS
18001:2007 are based on the Quality
Management System components of Plan,
Do, Check and Act (PDCA)
INPUTS
PLAN DO POLICY OBJECTIVES

VISION Identify Hazards Enforce Procedure


HAZARDS Supervise Safe & healthy
Make Arrangements Respond Emergency Workers
LEGISLATION Assign Responsibility
THIRD PARTY INPUTS Train Productivity
Arrange resources Communicate Organisation Image
ETC

CHECK
ACT Monitor
Corrective Action Surveillance
Review Inspect
Improve Investigate
Audit
Record & Analyse

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Existing OSH Management
System
• There are two occupational safety and health
management system standards:
– OHSAS 18001:2007 Occupational Health & Safety
Management System standard
• This standard was established in 1999
• Latest version 2007
• Widely used and certifiable
– MS1722:2011 management system standard
• This standard was published in 2003
• This is a guidance standard
• Latest version 2011
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
MS1722:2011 Management System
Model
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Continual
improvement

OH&S
Management policy
review

Checking and Planning


corrective action

Implementation
and operation

OHSAS 18001:2007 Occupational Health


& Safety Management System Model
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy
• Promoting health and preventing
accidents, diseases and other work-
related health effects
• Complying with OSH legal
requirements and other requirements
• Recognizing OSH performance is an
integral part of business performance

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy
• Workers and their representatives are
consulted
• Ensuring that management and
workers are competent and
understand their rights
• Allocating the necessary resources
• Continual improvement
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Initial Review

Compare what you have with:


a) Requirements of relevant legislation
dealing with OSH management issues
b) Best practice and performance in your
industry sector and other appropriate
sections
c) Efficiency and effectiveness of existing
resources devoted to OSH management

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Objectives
• Based on the initial review and
consistent with the OSH policy set
measurable and quantifiable
objectives to implement the policy

• Communicate objectives to all relevant


functions and levels of the organization

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organising
• Responsibility and accountability for
OSH performance for managers &
supervisors

• Competence and training of


employees

• Management System documentation


should be established and maintained

18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organising
• Procedures should be established and
maintained for communications
externally, internally and how to receive,
document and respond comments from
third party

• Participation and Consultation


Cooperation on OSH aspects between
the employer, management and workers
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organising

• Control of documents procedure should be


established for standardization and safe use
of documents
• Operational control associated with the
identified hazards where the
implementation of controls is necessary to
manage the OSH risk
• Emergency preparedness and response to
identified potential emergency situation

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing

• Ongoing hazards identification and


assessment
• Preventive, protective measures
implemented in order of priority
• Procedures must be relevant to
identified risk

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing

• Before any changes Assess risk, take


steps and inform, train employees
before implementing
• Have an emergency preparedness
and response arrangements
• Procedures for purchasing and
contracting

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Monitoring and Measurement

• Performance measurement
• Evaluation of compliance
• Accident, disease and incident investigation
• Control of record
• Auditing
• Management review

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Elements

• Preventive and corrective action

• Continual improvement

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
MS1722:2011 Standard
Requirements
• The MS 1722:2011 standard contains
the following components:
1. Policy
2. Organizing
3. Planning and Implementation
4. Evaluation
5. Action for Improvement
Management Review
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy
• Management must have a written
OSH policy
• Management must commit
themselves to:
1. Promoting health and preventing
accidents, diseases and other work-
related health effects in the workplace
2. Complying with OSH legal requirements
and other requirements
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy

3. Workers and their representatives are


consulted when making workplace rules
and regulations

4. Providing the necessary resources to


ensure that work and the workplace is safe

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organizing
• Management as a whole is responsible
for OSH

• Ensuring that management and


workers are competent to carry out
their tasks, especially the hazardous
ones

28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organizing
• Employees are informed of hazards
they are working in and procedures
are established to ensure their safety
and health

• Management must promote safety


and health

29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Planning and Implementation
• Hazards identification and assessment is
made the basis of OSH management
• Preventive, protective measures must be
implemented
• Have an emergency preparedness and
response arrangements

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Planning and Implementation

• There must be procedures for


purchasing and contracting to ensure
safety and health requirements are
incorporated in purchased materials
and equipment as well as in
contracting activities
• OSH management activities must be
planned and performance targets set
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Evaluation
• OSH management programmes must
be monitored

• Investigate work-related injuries, ill


health, diseases and incidents, and
their impact of OSH performance

32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Evaluation

• Carry out regular audits

• Management must review its activities


to ensure OSH risks in the workplace
are ALARP, that the OSH programme is
efficient and that its OSH performance
targets are met and improved upon

33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• A system is a set of components that
work together for a certain purpose

• In an OSH Management System the


input for the system is workplace
hazards, legislation and expectations
of others

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• The components of OSHMS are
Policy, Plan, Do, Check, Act

• The objective or purpose of an


OSHMS such as MS1722:2011 or
OHSAS 18001:2007 is to ensure the
welfare safety and health of workers
and compliance with regulations.
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy - Organisation
& Arrangements

Safety and Health Officer


Certificate Course

1
Learning Objectives
• To define what is an OSH policy
statement

• To describe the importance of OSH policy

• To explain four steps in implementing OSH


policy
• Mind map OSHMS

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• What is an OSH Policy and Why do we need
it
• Legal requirements of an OSH Policy
• Formulating the policy
• Implementing the policy
– Responsibility assignments
– Arrangements required to implement the policy
– Monitoring the policy
– Reviewing and revising the policy

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an OSH Policy
Statement?
• Overall intentions and direction of an
organization related to its OSH
performance as formally expressed by
top management
• The OSH policy statement is a
document that sets out how the
organisation will manage safety and
health in the workplace.

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why are OSH Policy Statement
Important?
• Demonstrate top management accountable to
their employees health and safety
• A statement of commitment from top management
• Shows employees that management cares
• A guide for all levels of employees to base their
actions and decisions
• The starting point for planning and organising OSH
programmes
• Framework for setting and reviewing OSH objective
• Required by law
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements –
OSHA 1994
• To have a written OSH policy statement
• Employees must be aware of the
requirements of the policy
• OSH Policy is to be implemented
– Organisation (responsibilities)
– Arrangements (plans, resources, procedures,
system of work, etc.)
• To revise the policy when necessary
• Exemption to organization with less than 5
employees
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4 Steps in Implementing
OSH Policy
1. Formulate and write the policy
– Include statements of vision and goals,
– Provide framework objectives and target
related to risk

2. Implement policy by making


arrangements
– Organisation, OSH programmes, appointments

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4 Steps in Implementing
OSH Policy

3. Communicate the policy


– Announce and display statement,
communicate responsibilities and OSH
programmes

4. Monitor and revise as necessary

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Formulating the OSH Policy
• The policy has to be read, understood and
acted upon by employees, supervisors and
managers. Therefore it must be SMART:
Simple (Use layman’s language, to the
point)
Measurable (Performance can be monitored)
Achievable (Realistic and based on own
needs)
Reasonable (Always aim high but must be
Practical)
Tractable (Able to be analysed and
tracked over period of time)
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Formulating the OSH Policy
• Make statements that take into account:
– Vision and goals (“zero accident”, continual
improvement)
– Legislation (compliance, competency of
employees)
– Clients (compliance to clients’ safety
procedures)
– Associations (“Responsible Care”)

• Requirements Of OSHA1994 (Section 16)


10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Formulating the OSH Policy
• Generally Address nature of hazards in the
workplace
– Information from:
• Hazard identification and Risk assessment
• Consultation with workers especially
recommendations from the Safety Committee
• Good practice
– General nature of hazards in industry
• E.g. changing nature of hazards in various
phase of construction industry
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Formulating the OSH Policy
• Policy statement should clearly state
general role and responsibilities of
employees
• For example:
– Managers and supervisors at all levels to enforce
OSH rules in their respective area or function
– Employee to report near-misses
– Supervisors to investigate accidents
– Managers to supervise contractors

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing the OSH Policy
1. Begin with goals, statement of intent,
objectives, identified risks as stated in the
policy
2. Establish OSH programme(s).
Example of programme
• Maintenance of safety critical equipment
and plant, safe working environment, means
of access to and egress and requirement of
Job Safety Analysis

3. Provide resources and assign


responsibilities
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Monitoring the OSH Policy
• Record Keeping
• Accident/ill health record
• Compliance with legislation
– Appointments (Safety and Health Officer, Safety
Committee established, etc.)
• Targets set and achieved
• Compliance with organisation /
arrangements (systems of work etc.)

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Monitoring the OSH Policy
• Monitoring and Surveillance of
workplace environments
• Workplace inspections
• Auditing
• Incident / accident investigation

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Reviewing and Revising the
OSH Policy
(By Safety Committee)
• Performance statistics
• Review policy
– Experience
– Operational or organisational changes
– Alterations of plant or processes
– New legislation
– New hazards identified
– Change of business
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
1. A written OSH Policy is required by law
2. Formulate the policy to reflect OSH
arrangements and organisational goals
3. Write a simple policy so that it is easily
communicated and understood
4. Implement the policy by having a policy
implementation programme
• Assign responsibilities to all
• Provide arrangements
• Monitor the policy implementation
• Review the policy as necessary

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Promotion,
Training &
Communication
Safety and Health Officer
Certificate Course

1
Learning Objectives
• To identify 6 promotional techniques

• To describe the process of communication

• To demonstrate interpersonal
communication

• To identify OSH training

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• OSH promotion and techniques

• Processes of communications

• Application of communications in the


workplace

• Training methods and strategy

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Promotional Technique
Use combinations of the following techniques
to reinforce health and safety message:
• Leading by example

• Employee involvement

• Use of reward, incentives and disincentives


• Best practice
• Communication
• Training

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Leading By Example
• Management at all levels and on all
occasions must never ignore safety rules

• Use of non-verbal communications:


– Top management seen to be committed
– Safety is enforced by management at all levels
and not by the safety officer alone
– Suggestion implemented if appropriate
– Management are aware of their non-verbal
communication styles and is a good listener

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Employee Involvement
• Joint management-employee programmes:
– OSH safety day, week, month
– Competitions
– Management reporting of Incidents on notice
boards, bulletins and newsletters
– On-going hazard spotting and near-miss
reporting, inspections, house-keeping, etc.

• Management interactions through meetings,


committees and gatherings
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Use of Rewards Recognition
Incentives and Disincentives
• Rewards Recognition Incentives are well-
known techniques used for motivations.
– In some organisations good performance in OSH
is employee’s term of employment
– Annual bonus penalty against non-performing
departments
• Need to be careful. It might resulted in less or
none reporting of incidents
– Disincentives through penalties and contract
award used on contractors
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Best Practice
• Top management provides leadership
• Safety controls must be designed into
every aspect of the organisation
• Managers at all levels are responsible
for safety and health – safety first and
no shortcuts

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Best Practice

• Objectives and Targets setting


• Enforcement of high quality
standards
• Adoption of occupational safety
and health management systems
standards

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Employee Attitude Survey
• Measures employees' perceptions;
perception is reality
• Productivity and morale is closely linked to
perceptions of their work environment
• Questions e.g.
– Quality of management communications
– Satisfaction with employee training
– Safety and health concerns
– Cooperation among peers and workgroups
– Understanding a corporate goals and mission
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Communications

11
Importance of Communication
• Most of our working life is spent
communicating: to get things done, to
report or to receive instructions

• Job of SHO to communicate to workers,


colleagues, managers and the authorities

• SHO must be aware of his verbal and non-


verbal impact on the job

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Communication Process
• Communication is a two-way process

• A message maybe misunderstood by a


recipient because of the following:
– The education, experience and culture of the
recipient
– Background noise and the hearing of the
recipient
– The perceived non-verbal message coming from
the sender
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Result of Poor Communications

• Poor communications or failures in


communications can introduce hazards

• Hazards can be introduced when changes


in design, operations and procedures are
not communicated adequately to those
who are affected by them

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When Coaching or Instructing
• Instructions should be:
– Simple, clear, accurate and complete
– In proper sequence

• A supervisor needs feedback to ensure


that the message is understood and as
intended

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Meetings and Committees
• A meeting is where employers can meet
with employees to discuss common
problems and to get employee feedback
• Employer-employee consultation is one of
the distinguishing features of quality
management
• Mandated by regulations and OSH-MS
– For example Safety and Health Committee

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Toolbox Meeting
• Toolbox meetings are carried out regularly:
– Every morning by the supervisor before the
workers start their work
– To remind workers of the danger or hazards in the
workplace during the activities for the day
• Brief (10 -15 minutes) and on one topic
• Attention is given to requirement for
attendants and participation at the meeting

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Non-Verbal Communications
• Notice boards - incident/near-miss on
• Bulletins – alerts on specific accidents or
lessons learned
• Newsletters - news, messages, articles
• Warning signs – at places of hazards
• In law workers need to know hazards they
are exposed to:
– Labels – on containers of chemicals
– Data sheets – MSDS
– Instruction manuals
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Information Sources
• NIOSH - Training programmes
- Information & consulting service
- Newsletter

• SOCSO - Statistical information on


accidents
- Rehabilitation information

• DOSH - Legislation information


19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Information Sources
• Trade Associations - Industry information

• Manufacturer / Supplier - CSDS's

• Consultants

• Libraries

• Internet

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazards Communications
• Employees and the public has to be
protected against harm

• Have a need and a right to know of:


– Explosion, fire, exposure to hazardous chemicals
risks
– Identity of exposure – chemicals name, etc.
– Protective measures to prevent occurrence
– Actions to be taken during such occurrence

• Management has to carry out risk


assessment

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Importance of Listening
• Suggestions and reports of incidences
or near misses from workers are
important
• Workers will not communicate if they
perceive that supervisors:
– do not respect his person
– are not listening
– do not care

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Importance of Listening

• Supervisors and safety officer must be


aware and must practise active
listening

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Active Listening
• Non-verbals techniques include:
good eye contact, facial expressions, body
language, silence, touching

• Verbal techniques include:


"I'm listening" cues, disclosures, validating
statements, statements of support,
reflection /
mirroring statements
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Active Listening
Avoid these common mistakes:
– Interject with your own opinions and ideas
– Ask questions too early in the
conversation
– Make value judgements
– Attempt to solve the problem
– Use Active Listening when you don't have
the time to really listen

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Dealing with Conflicts
• AVOIDANCE - see others point of view
and agree course of action.

• RESOLUTION - identify underlying


problems and “develop” workable
solutions.

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Dealing with Conflicts

• SETTLEMENT - compromise without


dealing with underlying cause, a short
lived solution.

• MANAGEMENT - live with the conflict


(how much can be tolerated and for
how long?)

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Reason Why Employees Do Not Perform
As Expected - Ferdinand F. Fournies
• They don't know why they should do them.
• They do not know how to do the task
correctly.
• Education and training will eliminate the
causes for substandard performance.
• Education and training will give them
knowledge.
• With knowledge their attitude towards
work will change.
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Train and Retrain?
• Instructions and procedures alone is not
sufficient.
• Shortcut for learning from experience.
• Employees need to know what they are
looking at or what to do and what to look
for.
• Cannot assume experience from previous
employer is similar.
• Materials, processes and technology may
have changed.
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Common Sense?
A Mistaken Assumption!

• Training and common sense


– Sound judgements could only be
developed over time through
experience and specific workplace
settings and specific tasks.

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements

• Regulation require training and


competency of workers.

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements
• For example:
– Factory And Machinery Act 1967
– Lead Regulations 1984, Asbestos Process
Regulations 1986, etc.
– Occupational Safety And Health Act 1994
– USECHH Regulations 2000, CIMAH
Regulations 1996, Safety and Health
Committee Regulations 1996, SHO
Regulations 1997
– Operator competency requirements
– Crane, scaffold, forklift, engine driver,
charge man, confined space, etc.
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Assessing Training Needs
• Begin the assessment by establishing:
• Aims and objectives of training
• Time scale
• Level at which training is required

• Conduct a training needs analysis:


• Identify job to be done and skill required
• Analyse skill which individuals already have
• Identify skills gaps
• Train to cover the shortfall
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Training
• Awareness
• General
• Specific
• Skills
• Competencies (knowledge, qualification,
practice and experience)

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training Documentation
• Should be kept for all employees
and contractor training:
– Type
– Names of trainees
– Checks on learning
– Date
– Date / type of next training

35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary

• OSH has to be vigorously promoted.


• Top management and managers at all
levels have to be responsible for OSH
promotion.
• Workers have to participate.
• Good Communications are essential.
• Training is required and has to be
planned to be effective.

36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documentation

Safety and Health Officer


Certificate Course

1
Learning Objectives

• To describe 4 levels of documentation

• To describe writing procedure

• To describe how records are control

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Levels Of Documentation

• Documentation Requirements

• Procedure Writing

• Document Control

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Documentation
• What is a document?
– Information and its supporting medium
– Paper or booklet providing information
– Record or report in detail

• There are four levels of documentation


– Manual
– Procedures
– Work Instructions
– Forms and records
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Documentation Pyramid

Safety
Manual
Procedures

Work Instructions

Records, Forms, Reports

Hierarchy of Documentation
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 1 - Manuals

6
What are OSH Manuals For?
• Description of the main element of the
OSHMS and their interaction, and reference
to related documents
• Provide information for effective control of
hazards in the workplace
• To control OSH management activities in
accordance with requirements
• Provide overview information of OSH
management system
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of OSH Manual

• Scope of OSHMS, OSH policy and


objectives, description of main
elements of the OSHMS, reference to
related documents, roles and
responsibilities, and associated
records Statements, procedures,
instructions and records

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of OSH Manual
The manual at the minimum contain:
• Scope of OSHMS
• OSH policy statement and OSH objectives
• Description of the main elements of the OSHMS
• Assignment of roles and responsibilities
• List of significant hazards/risks and arrangements for
prevention and control
• Personnel competency and training records
• Procedures, instructions and other internal documents for
OSH management
• Reference to related documents
• Associated records

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 2 - Procedures

10
What Are OSH Procedures?
• Translation of the organisation’s policies,
objectives, and programmes into specific
instruction.
• Basis for effective control of hazards and of risks.
• Specified way to carried out activity or a
process (procedure can be documented or
not)
• Description of elements as defined in OSH
manual
• Procedure as required by management system
standard requirements
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Are OSH Procedures?
• To control management activities in
accordance with specified
requirements.
•Procurement activities and
arrangements
•Monitoring and control activities
•Selection and use of materials or
equipment

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documentation (Procedures)
are Required when:
• A consistent and standard approach is
required
• Seek for consistency of implementation
within organization
• Risky, hazardous or complex operations
requiring sequence and detailed steps
• Lesson learnt from previous mistakes need to
be captured and communicated to others
so that it will not be repeated
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When Procedures are Required –
Support Activities
• Inter-department relationships such as
finance, human resources and general
administration (eg; training needs,
competency requirements, roles and
responsibilities)
• Standardize implementation in relevant
functions and level within the organization
• Achieving compliance with policy,
programme and legal and other
requirements
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When Procedures are
Required – Support Activities

• Monitoring and control


arrangements and activities

• Selection and use of raw materials


and equipment

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Procedures
• Hazard Identification, Risk • Performance
Assessment and Risk Measurement and
Control Monitoring
• Legal and other • Evaluation of Compliance
Requirements • Incident Investigation,
• Competence, Training Nonconformity, Corrective
and Awareness and Preventive Action
• Communication, • Control of Records
Participation and • Internal Audit
Consultation
• Control of Documents
• Emergency, Preparedness
and Response

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 3 – Work Instructions

17
Instructions
(How we do our daily job)
• Provide detailed information on how to:
– Perform specific tasks
– Use of specific method and system of work
– Use of specific equipment
– Timing
– Result
– Prepare forms
– Refer to other documents
– Control of processes that relate to the
management of its OSH risks
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Instruction

The instruction for unloading a tanker:


– Apply hand brake, use wheel chocks and
connect an earthling lead

– Attendance of the driver and warehouse


representative at all times whilst unloading
(cross referenced to their specific
responsibilities, as above)

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Instruction
– Checking the connection of the delivery
hose, drainage of the residual liquid into a
container on disconnection and

– Having a spill containment kit available


during the unloading process (cross-
referenced to the procedure covering
spill response and emergencies)

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Instruction
• Excavation work • Management of
• Forklift operation Change
• Working at height • PPE
• Pest control operation • Procurement and
• Chemical contracting
management • Contractor
• Housekeeping management
• Heavy lifting
• Night work
• Traffic management
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 4 - Records, Forms,
Reports and Registers

22
Records, Forms, Reports
(How we do our daily job)
• Records are documents used to track
and demonstrate compliance/
performance
• A form is a documentation to
standardise records

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records, Forms, Reports
(How we do our daily jobs)
• Reports are summaries of performance
or their analysis (Report is a part of
record)

• Register is an official or formal list


recording names, events, or
transactions

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records may Include:

• Management system implementation


records
• Work-related injuries, ill health,
diseases and incidents
• Regulatory requirements

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records may Include:

• Workers' exposures, surveillance of the


working environment and workers'
health
• Results of both active and reactive
monitoring
• Minutes of meeting

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Examples of Records
to be Kept
• Legal, regulatory and other • Hazardous material spill /
code requirements other incident reports
• Results of risk Assessment • Communications with
• Permits, licenses and other customers, suppliers,
approvals contractors and other
• Training records external parties
• Audit and regulatory • Results of management
compliance audit reports reviews, minutes of meeting
• Reports of identified • Sampling and monitoring
nonconformities, corrective data
action plans and corrective • Maintenance records
action tracking data • Equipment calibration
records

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records and Retention Periods
On-site Records/files
Document Retention
time
Training records 10 yrs.
SHC minute of meeting 7 yrs
Monitoring data 30 yrs.
Failures, incidents, complaints and follow- 30 yrs.
up actions
Maintenance records 10 yrs.
Chemical inventory reports 30 yrs.
Hazard communication documents 30 yrs.
MSDS 10 yrs.
Permits-while active
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Procedure & Work Instruction
Writing

29
Documentation vs. Training
• Keep procedures to the minimum
(It is important that documentation is proportional to the level
of complexity, hazards and risks concerned and is kept to the
minimum required for effectiveness and efficiency)

• Supplement procedures with education, training


and supervision. Many accidents are caused by:
• Lack of procedures
• People are unaware of the procedures
• They do not understand the procedures
• Procedures without training is ineffective

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documentation vs. Training

• Procedures not reviewed, revised and


updated could be hazardous

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Should be in the
Procedures/Work Instruction
• Objective and Scope
• Responsibilities
• Clear definition of the organisational structure
• Reporting relationships if any
• Authorities
• Management controls (approvals, etc,)
• The competence, qualification, training and
education of personnel
• Process steps

32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Making Use of Procedures/Work
Instruction
• Safe system of work procedures/work
instruction can be ncorporated/integrated
into a method statement.

• A collection of safe systems of work can


be consolidate/put together to form a
wide-ranging and practical rulebook for
employees.

33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Requirements
• Clearly written (what people need to
do), accurate, and comprehensive
• To be understood by those who have
to use them (user-friendly)
• Involve users in writing (committee
involved during write up/formulation)

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Requirements

• Periodically reviewed
• Revised as necessary
• Communicated to users
• Readily accessible to all affected by
them

35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Requirements
• Procedures/Work Instruction should be
appropriate to the nature, complexity and
significant risk
• Established, managed and maintained
locally
• Should be identifiable
• Records
– Traceable
– Retention times should be specified
– Health records are confidential
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure Work
Instruction
• Procedures Work Instruction should
cover, where relevant, the three
periods of undertaking:
– Before work is begun (preparation)
– During
– After (cleanup and commissioning)

37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure Work
Instruction
• Work Instruction should also cover periods
of:
– Start-up operations
– Normal operations
– Abnormal operations e.g. during maintenance
– Emergency Operations e.g. during a flood

38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure/Work
Instruction
Approval Requirements
– New procedures and all revisions
– Approval assures that all involved and
affected have the opportunity to take
exception to, offer input to, or approve of
administrative procedures
– The approval of head or CEO of issuing
organisation is most important

39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure/Work
Instruction
Approving authority
A. Issuing department's manager
B. Person primarily responsible
C. Any manager whose department is
affected
D. Author of the document
E The SHO
F. Head or CEO of the issuing or using
organisation
40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documenting Standards

• Effective date

• Responsibilities

• Approval signature line

• Title of document

41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documenting Standards
• Effective date

• Revision number

• Purpose of the document (work


instruction, procedure, etc.)

• Scope/applicability of the document

42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documenting Standards

• References

• Page numbering (page 1 of 4,2 of 4,


etc.)

• Procedural steps

43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Purpose of Procedure and
Records Control
• There should be a procedure to
ensure:
– That they can be located
– Are periodically reviewed, revised as
necessary
– Approved for adequacy by authorized
personnel
– Current versions of relevant documents are
accessible for those who need them
44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Prevent Non-current Documents
From Unintended Use
• Remove promptly from:
– All points of issue
– All points of use
• Archival documents are suitably
identified
• Note: Archival documents are data retained
for legal and knowledge preservation
purposes.
45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Procedures ensure consistency and
continuity of work.

• Work Instruction/Procedures minimise


accidents especially for hazardous
operations or workplace environments.

46 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary

• Procedures have to be clear written,


simple and supplemented by training

• Procedures have to be reviewed and


revised

• Procedures have to be controlled

47 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment And
Management

Safety and Health Officer


Certificate Course

1
Learning Objectives
• To define what is hazard, risk and danger

• To explain the risk assessment process

• To describe the method of identifying hazard

• To use the risk assessment matrix

• To explain the hierarchy of control

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope

• Overview of risk and risk assessment

• Planning for risk assessment

• Risk control

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Overview of Risk and
Risk Assessment

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Definitions
• Hazard: A source, situation or act with
a potential for harm in terms of human
injury or ill health and damage to
property (Source: MS1722:2011)

• Danger: Relative exposure to hazard

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Definitions
• Risk: A combination of the likelihood of an
occurrence of a hazardous event or
exposure with specified period or in
specified circumstances and the severity of
injury or damage to the health of people,
property, environment or any combination
of these caused by the event or exposure
(Source: MS1722:2011)

6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment

• What is Risk assessment: The process


of evaluating the risks to safety and
health arising from hazards at work
• Risk assessment results is documented
and used for:
1. Risk control in OSH management
2. Future reference and review

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Principles of
Risk Management
1. Integrate Risk Management as part
of planning at all levels of business
2. Accept all risks
3. Make risk decisions appropriately
(depending on level of risk)
4. Manage the risk

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Carry Out
Risk Assessment?
• Gives organisations a more effective way of
managing hazards
- Systematic way of understanding hazards
- Control hazards based on facts
• Requirement of the law e.g.
– OSHA 1994, CIMAH Regulations 1996 & USECHH Regulations
2000
• Requirement of OSH management system
standards:
– MS 1722:2011,
– OHSAS 18001:2007
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment Should Be
Carried Out For:
• Routine and non-routine activities including
emergencies;

• Activities of all personnel having access to the


workplace (including subcontractors visitors and
others involved in or affected by);

• Facilities at the workplace, whether


provided-by the organization or others.

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When to Carry Out
Risk Assessment

• Before Operation

• During Operation

• After Operation

11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When to Review
Risk Assessment

• Types of review:
– initial review, and
– periodic review.

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When to Review
Risk Assessment
• Review whenever there are changes:
– internal
• Before modification, changes or introduction
of new
– Materials, machinery or processes, working
procedures,
– external
• Amendments of national laws and regulations
• Developments in OSH knowledge and
technology
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Will Carry Out
Risk Assessment
• Person or persons trained to identify hazard
and risk assessment
– In some cases legally competent person,
example : Chemical Health Risk Assessor

• Consultation with and involvement of


workers
– Safety and Health committee OR workers and
their representatives

• Involvement of supervisors

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Components of
Risk Management
• Hazard Identification

• Risk Assessment

• Risk Control

• Review
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Process of
Risk Management
Start
Classify Activities
(Work, Product, Services, Activities)

Identify Hazards

Determine Risk Risk = Severity X Likelihood

Decide if Risk is Tolerable


Decide if Impact is Significant

Risk Control Action Plan

Review Adequacy of Risk Control


16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazard Identification

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
SOURCES OF HAZARDS
Man Unsafe acts
Machinery Installation, layout and design of
equipment
Materials Substances such as chemicals
and gases used in the workplace
Method The way people carry out their
work
Media Workplace condition i.e. air
quality, ventilation, lighting, noise,
vibration etc.

18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Classification and
Potential Sources of Hazards
Classification of Example of Potential Sources of Hazards
Hazards
Mechanical Pinch points, sharp points and edges,
overload or force a tool beyond its
capabilities and grinding wheel without
guard
Electrical Electrical cord insulation damaged,
electrical face plate or cover broken or
missing and fan cord insulation pulled
loose
Biological Exposed to airborne and blood borne
viruses, bacteria and fungus

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Classification and
Potential Sources of Hazards
Classification of Example of Potential Sources of Hazards
Hazards
Chemical Exposed to carcinogens chemicals,
sensitizers and corrosive chemicals
Ergonomics Repeated exposure to unnatural
postures and unnatural movement,
awkward design of workstation, tools
and task
Psychological Stress, sexual harassment and violent at
work

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Pre-Assessment –
Information Gathering
• Information on the facilities, processes and
activities of the organization, including:
– Area Map
– Site plan(s); own and neighbour
– Process flow-charts
– Inventory of materials (raw materials, chemicals,
wastes, products, sub-products)
– Toxicology and other health and safety data
– Monitoring data

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Pre-Assessment –
Classifying Work Activities
• Geographical areas within/outside the
premises;
• Stages in a production process, or in the
provision of a service;
• Defined the tasks (e.g. driving, window
cleaning);
• Identify the working groups;
• Land use; previous property use, future use.

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Methods of
Identifying Hazards
• Review of documents and publications
• Inspection and observation at the
workplace
• Measurement of the atmosphere,
monitoring the environment or medical
surveillance of workers
• Hazard Analysis

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Document Review
• Reports of accidents, accident
investigation and audits

• Information from publications


– Acts, Regulations, Guidelines and Codes of
Practice
– Statistics
– Handbooks
– Chemical Safety Data Sheet (CSDS)

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection and Observation
• Types of inspections: statutory inspection,
periodic inspection, formal and informal
inspection

• Documentation - Checklist and inspection


worksheet (standard approach and record)

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection and Observation
• Activities - to involve supervisors, managers
and employees

• Inspection outcome - to include actions and


timeframes

• Ensure follow up on action - to ensure


effectiveness

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Exposure Monitoring
• Types of monitoring: area and personal
monitoring

• Monitoring of:
– Noise
– Heat
– Radiation
– Air contaminants
– Chemicals etc.

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Biological Monitoring
• Biological monitoring is a regular measuring
activity where selected validated indicators
of the uptake of toxic substances in the
human body are determined in order to
prevent health impairment

• This form of monitoring could entail


examination of, for example, blood, urine,
saliva and contaminated air

28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Biological Monitoring

• Biological monitoring commonly features


in the health or medical surveillance of
persons exposed to hazardous
environments especially complying to
legal requirement i.e. USECHH
Regulations 2000 etc.

29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Medical Surveillance

• Health Surveillance is Warranted if:


– Substance is used in workplace

– Substance is hazardous

– Evidence or reason to suspect injury

– Insufficient atmospheric monitoring

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazards Analysis

• Method use: (example)


– Job Safety Analysis (JSA)

– Hazards and Operability Studies (HAZOP)

– Fault Tree Analysis etc.

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Job Safety Analysis (JSA)

• Identify job to be done

• Task described in less than 10 steps

• Action verb used to describe job

• List things that can go wrong

32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Job Safety Analysis (JSA)
• Note:
– The term JSA includes the formulation of safe work
procedures using written instructions for workers

– May still require other risk controls

– Supervisor and workers assist

– Ideally all jobs should have a JSA (mainly high risk


jobs)

33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazards And Operability Studies
(HAZOP)
• To identify and evaluate safety hazards in
the process plant
• To identify operability problems
• New design or process
• Multidisciplinary brainstorming
• “What If” questionnaire method
• Focus on fire, explosion, toxic release etc.

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fault Tree Analysis
• To analyse how and why incident could
occur
• Graphic technique - traces branches of
events
• To calculate probability of end event
• Example: Water pumping system

35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fault Tree Analysis
No Flow (T)

Pump failure Control valve (C)


failure to regulate
flow of water through
pump

Pump failure (A) Pump failure (B)


(automatic
standby pump)

•No water flow occurs if both pumps fail or if the control valve fails.
•If the individual initiating event probabilities P(A), P(B), and P(C) are
known, then the probability of P(T) the top or end event can be
calculated.

36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment

37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Risk Assessment

Approach:

• Qualitative Risk Assessment

• Semi-Quantitative Risk Assessment

• Quantitative Risk Assessment

38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determining Severity

• Severity in terms of:

– Harm to health
– Damage to property
– Damage to environment
– Or the combination of the above

39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Severity
Determine severity categories i.e.:
• Fatality

• Major injuries (normally irreversible injury or


damage to health)

• Minor injuries (normally reversible injury or


damage to health requiring days off work)

• Negligible injuries (first aid)

40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determining Likelihood of
Occurrence of Hazard
• Based on statistic & data, professional
judgement
• Determine likelihood categories i.e.:
– very unlikely,
– likely,
– unlikely,
– highly unlike.

41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Likelihood
• Very likely - could happen frequently

• Likely - could happen occasionally

• Unlikely - could happen, but only rarely

• Highly unlikely - could happen, but


probably never will

42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Qualitative Risk Table
Severity Likelihood
Very Likely Likely Unlikely Highly Unlikely
Fatality High High High Medium
Major Injuries High High Medium Medium
Minor Injuries High Medium Medium Low
Negligible Injuries Medium Medium Low Low

43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Semi - Quantitative
Risk Assessment
Determine severity categories i.e. :
• 4: Fatality & Permanent Disability

• 3: More than 4 days MC

• 2: Less than or 4 days MC

• 1: First aid and near misses

44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Semi - Quantitative
Risk Assessment
Determining Likelihood of Occurrence of
Hazard

• 4: Daily

• 3: Weekly

• 2: Monthly

• 1: Yearly

45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Semi-Quantitative
Risk Assessment
LIKELIHOOD
Yearly Monthly Weekly Daily
1 2 3 4
First Aid
1 2 3 4
SEVERITY

and Near 1
Misses
Less than
or 4 days 2 2 4 6 8
MC
More than
4 days MC
3 3 6 9 12
Fatality &
Permanent 4 4 8 12 16
Disability

46 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment
• Where the hazards presented by the
undertaking are numerous and complex,
and may involve novel processes, for
example in the case of large chemicals
process plants, detailed and sophisticated
risk assessments will be needed, and it is
appropriate to carry out a detailed
quantitative risk assessment

47 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment

• Quantitative risk assessment involves


obtaining a numerical estimate of the risk
from a quantitative consideration of event
probabilities and consequences

48 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment

• In carrying out quantitative risk assessments,


special quantitative tools and techniques will
be used for hazard identification, and to
estimate the severity of the consequences
and the likelihood of realization of the
hazards

49 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment
• Where such methods and techniques are
used it is important that they are carried out
by suitably qualified and experience
assessors

50 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Decision for Action
AS LOW AS REASONABLY PRACTICABLE (ALARP)
PRINCIPLE

Risk cannot be Intolerable (e.g. H,H or >10)


justified
on any grounds LEVEL
TOLERABLE IF:
A Risk is undertaken if OF Reduction
a benefit is desired
L Impractical
 RISK or
A Reduce risk Cost / gain grossly
R Disproportionate
P No need for
detailed
action
Trivial
51 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment Form
Risk
Activities / process / facilities/ Current Risk Legal
Hazard Effect Action & Recommendations
equipment Control Reqmt Risk
Severity. Likelihood.
Rating

52 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Control

53 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principle of Control

•Substitution •Housekeeping •Training and


•Modify process •General education
•Enclosure ventilation •Worker rotation
•Local exhaust •Continuous area •Enclosure of
•Fugitive monitoring worker
emission control •Dilution •Personal
•Isolation ventilation monitoring
•Automation or •Personal
remote control protective devices

54 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Consideration in Implementing
Risk Control
• Review measures regularly; modify if
necessary

• Comply with national laws and regulations

• Reflect good management practice; and

55 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Consideration in Implementing
Risk Control

• Consider the current state of knowledge

• Include information or reports from


organizations such as:
– DOSH, OSH services, and others.

56 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hierarchy of Control
MOST EFFECTIVE
Elimination - remove the hazard

FAIRLY EFFECTIVE
Substitution - use less hazardous one.
Isolation – isolate the work area i.e. X-ray machine in restricted
room
Engineering Control – design, isolation at source, barricade,
guarding,

LEAST EFFECTIVE
Administrative Control – safe work procedure, isolation i.e. reduce
exposure time and limit, training, signage etc
PPE - last resort.

57 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• The basis of OSH management is the
identification of hazard, risk assessment and risk
control
• Ways of identifying hazards varies from
inspection of the workplace to reviewing
legislation
• Risk assessment allows an organisation to build
a sound basis for managing hazard
• Hierarchy of hazard control starts by elimination;
usage of PPE for protection as the last resort

58 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Personal Protective
Equipment (PPE)

Safety and Health Officer


Certificate Course

1
Learning Objectives
• To define what is personal protective
equipment
• To state the position of PPE in the
hierarchy of hazard control
• To describe the management and
legal issues of PPE
• To select appropriate body
protection equipments
• To demonstrate the PPE equipments
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Introduction to PPE
• Body protection
• Respiratory Protection
• Special Work Clothing
• Introducing PPE to Workplace

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Personal Protective
Equipment?
• Devices and garments to protect
workers from injuries.

• Designed to protect
– Eyes, Face, Head, Ears, Feet, Hands and
Arms, Respiratory System and Whole body.

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Personal Protective
Equipment?
PPE includes
– Goggles, Face shields, Safety glasses,
Hard hats, Safety shoes, Gloves, Vests,
Respirators, Earplugs and Earmuffs.

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
PPE
PPE SHOULD BE A HAZARD PROTECTION
OF LAST RESORT
– Not to be used permanently as a substitute
for maintaining a safe and healthy work
environment
– Use only when the work environment cannot
be made safer
E.g. through hazard elimination engineering,
administration or by limiting work exposure

6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Problems with PPE
• If PPE is used as the first option without
reducing hazard at source:
– Risk to workers if PPE fails and failure not
detected.
– Cause employees to believe they are "safe" and
may take higher risks.
– Result in worse consequences if people fail or
forget to wear equipment.
– Will shift the responsibility for safe working
condition from the employer to the employee.

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Protect From?
Any insult to the external (surface) or
internal part of the body:
• Impact (e.g. flying & falling objects, knocks
& bumps)
• Chemicals hazardous to health (gases and
liquid)
• Radiation (IR & NIR) (e.g. heat, high
intensity light, noise)

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Protect From?

• Dust (e.g. mineral dust)

• Wet (e.g. slip)

• Sharp objects

• Falling from heights

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Considerations in the
Selection of PPE
• Selection of PPE is dependent on the
hazard identification, risk assessment
and control measures implemented

• PPE is used to
complement/combination of other
control measure

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Considerations in the
Selection Of PPE
• PPE selected must be carried out
under a PPE programme
• PPE must be certified products to
ensure acceptable level of protection
from hazards
• Limitations of PPE must be identified
adhered to
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Ensuring Employee
Compliance
• Make it easy for employee to comply
• Factors to consider:
– Understand the necessity to wear the PPE
– Easy and comfortable with minimum
interference to work
– Pre-purchase employee feedback on
equipment
– Psychological: employee vanity, virility
– Incentives and disincentives on wearing the PPE
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training on PPE
• Hazard recognition in the work
environment

• What control measures can be taken

• The type of PPE suitable for use

• The limitations of PPE

• Demonstration of correct use


13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training on PPE

• Practicing using the PPE

• Cleaning, maintaining and repairing


PPE

• Use of PPE in dealing with


emergencies

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
PPE IS PERSONAL!
Fit
– PPE must be properly fitted to ensure
reliable protection.

Care
– Issued on a personal basis.
– Individuals responsible for the day to
day use, handling, cleaning, storage
and maintenance, reporting of
defects.
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
MULTIPLE USER PPE
• Should be correctly used, handled,
stored, cared for and maintained.
• Appropriate procedures on suitable
cleaning and sterilisation must be
provided.
• Above must be observed at all
times.

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements
Factories and Machinery (Safety,
Health and Welfare Regulation), 1970
– Regulation 32

• Clothing
• Safety helmets
• Gloves
• Eye protection

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements

OSHA1994: USECHH Regulations 2000


– PART V - Action to Control Exposure
• Reg.16(1) Approved personal protective
equipment shall be used

18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Face and Eye Protection

• Goggles, spectacles and face shields


are used for protection from injury by:

– Physical (flying or falling objects)


– Chemical agents
– Radiation

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Face and Eye Protection

• Has the widest use and the widest


range of styles, models and types

• Face shields must be used in


combination with basic eye protection

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Head Protection
Helmets and Bump Caps
Protective helmets are intended to:
– Protect the head from the force of
impact of falling objects or from electric
shock
– Shield the head and hair from
entanglement in machinery or exposure
to environments

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Head Protection
Helmets and Bump Caps
Examples:

– Construction work, logging, mining, metal


or chemical production, congested multi-
storied process area or areas with low
slung pipes or headroom, etc.

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Headwear Care and
Maintenance
• Helmets should be inspected for cracks
(even hairline cracks), signs of impact or
rough treatment, and wear before use.
• Prolonged exposure to ultraviolet rays
(sunlight) and chemicals can shorten the life
span expectancy of thermoplastic helmets.
• Solvents can damage the shell. Be careful
when using them for cleaning.

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hands and Arms
Gloves, Gauntlets, Mitts, Wrist Cuffs, Armlets

Hazards
– Abrasion; temperature extremes; cuts
and punctures; impact; chemicals;
electric shock; skin irritation, disease or
contamination; vibration; risk of product
contamination.

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hands and Arms
Gloves, Gauntlets, Mitts, Wrist Cuffs, Armlets

Materials
– Leather Abrasion protection, heat
resistance
– PVC Abrasion protection, water
and limited chemical
resistance
– Rubber Degreasing, paint spraying
– Cloth/nylon Hand grip
– Latex Electrical insulation work

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Protective Footwear
Protection for Feet and Toes
Options
– Safety boots and shoes with steel toe
caps, gaiters, leggings, spats and clogs.
conductive shoe.

Patterns
– Anti-slip, anti-static, electrically
conductive or insulating.

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Protective Footwear
Protection for Feet and Toes

Hazards

– Wet, electrostatic build-up; cuts and


punctures; falling objects, heavy loads;
metal and chemical splash; vehicles.

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fall Protection Systems
Personal lifelines
• Body support

• Lifelines

• Construction of body support

• Inspection and testing


28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hearing Protection
Ear muffs, Ear plugs, Helmets

Hazard

– Machining, grinding, pneumatic


equipment, rock drilling, piling work,
hammering, generators, ventilation fans,
motors, punch and brake presses.

29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hearing Protection
Ear muffs, Ear plugs, Helmets
Selection of hearing protection
(i) The characteristics of the noise
(ii) Frequency of exposure
(iii) Comfort of the user
(iv) Communication needs
(vi) Medical conditions

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Respiratory Protection
• A respirator is a protective face piece,
hood or helmet.

• Designed to protect the wearer against:


– To protect employees from breathing
contaminated and / or
– Protection against particulates, vapours,
– Oxygen-deficient air
– Or combination of all the above

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Kinds of Respirators

Air-purifying Respirators

– Have filters, cartridges, or canisters


that remove contaminants from the air
– Types: Particulate, Gas & Vapour,
Combination

32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Kinds of Respirators

Atmosphere-supplying Respirators

– Supply clean air directly to the user from


a source other than the air surrounding
the user
– Types: Air-Supplied, Combination, Self-
Contained Breathing Apparatus

33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Selection and Fitting of
Respirators
Selection depends on
(a) The contaminant
(b) Task
(c) Operator

Protection factors depends on


(i) Face mask (1/2 face, full face)
(ii) Filter efficiency (particulates)

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Selection and Fitting of
Respirators
Fit testing important

– Individual variation

– Determines the level of protection

35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Problems with Respirators
• Good only if properly fitted and worn
• Protect only those who are wearing
them
• Uncomfortable, cumbersome and
interfere with communication
• Costs are substantial require
– Regular medical examinations, fit testing,
training, and the proper purchasing of
equipment
– Maintenance and storage
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Special Work Clothing
• Selection factors

• Materials:
– Impervious clothing
– Protection against heat, flame and
hot metal
– Others

37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Introducing of PPE to
Workplace
If PPE is to be used, then:
– Write in the OSH policy on usage of PPE and
communicate it to employees and visitors
– Select the proper type of PPE
– Implement a thorough training programme/
demonstrate proper use
– Make certain the employees know the correct
use and maintenance of the equipment
– Enforce its use

38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• PPE is protection of last resort.
• PPE should be selected appropriately.
• PPE use is required by law in some
situations.
• Employees must be consulted, trained,
supervised in the use of PPE and must
be aware of hazards.
• PPE must be properly fitted, tested,
cleansed, maintained and stored.
• Comfortable PPE will ensures its use.
39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Objective &
Programme

Safety and Health Officer


Certificate Course

1
Learning Objectives
• To list 4 purposes of OSH Programme

• To identify the needs of OSH


Programme

• To develop the action plan for the


OSH Programme

• To distinguish responsibilities of top


management, line management and
supervisors in the implementation of
OSH Programme
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
1. Planning an OSH programme
2. Responsibilities in the
implementation of OSH
programme
3. OSH programmes in an
organisation
4. Procedures and system of work
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Creating OSH Policy,
Organisation and Arrangements
• OSHA 1994 requires to have written policy,
organisation and arrangements
• Purpose of OSH programme is to ensure:
– Implementing the goals of OSH policy
– Minimum compliance with national laws and
regulations
– Good operation of the organisation’s OSH
management system
– Continual improvement in OSH performance

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Planning an OSH Programme
• Begin with:
1. Goals of the organisation written in the
policy
2. Legal and other requirements
3. Identified hazard and risks
• Prioritise the needs of these requirements
and set objectives and target for the
organisation to achieve
• Set objectives and targets
• Create action plans with timelines and
responsibilities for completion
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Plan for Legal and Other
Obligations
1. Identify legal requirements:
 Identify which regulation applies e.g.
– SHO Regulations 1997, SHC Regulations
1996, CIMAH Regulations 1996, USECHH
Regulations 2000

– Codes of practice or guidelines


• Identify other requirements e.g.
 e.g. “Responsible Care”
 Implement all above requirements
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Plan for
OSH Arrangements
• Get management commitment

• Design plans based on objectives


and targets

• Arrange for resources (human,


financial and technical support)

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Plan for
OSH Arrangements
• Identify how to measure success of the
programme (performance indicators)

• Assign responsibilities for each programme

• Communicate these requirements to


managers and supervisors concerned

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes
• General responsibility
– Top Management
• Overall responsibility
• Provide resources to implement the policy

– Line Management and Supervisors


• Day-to-day programme tasks and
responsibilities

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes

– Employee
• To cooperate
• Obey rules and regulations
• Reporting
• Involvement in consultations

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes

• Line Management Responsibilities


– Ensuring that OSH is managed within their
area of operations
• Include arrangements to resolve any conflict
between OSH issues and productivity by
escalation to higher management.

11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes

• Specific responsibilities (preferably written in their job


descriptions):
– Those managing contractors
– Those responsible for OSH training
– Those responsible for plant and
equipment
– OSH specialists: industrial hygiene,
investigators & auditors, SHO, etc.

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes

• Information, instruction, training:


– OSH promotion
– Awareness programme
– Training / induction and other training
– Signs and labels
– Tool box meeting
– Communicating and consultation

13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• The provision of systems of work:
– Procedures, training and supervision
• Include procedures for contractors and visitors

– First Aid

– Emergency preparedness
• Including evacuation drill and emergency
exercises
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• Arrangements for use or operation,
handling, storage and transport of
plant and substances:
– Assessment
– Hazard / accident reporting
– PPE
– Showers

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• Provision of facilities for welfare of
employees:
– Cafeteria
– Showers
– Toilets

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• Implementing Risk Control:
– Prioritises risk reduction programme
according to the hierarchy of control
– Establish “System Of Work” if administrative
control measures are required
– Inform and train affected employees before
Implementation of control measures
– Information and training is important
especially when there is a "decision to
change"

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
• A formal procedure to minimise
remaining risks
EXAMPLES WHERE REQUIRED, IN
PARTICULAR,
– Cleaning and maintenance operations,
– Working alone.
– Breakdowns.
– Emergencies.

• Should have safe working procedures for


all jobs.
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work

• Implementing
– Identify required safe working procedure.
– Write safe work instructions
– Provide training
– Ensure supervision
– Monitor effectiveness of control measures
and act accordingly

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
Permit-To-Work Required
• Electrical work, especially at higher
voltages
• Entry into confined spaces e.g. vessels
• Excavation work or demolition activities
• Presence or possible release of
– Ionising radiation, or flammable gases, liquid
or dusts (possible risk of ignition by hot work,
electrical or electrostatic sources)
• Lone working in hazardous environments
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
Permit-To-Work
• Documentation:
– Written authority, e.g. to carry out
maintenance in a confined space
– Issued by authorised person
– States job risk has been assessed
– Details safety precautions
– Authorises the work
– Permanent record of precautions taken
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
Permit-To-Work

• Training and supervision very


important
• Audit

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work –
Lone Working

• May include the “Buddy System”:


(a) Challenge-check system. (e.g. aircraft
checklists)
(b) Lifeguard system. (e.g. jobs requiring
lifelines and special protective gear)
(c) Two-person system. (e.g. in electrical
substation operations)

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Importance of Human
Factors
• Human factors can lead to accidents:
– General health and fitness
– Complacency
– Fatigue, Boredom
– Rushing (cutting corners)
– Panic in emergencies
– Over eagerness (not following procedures)
– Inter-group relationships

• Build in fail-safe mechanism or remove the


risk
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Programmes must be established to
accomplish goals policies and
objectives.

• OSH programmes must be specific,


has datelines, assignment of
responsibilities, performance
indicators and resources.

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• All levels of management must be
responsible for managing
occupational safety and health in the
workplace.

• System of work including “work


permits” is important in certain
categories of work
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergency
Preparedness and
Response
Safety and Health Officer
Certificate Course

1
Learning Objectives
• To define what is an emergency

• To describe why prepare for an emergency

• To determine the stages of an emergency

• To identify the elements of emergency


programme for preparedness, response and
recovery

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Recognising an emergency
• Emergency management
• Emergency planning
• Emergency mitigation and resources
• Procedures
• Incident control and facilities
• Training & exercises
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Emergency
• Accident – unexpected event which cause
damage @ harm. Happens by chance

• Emergency – an unforeseen combination of


circumstances @ the resulting state that
calls for immediate action

• Disaster – a sudden calamitous event


bringing great damage, loss @ destruction

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Tiram Kimia Tragedy

6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Prepare for an
Emergency
• There are unaccounted,
unplanned & unexpected event

• Accidents happen at any time and


emergency situation is chaotic

• Emergency often escalates to crisis

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Prepare for an
Emergency
• Regulatory and Industry requirement –
e.g. CIMAH Regulations 1996,
“Responsible care” OHSAS 18001, ISO
14000, etc.

• Communities are affected by


emergencies

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Stages of an Emergency
1st Emergency Level
Trigger
escalation? End of
incident emergency
trigger
minutes hours days months

PRE-EMERGENCY EMERGENCY

RECOVERY
EMERGENCY
LEVELS
Time
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Emergencies
• Depends on severity of the incident and
capability of the organisation

• Level 1
If within the capabilities of the organisation

• Level 2
If external assistance is required: mutual
aid, district or other agencies. MKN
Arahan 20 may apply.

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Emergencies
• Level 3
State or National Disaster. MKN Arahan 20
takes over.

11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Goals of Emergency
Response
– Control, Reduce or stop the cause

– Control situation and limit secondary


damage

– Continue operations and recover quickly

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Objectives of Emergency
Response
– Save lifes
• Prioritise Rescue and First Aid
• Rescuers must not be put to risk

– Save property, asset and reputation

– Save Community and the Environment

13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Elements of
Emergency Preparedness
and Response Management
1: Organise emergency management team
2: Identify the accident scenarios and emergency
consequences
3: Identify resources, equipment and facilities
4: Develop plans and procedures
5: Train, drill and exercise
6: Review system
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Emergency Management
Organisations
Emergency
Management
Commitment

 Emergency  Emergency Incident


Co-ordinator Management Command
Committee Organisation
- To coordinate planning -Take control during incident
-To plan for
-Mitigation -- Functions:
-Preparedness -Command
-Response -Operations
-Recovery -Planning
-Logistics
-Admin/Finance
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Emergency Management
Coordinator and Tasks

Emergency Management Coordinator


– Administer and keep current the
emergency management programme
– Work with Emergency Management
Committee

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Emergency Management
Coordinator and Tasks
Emergency Management Committee
– Ensure preparation, implementation and
evaluation of EPR
– Work with coordinator

Membership –Technical & Non-


Technical

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Incident Command Organization
(Based on Incident Command System)
Incident
Commander

Operations Planning Logistics Administration


•Damage •Situation •Communications •Legal
Control (Fire Analysis •HR •Procurement
Fighting, etc.)
•Records •ECC •Recovery
•Rescue
•Documents •First Aid
•Evacuation
•Strategy •Transport
•Traffic
Control •IT
National Inter-Agency Incident Management System
Used by FEMA and included in NFPA 1600:2000
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Task of the Incident
Organization
• Identifies level of emergency response

• Coordinates response action,


evacuation, continuity and recovery
activities

• Ensure outside assistance are notified or


called upon
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Task of the Incident
Organization
• Work with external agencies

• Complies with applicable statutes or


regulations

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Incident Command
Operations Teams
• Depends on the organisation, activities and
products. For example:
– Most organisations will need a team of :
• Fire fighters
• Evacuation rescuers
• First Aiders
– Hazardous chemical plants:
• Chemical or oil spill team
– Process plant:
• Shut down team
• Rescue team
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Emergency Planning
Threat and hazard identification
– Use imagination; think of the unexpected

Assessment of emergency scenario


– Also impacts beyond control such as:
o Regional communications loss and national power
outage
o transportation disruptions (floods, broken bridges)

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Emergency Planning
Plan For Emergency Mitigation,
Preparedness, Response And Recovery

23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Types of Potential Hazards
Natural events
– Storms, earthquakes, floods, etc.

Technological events
– Mechanical problems (ruptured
pipes, metal fatigue), chemical spills,
aircraft crash, fire, explosion, etc.

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Types of Potential Hazards

Human events
– The wrong valve was opened,
miscommunication about what to do,
etc.
– Sabotage, terrorism

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Other Hazard
Considerations
• Quantity of hazardous materials
• Location of hazardous materials
• Location of isolation valves
• Special fire fighting requirements
(oil, chemical) if any
• Special handling requirements
(e.g. radio-active, pathogens)

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Hazard Consequence Analysis –
For Emergency And Recovery Plans
• What hazards are most likely to occur
• What functions or services are affected
• In what way the functions could not be
performed following a disaster
• What are the critical functions
• What actions will protect them
• What functions has to be restored quickly

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Potential Impacts of
Hazards

Health, Safety and Environment


– Persons in the affected area
– Personnel responding to the incident
– Pollution to the environment

28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Potential Impacts of
Hazards
Legal
– Regulatory and contractual obligations

Business
– Continuity of operations and delivery of services
– Property, facilities, and infrastructure loss
– Reputation of the organisation
– Economic and financial condition

29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Emergency Plans Must
Comply With Legal and Other
Requirements
Examples of requirements are:
– OSHA 1994
– CIMAH Regulations 1996
– Environmental Quality Act 1974
– Voluntary Standards
• Disaster/ Emergency Management Standard (Incident
Command System, FPA 1600:2000)
– Industry Practice
• “Responsible Care”

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Emergency Plan Strategy
• Emergency plans should be capable of
dealing with the worst case credible
scenario

• However, detailed planning should


concentrate on the more likely events

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Emergency Plan Strategy
• Plans should also be sufficiently flexible to
ensure that an emergency response can be
varied according to the severity of the
incident

32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Recovery Strategy
• Objective is to restore functions as
early as possible

• Redundancy or alternatives arranged


for identified critical functions
– Alternative site, supplier arrangements

33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Recovery Strategy

• Roles and responsibilities for


restoration identified
– e.g. recovery manager and team,
communications, utilities, purchasing, HR,
site security

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Mitigation Measures
• Interim and long-term - to eliminate or
reduce impact of hazards that cannot be
eliminated.
– Access, escape routes and shelters
– Early Warning - Establishment of hazard warning
and communication procedures
– Materials – removal, reduction, modification,
segregation or elimination
– Heat, fluids, etc. - protective systems,
redundancy, control of rate of release
– Structures - building construction standards

35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Resource Planning
• Based on identified threats and hazards
– Fire, flood, explosion, spills, collapse

• Existing internal and external resources

• Identify resource shortfalls and alternate


sources

36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Resource Planning

• Consideration for mutual aid agreements

• Arrangements with vendors and suppliers

37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Identify for Each Threat or
Hazard
Resources and logistics
– Personnel, training, expert knowledge,
materials
– Available in a timely manner and have the
capability to do its intended function
– Quantity, response time, operability

38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Identify for Each Threat or
Hazard
Equipment and Facilities
– Fire fighting, heavy equipment, medical supplies

Miscellaneous
– Food, clothing and shelter for evacuees, religious
personnel, volunteer and social/political groups

39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Emergency Facilities to
be Made Available
• Command posts
– Identified, equipped, tested, and maintained
– Operations manual

• Personal protection equipment list

40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Emergency Facilities to
be Made Available
• Where needed, toxic and explosive gas
detectors, wind indicators

• Resources from external sources


– At industrial facilities or agencies

41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Regular Tests of
Emergency Equipment and
Facilities
• Check and document alarm system
frequently

• Frequent tests of fire fighting equipment

42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Immediate Strategic
Plans
• Identification of vital personnel (core
team), systems, operations, and
equipment

• Priorities for restoration and mitigation

43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Immediate Strategic
Plans
• Acceptable downtime before restoration to
a minimum level

• Minimum resources needed to accomplish


the restoration

44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Plans
Written Plans
– Strategic
– Operations
– Mitigation
– Recovery plans

Roles and responsibilities


– Incident commander, recovery manager,
communications and public relations

Lines of authority

45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Procedures
• Alarms, call out and notification
• Communication - internal, authorities,
public
• Employees - escape, etc.
• Evacuation - community
• Coordination with other parties
• Recovery

46 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Emergency Operating
Manuals
• For reference during an emergency
• Who does what, information and data
• Balance between overview and detailed
response
• Need to know, nice to know
• Sound understanding enables flexibility
• Simple language

47 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Finance and
Administration
• The organization should also develop
financial and administrative procedures to
support the emergency management
programme before, during, and after an
emergency or a disaster.

48 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Finance and Administration

– Before – maintenance, drills and exercises,


alternate sites and equipment

– During – logistics, HRM, employee/victim


assistance, equipment, services

– After – recovery activities, repairs, clean-ups


and restoration, compensation, insurance

49 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Incident Procedures
• Control of access to the area

• Identification of personnel at the incident

• Accounting for personnel in incident


activities

50 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Incident Procedures

• Accounting for persons affected, displaced,


or injured by the emergency

• Mobilisation and demobilisation of


resources

51 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Disaster Recovery
Activities
• On-site damage assessment and
purchasing

• Employee/victim assistance (financial,


medical and psychological)

• Incident investigation

52 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Disaster Recovery
Activities
• Clean-up and restoration

• Restoring safety and emergency systems

• Legal, insurance and financing (expedited)

• Public information and communication

53 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Training

Familiarisation
– Manual Familiarisation, Specific Courses
(chemical fire, rescue, decontamination,
Media etc), Exercise Observer

54 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Training

Personal readiness
– Know the fundamental Role
– Know your way around the manual
– Have your personal aids ready
– Know the early actions well
– Ensure alternate is ready

55 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Exercises and Drills
Types and subjects
– Types: Simulated, “Real”
– Subjects: Operational, Security, Commercial

Preparation for exercise


– Scenarios, Timing of events, Roles (including
media) and Resources
– Secret but forewarn other parties (outside
agencies) as necessary

Drills
– Evacuation
56 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Evaluation
• Plan should be reviewed annually and
updated as necessary

• Be re-evaluated when:
– There are changes:
• Regulatory, New hazards are identified or existing
hazards change
• Resources or organizational structure change
– After tests, drills, or exercises
– After disaster responses
– Infrastructure changes
57 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Organise emergency management
team
• Identify the accident scenarios and
emergency consequences
• Identify resources, equipment and
facilities
• Develop plans and procedures
• Train, drill and exercise
• Review system

58 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First Aid

Safety And Health Officer


Certificate Course
Learning Objectives

• To define what is first aid


• To state the purpose of first aid at
workplace
• To describe 3 principles of first aid
• To explain the requirement under
the first aid guideline by DOSH
• To explain 3 levels of first aid training

2 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Reasons for providing First-Aid

• Planning for First-Aid

• First-Aid facilities

• Training

3 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Is First-Aid

First aid is "the immediate and


temporary care of the victim of an
accident, with the aim of preventing
or reducing an acute threat to the life
or health of the victim".
– International Labour Organisation

4 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Aims of First-Aid are to:
• Preserve life
• Stop the condition becoming worse
• Protect the unconscious
• Promote recovery and
• Relieve pain and suffering
• Compliance with Factory and Machinery
(Safety, Health and Welfare) Regulations
1970 (Reg. 38) and OSHA 1994 (Section 15(1)

5 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Needs First-Aid
A person who:
– Requires immediate attention
– Whose injury would not need treatment by
a medical practitioner or nurse
– Minor injuries who would otherwise
receive no treatment
Note:
All injuries however minor should be treated,
otherwise it might lead to infections leading to
lost time illnesses.

6 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Response

• Get help immediately. Speed is essential.


Minutes can save lives

• First-Aider assess situation without


endangering self

• Identify injury or injuries

7 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Response

• In cases of multiple casualties prioritise


treatment

• Keep records of treatments

8 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles Of First-Aid

IDENTIFICATION

• What kind of injuries or diseases anticipated

9 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles Of First-Aid

ASSESSMENT
• The type of work being carried out and its
level of hazard
• Work away from the employer's premises.
• Consequences
• Availability of other places of treatment (are
there hospitals nearby?)

10 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles Of First-Aid

CONTROL
• Provision of first aid facilities and services

11 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Worker Exposure

• The duties of first aiders should be analysed


as part of the hazard management process

• Identify hazards from


– Manual handling
– Infection control

12 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level of Preparation –
Depends On Risk
• Planning is important for high risk places of work, such as:
– Workplaces which use or manufacture hazardous
substances
– Workplaces where hazardous processes may be used
(e.g.abrasive blasting);
– Construction sites;
– Where heat is used as part of any process (e.g.
working in foundries or welding and cutting); and
– Workplaces which require people to work in remote
isolated areas (e.g. agricultural or transport industry).

13 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level of Preparation –
Depends On Risk
• If has potential for mass casualties provide:
– Safe place for evacuation
– Equipment e.g. stretchers, wheelchairs, etc.
• For hazardous substances and poisons
– Procedures, training and PPE for handling
• Antidotes in first-aid box, e.g. for cyanide and
procedure for using it, if necessary
– To be administered only by trained first aider

14 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A First-Aid Program
• Properly trained and designated first-aid
personnel on every shift,

• First-aid kit, supplies and room,

• A first-aid manual,

• Posted instructions for calling a physician and


notifying the hospital that the patient is reroute,

15 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A First-Aid Program

• Posted method for transporting ill or injured


employees and instructions for calling an
ambulance or rescue squad and

• An adequate first-aid record system

16 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration

• For all workplaces


– Communications – for quick response
– Rescue and evacuation

17 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
• Plan first-aid in conjunction with the
emergency response plan. (Especially for
major hazard facilities (MHF)

• If there are many employers in the same


workplace, therefore the principal employer
is responsible

18 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
Matters to be determined having identified
hazards and assessed the risks at the
workplace are:
• The number and location of first aid box
• Their contents
• The number of employees to be trained in
first aid
• The level of training
• Possible need for a first aid room and
equipment it should contain
19 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
• Number of first aider
•The numbers of employees.
•The distribution of employees
•Number of shifts
•The nature of the work (type of industry)
•The size and location of the workplace
•The distance from outside medical
services
20 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration

• Selection of first aiders

• Appointment of a person in low risk


situations (office)

21 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Boxes

• Sturdy, portable and readily accessible -


mobile employees also to be considered

• Names of First Aiders / emergency services


on or near to box

• CPR instructions in / or near box

22 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Boxes
• Place of work injury instructions in or near to
box

• Content is dependent on the type of


services required

• Headaches and colds medicine may not be


included

23 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Boxes
• List content and its quantity to facilitate
replenishment

• Employer is responsible. First Aider to assist


replenishing contents

• There is often a difference of opinion regarding


proper treatment, first-aid procedures
– Should specify the type of medication, if any,
to be used on minor injuries, such as cuts and
burns
24 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Equipment

• In areas where chemicals are stored,


handled, or used provide:

– Emergency flood showers


– Low pressure eye-wash fountains

25 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Room
• When more than 150 employees

• Enough to place a couch and people to


move around

• Identified, private, well lit (including


emergency lighting), ventilated and
temperature controlled

26 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Room

• Access for wheelchair/stretcher

• Easy access to work areas and toilets

• Easy to clean

27 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Stretchers

• Keep near places of serious hazards

• Keep clean and ready for use at all times

• Keep in cabinets that are clearly marked


and properly located

28 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Stretchers

• Protected against mechanical damage


and destructive vapours or fumes, dust, etc.

• Tested periodically if made of materials that


will deteriorate

29 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training For All Employees
• Location of first aid boxes/rooms

• Names, location, contact numbers of First


Aiders

• First aid procedures

• Universal precautions

30 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First Aid Training
LEVEL I
– BASIC FIRST AID (emergency first aid procedures).
LEVEL 2
– WORKPLACE FIRST AID (Level I plus treatment of
injuries and illnesses, eg heart attack, fainting).
LEVEL 3
– OCCUPATIONAL FIRST AID - (Level 2 plus broad
understanding of hazards, emergency care &
assessment)

• Use approved training provider

31 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• First-aid is for preserving life and preventing
conditions of accident victims from
worsening

• Assess hazards in the workplace before first-


aid services and programmes are identified

32 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• First-aid programme consists of:

– Identification of First Aiders and training of


employees
– Provision of first-aid boxes
– First-aid room, stretchers, showers and
eyewash if necessary

33 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Procurement And
Contractor
Management
Safety and Health Officer
Certificate Course

1
Learning Objectives

• To describe 7 steps of procurement


and contractor management

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Procurement, leasing and contracting
• Contractors and why manage them
• Elements of procurement and contractor
management
Step 1 - Policies
Step 2 - Planning
Step 3 - Select contractor
Step 4 - Clarify contract
Step 5 - Orientation and training
Step 6 - Control of work activity
Step 7 - Post contract evaluation
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Manage Procurement

• Liability

– Procured equipment, installations or


materials could cause injuries and ill
health. (OSHA 1994, CIMAH Regulations
1996 and USECHH Regulations 2000)

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Manage Procurement
– Procured services (from contractors) is
equally important because OSHA 1994
defines contractor and subcontractor as
organisation’s own employee

– Responsibility for work at site cannot be


delegated to others (OSHA 1994 -
section18)

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 1:Procurement Policy
• Procedures for incorporating and evaluating
OSH into purchasing, leasing including pre-
qualification of contractor

• Inform suppliers and contractors of


requirements before procurement

• Fulfil requirements before use of substances,


equipment and before awarding contract

6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 2 : Procurement
Management Planning
• Ensure before commencing work and at all
stages of contracting
– Identify hazard and risks and inform contractor
(also include in tender document and priced)

• Procedure for reporting contractor for OSH


violation
• Ensure SHO is notified

7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 3: Evaluation of Contractor
Safety Performance

• Contractor selection based on:


– Review of the contractor's injury / illness
data for the last three years
– References, background checks
– Questionnaire

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 4 - Clarify Contract
(Pre-Mobilisation Meeting)
• Contractor prepare OSH plan
• With Contracting Officer, Project Officer,
and SHO
– Reviewing safety requirements
– Discussing implementation of all health and
safety provisions

• Complete pre-job OSH orientations and


training before being allowed to work

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 5 - Orientation and Training
• Safety orientation should include a review
of:
– General safety rules and regulations
– Emergency reporting and response procedures
– Work permit procedures
– Physical and chemicals hazards, on site (fire,
explosion, and toxic release type hazards)
– Other day-to-day issues

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 6 - Control of Work Activity
OSH Monitoring

• Compliance are enforced and monitored


(including inspections and auditing) and
evaluated

• Reporting requirement

• Must have on-site project manager (Site-


Supervisor)
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 7 – Close-out and Post
Contract Evaluation
• Organisation
– Analyse contractor OSH performance
– Register for future contracts

• Contractor
– Removal of all wastes, materials, tools and
equipment
– Site clean-up and restoration
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Incorporate OSH in procurement.
• Fulfil requirements before use of materials or
awarding contract (Pre-qualify contractors).
• Involve contractors in assessing risk of their
respective jobs and integrating them into
common safety management system.
• Enforce, coordinate, monitor and evaluate
arrangements.
• Keep register of contractors.

13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditing

Safety and Health Officer


Certificate Course

1
Learning Objectives

• To define what is OSH audit


• To differentiate between inspection,
investigation and auditing
• To describe 3 types of audit
• To explain principles of auditing
• To explain steps in audit process

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope

• Importance of auditing
• Differences between Inspection,
investigation and auditing
• Principles of auditing
• The audit activities
• Activities during an audit
• Preparing an audit report
• Concluding an audit

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Definition
• An OSH audit is a systematic, independent and
documented examination to determine whether
activities and related results conform to planned
arrangements and whether these arrangements
are suitable , effective and adequate implemented
effectively and are suitable for achieving the
organization's policy and objectives.

• Audit can be perform in many approach.


However, formal audit will be conducted based on
auditing guidelines (ISO 19011)

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Audit?
S • Systematic

I • Independence

D • Documented

Audit:
Systematic, independent and documented process for obtaining
audit evidence (3.3) and evaluating it objectively to determine the
extent to which the audit criteria (3.2) are fulfilled.
(Source: MS 1722: Part 1:2005)

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What we are looking in
Audit?

• Establish
Suitability Adequacy
• Document
Effectiveness
• Implement
• Maintain
• Continually Improve

6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditing is a Management Tool
• Originally applied to finance and
accounting to instill shareholder confidence
• It evaluates:
• Are procedures in place, Are people aware
of them, Are they being abide to?, Are they
adequate? Are there anybody
accountable?
• How well the management system is
functioning
• OSH auditing is important for the same
reason
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditing Versus Inspection
• Audits are for organisations (not on
individuals) (long-term plans)
• Evaluating companywide health and safety
controls and management system
• Inspection are for things (short -
medium-term)
• Identifying equipment or condition in a
workplace for corrective and preventive action
• Investigation are for situations (ad hoc)
• Inquire into a situation or problem in order to
discover the root cause e.g. of an accident
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection Sets Standards on
Hardware Aspects
Health
• Drainage, lighting, ventilation; cleanliness
and overcrowding

Safety
• Guarding, hoists, lifts; ropes, cranes, access,
floors, stairs; fire prevention means of
escape

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection Sets Standards on
Hardware Aspects
Welfare
• Washing facilities, accommodation and first
aid

An inspection will produce an action list rather


than an audit assessment sheet

10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection is Part of Auditing
Method
Interviewing

Observation

Reviewing

Inspection

Auditing and
Investigation Sampling

11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Audits
First party: Auditing own organization
(internal audit)
Second party:Auditing a contractor,
supplier, etc.
Third party: Independent consultant or
Certifier audits of an
organization

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Audits

Source : ISO 19011:2011

13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Effectiveness Depends on
Management Support
• Management authorise
– An audit policy and programme
– Responsibility, competent auditors, the
audit scope, the frequency of audits, audit
schedule, audit methodology and reporting
– Periodic audits to determine if OSH-MS
are in place, suitable, adequate, and
effective

• Review results of previous audits


14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determining Frequency of
Audit
• Management System standard mention audit
shall be conducted at „planned intervals‟
• Dependent on the objectives of the audit
• e.g. Compliance (CF once in 15 months)
• Nature of workplace:
• Degree of risk
• Management program maturity
• Results of prior audits
• Incident history
• Company policies
• Output from management reviews
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Auditing
1. Each audit must have its purpose,
objective, criteria and scope (activities
and areas)
2. Objectivity (only by independent and
competent auditors)
3. Professional and ethical conduct of the
audit (systematic, documented and
findings are based on verified evidence
and predetermined audit criteria)

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Auditing
4. Thoroughness of work to ensure fair
presentation of audit findings and
conclusions

5. Must end with a written audit report


(FLER)

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Process
Initiating the audit
Appointing
audit leader,
Audit definition,
Audit feasibility,
audit team, contact
On-site audit
activities
Document Review opening meeting,
Review documents Communication, Audit Report
and records, Roles and the Prepare, approve,
Determine adequacy distribute
responsibilities,
(Create checklist)
Collecting and
verifying
information, Audit Completion
Preparing For Audit Document
audit findings, retension,
Preparing the audit
plan, conclusions, finalise audit
Assigning work to the closing meeting
audit team,
Preparing work
documents, audit Follow -
notes Up
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditors
• Made up of one or more persons
(manday).

• A team approach:
– Widens involvement, improve co-
operation; allow more specialist skills to
be utilized.

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditors
• Auditors should be independent of the
part of the organisation or the activity
that is to be audited.

• Need to be competent and


understand the task to be carried out.
(Nace Code)

20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Objective, Scope and
Philosophy of Auditing
may vary as follows
Purpose: Meeting legal obligations

Audit Objective: Verify Regulatory


Compliance

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Objective, Scope and
Philosophy of Auditing
may vary as follows
Scope: Individual Facilities and
Operations
Criteria: Legal requirements

Philosophy: “Find problems & fix them


before they become an
issue!”
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audits must be Measured
Against a Criteria or Standard
(For example in the system of the court no one
can be charged unless there is a law against
it. The Penal Code is the criteria)
For auditing:
1. Industry and professional codes of practice
and conduct; (Responsible Care)
2. Legislation (CIMAH Regulations 1996, EQA
1974)
3. OSH Management system standards
(MS1722:2011, or OHSAS 18001 etc.)
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for On-site Audit
Activities
1. Prepare the audit plan
– Audit objectives, scope and criteria,
roles and responsibilities of audit team,
functional units to be audited, etc.
2. Assign work to the audit team

24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for On-site Audit
Activities
3. Prepare work documents
– Forms, checklist, etc.

4. Collect sufficient information about


the organisation including
newspaper article

25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing the Audit Plan

• Protocol
– A written step-by-step guide for
accomplishing the audit

• Preliminary Document Review

• Determine Interview Needs

26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing the Audit Plan

• Site Safety & Health Requirements

• Information Required
– e.g. list of major hazardous chemicals and
applicable MSDS for those chemicals

27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Conducting On-site Audit
Activities
1. Conducting opening meeting

2. Collecting and verifying information

3. Generating audit findings

28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Conducting On-site Audit
Activities
4. Preparing audit conclusions

5. Conducting closing meeting

29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Opening Meeting and Audit
Preliminaries
• Introductory meeting with managers

• Discuss audit rationale and process

• Confirm auditee cooperation

30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Opening Meeting and Audit
Preliminaries

• Availability of facility

• Overview tour of area

31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Activities as Scheduled and
Planned
• Document Review
• Inspection
• Interviewing
• Sampling
• Observation
• Communicating
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Collecting Audit Evidence
• Collect audit evidence through:
– Interviews, examination of documents and
observation of activities and conditions
– Indications of nonconformity to audit criteria
should be recorded
• Ensure:
– Representative sample of essential activities are
audited
– Relevant personnel are interviewed
– Relevant documentation examined

33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Subject Audited –
Plant Maintenance, Repair and Alteration
• Criteria • Examples of verification
There is a  Maintenance schedules in accordance
scheduled with manufacturers guidelines and
maintenance legislative requirements
program for  Detailed inspection procedures for all
plant and relevant items of plant and equipment
equipment. including timetables, checklists etc.
 Log books or other records that indicate
when service or maintenance is due
 Records of maintenance in accordance
with schedules

34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Document Inspection
Techniques
• Consistency with policy
• Cross checking with regulations
– Review existing and pending standards,
legislation, permits etc.
• Detail review of selected portion
• When reviewing permits, etc.
– Date of last entry
– Status of permits
– Signatory

35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Interview Strategy
• Ask the 5 “Ws” and the one “H”
– What, Where, When, Why, Who and How

• One to one meetings


– To get the true picture
• Strategic questioning
– To get above hidden agenda
– To ascertain levels of understanding and
awareness of relevant issues

36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Findings
• The audit team should review all of their
audit evidence to determine where the MS
does not conform to the MS audit criteria.
• Ensure that findings of nonconformity are
documented in a clear, concise manner and
supported by audit evidence
• Review audit findings with the responsible
auditee manager to obtain
acknowledgement of the factual basis of all
findings of nonconformity

37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Closing Meeting
• Formal meeting where minutes of the
meeting and attendance are taken
• To present the audit findings and
conclusions
• Attendees include the auditee but
can also include the client and other
parties

38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Closing Meeting

• Findings to be acknowledged by the


auditee and to agree on the time
period for the auditee to present
corrective action plan

• If diverging opinions are not resolved


than both opinions are recorded

39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Report
• The content of the final OSH Audit
Report should be:
– Clear
– Precise and
– Complete
• It should be dated and signed by the
auditor

40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of Audit Report
1. Audit objectives and scope
2. Audit plan
3. Identification of the auditing team
4. Audited representatives
5. Dates of audit
6. Identification of the areas subject to
audit

41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of Audit Report
7. The identification of reference documents
used
8. Details of identified non-conformances
9. Assessment of conformity with standards or
guidelines
10. The ability of the OSH-MS to achieve its
objectives
11. Distribution of audit report

42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Conducting Audit Follow-up
• Audit conclusion can point to corrective,
preventive and improvement actions
• Such actions are not part of the audit and
are undertaken by auditee within an
agreed timeframe
• The auditee should keep the audit client
informed of the status of these actions
• The completion and effectiveness of
corrective action should be verified

43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Audit is a management tool that assesses
the organisation.

• Auditing is very formal and systematic


and may include inspections in its
activities.

• An audit always have scope, objective,


audit criteria, written report and follow-up.

44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Before an audit is undertaken plans
that include document review and
other preparations are undertaken.

• Information is gathered during an


audit through document reviews,
inspection, interviewing, something
and observation.

45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Performance
Measurement &
Monitoring
Safety and Health Officer
Certificate Course

1
Learning Objectives
• To state the importance of
performance measurement and
monitoring

• To describe 2 ways of measuring


performance

• To calculate incident rate, frequency


rate, severity rate and fatality rate
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Importance of performance
monitoring and measurements
• Traditional indicators
• Performance measures
• Analysing and presenting data

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Incident?
• Incident is:
– an unexpected
– unplanned event in a sequence of events
– that occurs through a combination of causes
– which result in:
• physical harm (injury, ill-health or disease) to an
individual
• damage to property
• a near-miss, a loss
• any combination of these effects

4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Bother with Performance
Monitoring and Measurement?
• Performance monitoring and
measurement is like driving at night
– No headlights than you know you’re moving
but do know what you will crash into
– No map you might see your way but not know
where you are going to
• Required by regulation:
– Safety and Health Officer Regulations 1997,
USECHH Regulations 2000, etc.

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Performance Monitoring
Can Do
• Developing strategies in preventing incidents
• Recorded details provide a broad picture of
events
• The database can be analysed for info on:
– the most common types of incidents and the
factors that caused it
– the trend in safety performance
– benchmarking performance against other
workplaces

6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What You Need To Do
• Monitor:
– if organisation’s objectives are met
– compliance with OSH programme and
regulatory requirements
– Effectiveness of control
– Proactive and reactive measures
– incidents, ill health, near-misses
– environment (noise, fumes, etc.)
– medical / Biological (Lead, etc.)
• Determine how to reliably measure these
• Responsibility and authority for monitoring
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Ways of Measuring Performance
• Proactive (use measure for prevention) -
• Compliance (towards legal requirement --
Regulations, Codes of practice, Guidelines)
• Activity (training, safety meeting, inspection)
• Reactive (use measure for correction) -
• Near misses, injury, plant damage, etc.
• Qualitative & quantitative analysis e.g. fatality
rates, incidence rates

Note: It is better to prevent than to cure

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Disadvantages of Reactive
Measures
• Traditional performance measures have
been reactive measures
• They measure failure to prevent incidents
rather than “safeness”
• Useful for measuring deficiencies and
deviations
• These measures are very dependent
upon good reporting (e.g. near misses)
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Reactive (Traditional)
Performance Measures

10
Traditional Performance
Measures
Number of accidents
– Stated as Lost Time Injury (LTI) for workers
away from work for 1 day or more (used
by SOCSO)
– A better measure is to include near misses:
• No. of Accident+No. Of (incidents or near
misses)
• Difference between an accident and an
incident is quite often “luck”

11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
Incident Rate:
– Workplace with less LTI does not mean it is
safer than the one with a higher number if it
has less workers
– The number of undesired events for each
one thousand persons' working at that
location eliminates this problem
number of incidents
Incidence Rate   1000
annual average employment
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
Frequency Rate:
– The incident rate measure is a good measure for
comparisons between two locations
– However this is less accurate if the number of
hours worked by each person is different
– The frequency rate is a better comparison
especially between similar work locations

Frequency Rate = Number of Incidents x 1000000


Total Hours Worked

13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
Severity Rate:
– The Incident Rate and Frequency Rate do
not indicate how severe the incidents are
– If the number of days lost are taken into
account as a measure of severity than the
severity rate will show the seriousness of the
incidents in the workplace
Severity Rate = Total Workdays Lost x 1000000
Total Hours Worked

14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
• Fatality Rate:
– The fatality rate will show how many
deaths on the average are killed among
the people employed in the workplace

Fatality Rate = Number of Fatalities x 1000000


Annual Average Employment

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Proactive Measurement
• This measurement is concerned with
the quantity and quality of activity in
ensuring safety

• Performance measurement will


provide feedback on how well
occupational safety and health is
being managed

16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Proactive Performance
Measures
• Percent of compliance to legislation
• Percentage of training completed
• Frequency of "walk through" and
“checklist inspections” carried out
• Number of corrective actions
completed on time

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Proactive Performance
Measures
• Availability of competent persons
• Frequency of emergency drills and
exercise carried out
• Speed of emergency response

18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Presenting the Information
• The purpose of comparing and analysing
performance measures are to show
performance trend and to compare with
benchmarks
• Carry out analysis at plant level,
department level and at company level
• SOCSO does this at the national level
• Present for easy understanding, use
graphics

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Analysing and Presenting
Information
• Combination of measures present a
better picture
• Much information are best understood in
graphical form. Use:
– Pareto chart
– Bar Chart
– Histogram
– Gantt Chart
– Pie Charts
– Line Chart
– Cause and Effect Diagram
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Performance measuring and
monitoring is an important aspect of
management.

• Provides feedback for corrective


action and improvements.

21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• There are two types of performance
measures:
– Proactive measures indicate the quality and
quantity of activities to ensure a safe workplace
– Reactive measures are useful for measuring
deficiencies and the proactive measures

• Analyse information and present them for


good understanding.

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident
Investigation And
Corrective Action
Safety and Health Officer
Certificate Course

1
Learning Objectives
• To describe the importance of incident
investigation

• To list 4 types of incident

• To describe principles of investigation

2 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Learning Objectives
• To explain 8 steps in incident investigation

• To explain ways to plan and implement


corrective and preventive action

3 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Overview of an Incident Investigation

• Principles of Incident Investigation

• Pre-Planning and Strategy of an


Investigation

• Corrective Action

4 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Incident?
• Incident is:
– An unexpected
– Unplanned event in a sequence of events
– That occurs through a combination of causes
– Which result in:
• Physical harm (injury, ill-health or disease) to an
individual
• Damage to property
• A near miss, a loss
• Any combination of these effects

5 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is a “Near miss”?

• A “Near miss” is:


– An event which did not result in injury or
damage to property but had the
potential to do so
– Shares the same root causes as an
accident. It is only because of chance
that no harm or damage occurred
– Needs similar attention as an accident

6 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Four Basic Types of Incidents
• Minor accidents:
• Paper cut occurs on finger, box of
materials dropped on toe

• Serious accidents (cause injury or


damage to equipment or property):
• Falling off a ladder, hazardous chemical
spill, forklift dropping a load

7 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Four Basic Types of Incidents
• Long Term
•Hearing loss, cancer resulting from
exposure to chemicals

• Near misses

8 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Accident Causation Model
An accident is the result of a sequence of an
immediate cause and an underlying cause

1. Results of the accident - harm or damage


2. Incident – the accident
3. Immediate causes – symptoms of lack of
control
4. Basic (underlying) causes – the real problems

9 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Three Basic Causes of
Accidents
•Poor Management Safety Policy & Decisions
•Personal Factors
•Environmental Factors
Basic Causes
 Unsafe Act Indirect causes Unsafe
Condition 

 Unplanned Incidence ACCIDENT


Personal Injury,
Property Damage
Direct Causes

10 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contributing Factors To
Accidents –
Immediate Causes (Symptoms)
The unsafe acts and unsafe conditions
can be categorised as follows:
1. Human behaviour
2. Design of equipment and plant
3. Systems & procedures including use of
materials
4. Environmental surroundings
11 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Root Causes of Incident -
Management (The Real
Problem)
• Personal Factors • Supervisory Performance
– Lack of knowledge or skill, – Inadequate instructions, failure
improper motivation, physical of SOPs, rules not, enforced,
or mental conditions hazards not corrected,
devices not provided

• Job Factors • Management Policy &


– Physical environment, sub- Decisions
standard equipment, – Measurable standards, work in
abnormal usage, wear & tear, progress measure , work-v-
inadequate standards, design standards, evaluation ,
& maintenance, purchasing corrective action
standards

12 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Incident Investigation
• A management tool by which:
– Work-related injuries, ill health, diseases and
incidents are systematically studied so that their
root causes and contributing factors can be
identified

– The organisation’s Occupational Safety and


Health management system can be continually
improved

13 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Investigate an Incident
• To prevent repetition of the same work-
related injuries, ill health, diseases and
incidents

• Compliance to Legal Requirement

14 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Investigate an Incident
• Accurate record (for insurance, legal
prosecution, public enquiries)

• Organisation’s own policy and business


reasons

15 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Should Investigate?
Depends on Severity of the
Incident
• Internal Investigation team
– Individuals involved
– Supervisor, Safety officer
– Upper management
– External consultants
– Members of the Safety and Health Committee

16 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Should Investigate?
Depends on Severity of the
Incident

• External agency involvement


– DOSH and / or DOE, Police, etc.

17 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What & When to Investigate
• All serious and long-term incidents &
near misses

• As soon as possible to prevent:


– Scene interference
– Deterioration of evidence
– Losing people’s recollection of the
incidence

18 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Incident
Investigation

19 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Investigation

• Carried out according to


procedure:
– For all incidents
– By competent persons with
participation of workers.

20 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Investigation
• Should:
– Be systematic and documented
– Be treated as urgent (to prevent productivity loss
and deterioration of evidence)
– Be objective (fact finding only)
– Find the underlying (root) cause(s)
– Identify failures in OSH management system
– Implement corrective action

21 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Investigation

• The results should:


– Be communicated to the Safety and Health
Committee who should make appropriate
recommendations
– Include external investigation reports such as
DOSH and SOCSO
– Be communicated to appropriate persons for
corrective action
– Included in management review (OHSAS 18001)

22 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Be Prepared –
Before the Incident
• Identify who has the authority to investigate
and carry out mitigation action and
corrective action to completion

• Have a system for notification and


recording of all incidents and injuries

23 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Be Prepared –
Before the Incident
• Designated trained and competent
investigator
– Only be responsible for investigating

24 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
How Much to Prepare

Dependent on:
– The number and type of workplaces
– The equipment required to conduct the
investigation
– Ability for investigator to reach an
investigation site as soon as possible
– Geographical location
– Reliable transportation requirements
25 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Notification Procedure
• Notification:
– To management after an incident
– Initiated by the person involved
– Should be to his immediate superior
– To visitors and contractors
– Recorded
• Automatic system to notify investigator
• Include members of Safety and Health
Committee (if any)
26 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Investigation Procedure

1. For recording evidence

2. For observation and recording of fragile,


perishable or transient evidence
e.g. Instrument readings, control panel
settings, weather & other environmental
conditions, chemical spills, stains, skid
marks

27 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Investigation Kit Preparation
• Camera & • Clipboard, Pre-
Video Camera printed Forms
• Cassette Tape • PPE
Recorder • Containers for
• Flash and Batteries Taking and Storing
• Mobile Telephone / Samples
Walkie-Talkie • Barrier Tape

28 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities
• Employee
– Record in incident book (supervisor
checks)

• Supervisor / Manager
– Initiate risk control response: first-aid,
fence area, etc. other preventive action
– Inform SHO

29 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities

SHO
• Organise camera, tape and report form
• Check line management report
• Investigate if incident is serious and require to notify
authorities such as DOSH, DOE, Police, etc.
• Complete incident record form
• Summary report to Safety and Health Committee

30 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities
Investigator
• Visit and survey incident scene
• Eliminate the hazards:
– Control of chemicals
– De-energise
– De-pressurise
– Light it up
– Shore it up
– Ventilate

31 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
On-Site Investigation Strategy

32 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Steps in Incident Investigation
1. Gather information

2. Search for and establish facts

3. Isolate essential contributing factors

4. Determine the causes & root cause

33 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Steps in Incident Investigation
5. Determine corrective actions

6. Report, review the findings

7. Analyze incidents

8. Implement corrective actions

34 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information
• Time is of the essence

• Take samples, photos, measurements and


sketch diagrams,
– Preserve and protect data, Information and evidence
– Collect in order of fragility
• People, Positions, Parts and Papers; (4Ps)

• Record injury types & groups

35 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information

• Identify people involved


– Excellent source of first hand
knowledge

• Interview injured, witnesses,


supervisors and others

36 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information
• Get preliminary statements as soon as
possible from all witnesses

• May present pitfalls in the form of:


– Bias, perspective, exaggeration, hidden
agenda

37 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
People (Witnesses)
• One-to-one in private

• Put them at ease


– Make it clear the objective of the investigation is
to avoid recurrence, not to apportion blame

• Do not interrogate but Question!


– Let each witness speak freely on their version

38 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
People (Questioning)
• Strategic questioning - No leading
questions
• Obtain facts not opinions
• Ask What, Where, When, Why, Who and
How
• Get observation on events before, during
and after the incident

39 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
People (Questioning)

• Make sure the witness understands questions

• Use sketches and diagrams to help the


witness

40 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Recording Interview
• Take notes without distracting the witness

• Record the exact words used by the witness


to describe each observation

• Use a tape recorder only with consent of the


witness

41 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Recording Interview
• Differentiate what is directly observed and
what is hearsay and note accordingly

• Verify claims afterwards

42 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Closing the Interview
• Identify the designation and qualifications of
each witness (name, address, occupation,
years of experience, etc.)

• Supply each witness with a copy of their


statements

43 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Closing the Interview

• Get signed statements where possible and


necessary

• Thank the interviewee

44 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Position
• Document the incident scene before any
changes are made:
• Victim location
• Position of each witness on a master chart (including
the direction of view)
• Machinery, energy and chemical sources
• Other contributing factors
• Take photos, draw scaled sketches
• Record measurements

45 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Parts
• Around incident scene prior to, during or
after the incident that may have influence
• Materials, pieces of plant, tools, equipment,
buildings
• May require qualified person to examine or
comprehensive testing or sophisticated
equipment
• Reports by “expert witness." will form part of
the investigation evidence
46 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Evidence –
Paper
• Production schedules or process diagrams
• Check current working procedure
• Check qualifications
• Check training records
• Check corrective actions
• Check equipment maintenance records
• Check incident records
47 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Findings
• Isolate essential contributory factors
“Would the incident have happened if this
particular factor was not present?”

• Determine Causes
Employee actions, environmental conditions,
equipment condition, procedures, training

48 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Findings
• Find Root Causes. Ask:

What caused behaviour? Why equipment


was not fixed? Why condition was not
corrected?

49 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determine Corrective Action

• Recommendations made for


corrective actions

• Recommendations for corrective


actions to improve OSH
management system

50 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident Investigation Report

• Clear, complete description and


accurate information of events leading
up to the accident
• Clear, complete and correct
identification of all causal factors
• Recommendations
• Supporting documentation
• Proper review and sign off
51 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preventive and Corrective
Action

52 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Corrective and Preventive
Action
• Preventive and corrective action should be
carried out for:
• Incidents
• Management system non-conformances

• Recommendation(s) for preventive and


corrective actions must be communicated
clearly

53 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Corrective and Preventive
Action Planning
• Procedure for handling investigation and
preventive and corrective action
• Identification and authority for personnel
handling investigation and preventive and
corrective action
• Authority for initiating and confirming the
completion of corrective action

54 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing Corrective and
Preventive Action

• Must be based on root causes


• Appropriate to the problem at hand
• Reviewed through risk assessment
process to ensure that the correction will
not introduce a new hazard
• Strict time table for implementation
established
• Follow up conducted
55 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary

• Aim of investigation is to find root causes


• Purpose is so that similar incident will not be
repeated
• Prepare organisation, procedure and
equipment in anticipation of incidents
• Corrective and preventive action should be
carried out for incidents and management
system non-conformances

56 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management
Review

Safety and Health Officer


Certificate Course

1
Learning Objectives

• To define what is a management


review
• To identify the purposes of a
management review
• To explain the process of a
management review

2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Role of management review in
management
• Role of safety and health committee in
management review
• Establishing a review committee
• What to review
• Responsibilities
• Corrective action and review follow-up

3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Is A
Management Review
• Management review is a process of
reviewing the organisations management
system, programmes and performance by
top management

• Carried out by a Management Review


Committee made up of managers,
Management Representative (MR) SHO,
OSH specialist advisors and others
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Purpose of a Management
Review
• Reviewing the organisation OSHMS in order
to ensure its continuing suitability, adequacy
and effectiveness
• To ensure that the organisation complies to
meeting and achieving its own safety and
health policy and objectives
• It helps in making decision on necessary
corrections or opportunity for improvements

5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Involved in the Process
• Reviewing, evaluating or deciding on:
– Performance
– Implementation of policy and objectives
– Necessary changes to policy, objectives,
procedures, system of work , etc.
– Accommodating changes in regulation,
technology, standards or expectations
– Action plans for corrective action or
continual improvements
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Review and Evaluate
• Statistics and trends of accident, near-misses,
dangerous occurrence, poisoning or disease
• Results of internal/external audits/investigation
internal audit and evaluation of compliance with
applicable legal requirements and other
requirements
• Result of participation and consultation
• Relevant communication from external interested
parties including complaints
• OSH performance of the organisation
• The extent to which objective have been met
• Corrective actions carried out
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Review and Evaluate
• Reports of emergencies (actual/exercises)
• Status of incident investigations, corrective action
and preventive action
• Follow-up actions from previous management
reviews
• Changing circumstances, including developments
in legal and other requirement
• Recommendation for improvement
• Organisational changes and plant modifications

8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Review and Evaluate
• Reports of hazard identification, risk
assessment and risk control processes

• Report on the overall performance of


the management system; managers
reports

9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why you must carry out a
Management Review
• Required by SHC Regulations 1996, CIMAH
Regulations 1996, etc.
• Plan, Do, Check and Act One of the elements
used in many management system standards:
• Management system standards never
mentioned the method of review, however the
current practices is through meeting
– MS1722:2011
– OHSAS 18001:2007 Occupational Health & Safety
Management System standard
– ISO 14001 EMS, ISO 9001 QMS
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for a Meeting
• Ensure the necessary information is
collected
• Relevant personnel prepare
documents, reports and analysis
for the meeting
• Documents should be collated by
the secretary (SHO) of the
committee
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for a Meeting

• Consideration should be given to the


following:
– The topics to be addressed (agenda)
– Who should attend (managers, SHO, OSH
specialist advisors, other personnel)
– Individual participants responsible for
subjects of the review
– Information to be brought to the review

12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safety and Health Committee
Functions
• To assist in the development of
programmes and safe systems of work
• Review effectiveness of programmes
• Inspect workplace
• Report unsafe conditions and unsafe
acts
• Recommend corrective actions
• Investigate, any accident, dangerous
occurrence, poisoning or disease
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Frequency of Review
• Depends on organization's needs
and conditions.
• Standard mention review shall be
conducted at ‘planned intervals’
• Safety And Health Committee
Regulations 1996:
– Once every three months minimum; but
not necessarily review all items at every
meeting
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Frequency of Review

• High risk situations, changing nature of


hazards with time, and plant
complexity require more frequent
reviews.

15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management Review Meetings
must be Documented
• Minutes of the review
• Decision and actions related to possible
changes to;
– OSH Performance
– OSH Policy and Objective
– Resources; and
– Other elements of the OSHMS
• Revisions to the OSH policy and objectives
• Specific corrective actions for individual
managers, with target dates for completion
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management Review Meetings
must be Documented
• Specific improvement actions, with
assigned responsibility and target
dates for completion
• Date for review of corrective action
• Emphasis all the above in future
internal OSH management system
audits

17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management Review
Communication
• Observations, conclusions and
recommendations should be recorded
and formally communicated for
appropriate action to:
•The persons responsible for specific
tasks;
•The safety and health committee
(if management review committee is
different from the SHC);
•Workers and their representatives
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Continual Improvement

• Purpose of the Management Review


Committee is also for continual
implement improvement.

19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Continual Improvement
• Continual improvement should take
into account:
•Result of risk assessment
•OSH objectives of the organization
•Outcomes of the management review
•The recommendations from SHC and
members of the organisation
•Results of performance monitoring
•Investigation and audits
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Management review is good
management practice as well as a
legal requirement.
• Management review ensure that
OSH policies and objectives are
achieved.
• Management review activities
should be documented.
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary

• Action items should be communicated


to those responsible for
implementation.

• Note the action item for future audit.

22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.

You might also like