Professional Documents
Culture Documents
Niosh Sho Module 1
Niosh Sho Module 1
Perspective
1
Learning Objectives
• To describe the historical development of
OSH management over the centuries
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• OSH before and during the industrial
revolution
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Early Recognition Of
Occupational Diseases
• In 1713 Ramazzini, who is regarded as
the father of occupational medicine,
suggested that in diagnosis doctors
should ask patients about their
occupations.
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of
Industrial Safety Legislation
• In 1833 English Factory Act was the first
effective industrial safety law.
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of
Industrial Safety Legislation
• Insurance companies inspected work
places and suggested prevention
methods
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management
• Role of Herbert W. Heinrich (1930’s),
– Developed Domino Theory and promoted
control of workers behaviour.
• Problem:
• Focused on worker behaviour and not
management
• Caused people to think that safety is about
policing worker
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management
• Frank Bird (1970) developed Loss
Control Theory.
• Suggested that underlying cause of
accidents are lack of management
controls and poor management
decisions.
• Problem:
– Not so popular: blames management
(responsibility and control).
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management
• In 1980’s, Behavioural Based Safety (BBS) was
introduced;
• Based on Heinrich’s findings.
• Work by recognizing safe work habits and
offering rewards and punishment.
• Problem:
– Focuses on workers and not on hazard or
management
– Reward and punishment system have flaws
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Emergence of Safety
Management System
• Current development of Occupational Safety
And Health management system was driven
by two parallel forces:
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation
• Lord Robens, Chairman of a Royal Safety
Commission Report noted that:
– there was too many OSH legislation,
– was fragmented,
– limited in coverage (specific hazards &
workplace),
– out of date and difficult to update,
– inflexible (prescriptive),
– people thought that safety was what
government inspectors enforced.
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A Self-Regulation Legislation
• Features of “Robens style” legislation:
– General duties of care by:
• Employer, employee, manufacturer, designer,
supplier
• Duty of employer to make the workplace safe
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quality Management Approach
to Occupational Safety and
Health Management
– International and auditable OHSAS 18001
OSH Management System published in
1999
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident Prevention
1
Learning Objectives
• To define what is incident
• Causes of incidents
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of
Incident Prevention
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of
Incident Prevention
4. There must be an OSH policy
• Legal
• Human Rights
• Business
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Causes of Incidents
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Incidents
• Cause immediate injury or damage to
equipment or property:
– A forklift dropping a load
– Someone falling off a ladder
Fault of a person
Unsafe
act/condition
Accident
Injury
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Heinrich’s
Five Stage Sequence
Ancestry/social
environment
Fault of a person
Unsafe
act/condition
Accident
Injury
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Accident Causation Model
(1974)
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Three Basic Causes of
Accidents
•Poor Management Safety Policy & Decisions
•Personal Factors
•Environmental Factors
Basic Causes
Unsafe Act Indirect causes Unsafe
Condition
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Lack of Management Control
• Management responsible for:
– Selection of workers
– Machinery and equipment
– System of work
– Information, training and Instruction
– Supervision, etc
• The accident prone worker is a false
approach. It is like blaming the victim
instead of the perpetrator
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Multiple Cause of Accidents
Cause A
(Poor lighting)
Cause B Accident
(Not look where going) (Trip)
Cause C
(Wood in walkway)
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fall From a Defective Ladder
– Was the employee well trained?
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Trip Although Warned in
Dark Walkway
– Was there a necessity for that person
to walk in that area or was there a
safer route
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Accident Pyramid
3 Lost days
50 First aid
80 Property
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Productivity Aspect of OSH
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Direct Vs. Indirect
Incident Cost Iceberg
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Hidden Costs
Insured Costs -- covering injury, ill health, damage.
Hidden Uninsured – 8-36 times as much as insured costs
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Cost- Benefit Analysis of Control
Measures
• Compare specific incident costs with
cost of specific improvement being
suggested
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Du Pont Ten Principles of Safety
Management
• All injuries and occupational illnesses are
preventable
• Training is required
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Du Pont Ten Principles of Safety
Management
• Safety audits and inspections must be
carried out
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Du Pont Ten Principles of Safety
Management
• Safety away from work is as important as
safety at work
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Incident in the workplace is largely caused
by lack of management control
• “If you think safety is expensive, try
accidents”
• Implement an appropriate company policy
• Control OSH risk
• Put a management system in place
• Promote Occupational Safety and Health
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Management
System (OSH-MS)
1
Learning Objectives
• To define what is a system
• To define what is an OSH
management system
• To describe the purpose of a system
• To explain 5 components of typical
OSH-MS
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is a system
More
than one
elements
SYSTEM
Inter- Moving in
related sequence
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is a System
• An orderly set of components that work
together for a certain purpose
• E.g. the blood circulatory system
– Components:
• Heart and blood vessels (artery, veins,
capillaries)
– Purpose:
• To transport blood which contains oxygen and
nutrients to all parts of the body
• To carry wastes away to be filtered out of the
body
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an OSH Management
System
• An OSH management system
– Components:
• Arrangements (policy, planning, implementation
and operation, checking, management review)
– Purpose:
• To ensure safety, health and welfare of workers
• To comply with regulation
• To manage and minimize OSH risk to
acceptable level
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Do You Need a System
• A system is useful when there are:
– Many activities have to be managed
together
– Complex information that are
changing have to be taken into
account at all times
– Enables training needs to be
identified and the adequacy of
subsequent training assessed through
measures of competency
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Do You Need a System
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Typical OSH-MS “Components”
1. Policy
2. Plan - System planning, OSH objectives,
development and implementation
3. Do - Responsibility and accountability;
Competence and training, Hazard
control system
4. Check -Performance measurement;
Accident / incident investigation;
Auditing
5. Act - Preventive and corrective action,
Continual improvement
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
An OSH-MS System Model
OSH-MS such as MS1722:2011 & OHSAS
18001:2007 are based on the Quality
Management System components of Plan,
Do, Check and Act (PDCA)
INPUTS
PLAN DO POLICY OBJECTIVES
CHECK
ACT Monitor
Corrective Action Surveillance
Review Inspect
Improve Investigate
Audit
Record & Analyse
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Existing OSH Management
System
• There are two occupational safety and health
management system standards:
– OHSAS 18001:2007 Occupational Health & Safety
Management System standard
• This standard was established in 1999
• Latest version 2007
• Widely used and certifiable
– MS1722:2011 management system standard
• This standard was published in 2003
• This is a guidance standard
• Latest version 2011
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
MS1722:2011 Management System
Model
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Continual
improvement
OH&S
Management policy
review
Implementation
and operation
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy
• Workers and their representatives are
consulted
• Ensuring that management and
workers are competent and
understand their rights
• Allocating the necessary resources
• Continual improvement
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Initial Review
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Objectives
• Based on the initial review and
consistent with the OSH policy set
measurable and quantifiable
objectives to implement the policy
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organising
• Responsibility and accountability for
OSH performance for managers &
supervisors
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organising
• Procedures should be established and
maintained for communications
externally, internally and how to receive,
document and respond comments from
third party
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Monitoring and Measurement
• Performance measurement
• Evaluation of compliance
• Accident, disease and incident investigation
• Control of record
• Auditing
• Management review
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Elements
• Continual improvement
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
MS1722:2011 Standard
Requirements
• The MS 1722:2011 standard contains
the following components:
1. Policy
2. Organizing
3. Planning and Implementation
4. Evaluation
5. Action for Improvement
Management Review
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy
• Management must have a written
OSH policy
• Management must commit
themselves to:
1. Promoting health and preventing
accidents, diseases and other work-
related health effects in the workplace
2. Complying with OSH legal requirements
and other requirements
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Policy
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organizing
• Management as a whole is responsible
for OSH
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Organizing
• Employees are informed of hazards
they are working in and procedures
are established to ensure their safety
and health
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Planning and Implementation
• Hazards identification and assessment is
made the basis of OSH management
• Preventive, protective measures must be
implemented
• Have an emergency preparedness and
response arrangements
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Planning and Implementation
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Evaluation
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• A system is a set of components that
work together for a certain purpose
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• The components of OSHMS are
Policy, Plan, Do, Check, Act
1
Learning Objectives
• To define what is an OSH policy
statement
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• What is an OSH Policy and Why do we need
it
• Legal requirements of an OSH Policy
• Formulating the policy
• Implementing the policy
– Responsibility assignments
– Arrangements required to implement the policy
– Monitoring the policy
– Reviewing and revising the policy
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an OSH Policy
Statement?
• Overall intentions and direction of an
organization related to its OSH
performance as formally expressed by
top management
• The OSH policy statement is a
document that sets out how the
organisation will manage safety and
health in the workplace.
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why are OSH Policy Statement
Important?
• Demonstrate top management accountable to
their employees health and safety
• A statement of commitment from top management
• Shows employees that management cares
• A guide for all levels of employees to base their
actions and decisions
• The starting point for planning and organising OSH
programmes
• Framework for setting and reviewing OSH objective
• Required by law
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements –
OSHA 1994
• To have a written OSH policy statement
• Employees must be aware of the
requirements of the policy
• OSH Policy is to be implemented
– Organisation (responsibilities)
– Arrangements (plans, resources, procedures,
system of work, etc.)
• To revise the policy when necessary
• Exemption to organization with less than 5
employees
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4 Steps in Implementing
OSH Policy
1. Formulate and write the policy
– Include statements of vision and goals,
– Provide framework objectives and target
related to risk
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4 Steps in Implementing
OSH Policy
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Formulating the OSH Policy
• The policy has to be read, understood and
acted upon by employees, supervisors and
managers. Therefore it must be SMART:
Simple (Use layman’s language, to the
point)
Measurable (Performance can be monitored)
Achievable (Realistic and based on own
needs)
Reasonable (Always aim high but must be
Practical)
Tractable (Able to be analysed and
tracked over period of time)
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Formulating the OSH Policy
• Make statements that take into account:
– Vision and goals (“zero accident”, continual
improvement)
– Legislation (compliance, competency of
employees)
– Clients (compliance to clients’ safety
procedures)
– Associations (“Responsible Care”)
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing the OSH Policy
1. Begin with goals, statement of intent,
objectives, identified risks as stated in the
policy
2. Establish OSH programme(s).
Example of programme
• Maintenance of safety critical equipment
and plant, safe working environment, means
of access to and egress and requirement of
Job Safety Analysis
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Monitoring the OSH Policy
• Monitoring and Surveillance of
workplace environments
• Workplace inspections
• Auditing
• Incident / accident investigation
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Reviewing and Revising the
OSH Policy
(By Safety Committee)
• Performance statistics
• Review policy
– Experience
– Operational or organisational changes
– Alterations of plant or processes
– New legislation
– New hazards identified
– Change of business
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
1. A written OSH Policy is required by law
2. Formulate the policy to reflect OSH
arrangements and organisational goals
3. Write a simple policy so that it is easily
communicated and understood
4. Implement the policy by having a policy
implementation programme
• Assign responsibilities to all
• Provide arrangements
• Monitor the policy implementation
• Review the policy as necessary
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Promotion,
Training &
Communication
Safety and Health Officer
Certificate Course
1
Learning Objectives
• To identify 6 promotional techniques
• To demonstrate interpersonal
communication
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• OSH promotion and techniques
• Processes of communications
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Promotional Technique
Use combinations of the following techniques
to reinforce health and safety message:
• Leading by example
• Employee involvement
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Leading By Example
• Management at all levels and on all
occasions must never ignore safety rules
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Employee Involvement
• Joint management-employee programmes:
– OSH safety day, week, month
– Competitions
– Management reporting of Incidents on notice
boards, bulletins and newsletters
– On-going hazard spotting and near-miss
reporting, inspections, house-keeping, etc.
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Best Practice
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Employee Attitude Survey
• Measures employees' perceptions;
perception is reality
• Productivity and morale is closely linked to
perceptions of their work environment
• Questions e.g.
– Quality of management communications
– Satisfaction with employee training
– Safety and health concerns
– Cooperation among peers and workgroups
– Understanding a corporate goals and mission
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Communications
11
Importance of Communication
• Most of our working life is spent
communicating: to get things done, to
report or to receive instructions
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Communication Process
• Communication is a two-way process
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When Coaching or Instructing
• Instructions should be:
– Simple, clear, accurate and complete
– In proper sequence
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Meetings and Committees
• A meeting is where employers can meet
with employees to discuss common
problems and to get employee feedback
• Employer-employee consultation is one of
the distinguishing features of quality
management
• Mandated by regulations and OSH-MS
– For example Safety and Health Committee
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Toolbox Meeting
• Toolbox meetings are carried out regularly:
– Every morning by the supervisor before the
workers start their work
– To remind workers of the danger or hazards in the
workplace during the activities for the day
• Brief (10 -15 minutes) and on one topic
• Attention is given to requirement for
attendants and participation at the meeting
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Non-Verbal Communications
• Notice boards - incident/near-miss on
• Bulletins – alerts on specific accidents or
lessons learned
• Newsletters - news, messages, articles
• Warning signs – at places of hazards
• In law workers need to know hazards they
are exposed to:
– Labels – on containers of chemicals
– Data sheets – MSDS
– Instruction manuals
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Information Sources
• NIOSH - Training programmes
- Information & consulting service
- Newsletter
• Consultants
• Libraries
• Internet
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazards Communications
• Employees and the public has to be
protected against harm
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Importance of Listening
• Suggestions and reports of incidences
or near misses from workers are
important
• Workers will not communicate if they
perceive that supervisors:
– do not respect his person
– are not listening
– do not care
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Importance of Listening
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Active Listening
• Non-verbals techniques include:
good eye contact, facial expressions, body
language, silence, touching
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Dealing with Conflicts
• AVOIDANCE - see others point of view
and agree course of action.
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Dealing with Conflicts
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Reason Why Employees Do Not Perform
As Expected - Ferdinand F. Fournies
• They don't know why they should do them.
• They do not know how to do the task
correctly.
• Education and training will eliminate the
causes for substandard performance.
• Education and training will give them
knowledge.
• With knowledge their attitude towards
work will change.
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Train and Retrain?
• Instructions and procedures alone is not
sufficient.
• Shortcut for learning from experience.
• Employees need to know what they are
looking at or what to do and what to look
for.
• Cannot assume experience from previous
employer is similar.
• Materials, processes and technology may
have changed.
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Common Sense?
A Mistaken Assumption!
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements
• For example:
– Factory And Machinery Act 1967
– Lead Regulations 1984, Asbestos Process
Regulations 1986, etc.
– Occupational Safety And Health Act 1994
– USECHH Regulations 2000, CIMAH
Regulations 1996, Safety and Health
Committee Regulations 1996, SHO
Regulations 1997
– Operator competency requirements
– Crane, scaffold, forklift, engine driver,
charge man, confined space, etc.
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Assessing Training Needs
• Begin the assessment by establishing:
• Aims and objectives of training
• Time scale
• Level at which training is required
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training Documentation
• Should be kept for all employees
and contractor training:
– Type
– Names of trainees
– Checks on learning
– Date
– Date / type of next training
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documentation
1
Learning Objectives
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Levels Of Documentation
• Documentation Requirements
• Procedure Writing
• Document Control
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Documentation
• What is a document?
– Information and its supporting medium
– Paper or booklet providing information
– Record or report in detail
Safety
Manual
Procedures
Work Instructions
Hierarchy of Documentation
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 1 - Manuals
6
What are OSH Manuals For?
• Description of the main element of the
OSHMS and their interaction, and reference
to related documents
• Provide information for effective control of
hazards in the workplace
• To control OSH management activities in
accordance with requirements
• Provide overview information of OSH
management system
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of OSH Manual
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of OSH Manual
The manual at the minimum contain:
• Scope of OSHMS
• OSH policy statement and OSH objectives
• Description of the main elements of the OSHMS
• Assignment of roles and responsibilities
• List of significant hazards/risks and arrangements for
prevention and control
• Personnel competency and training records
• Procedures, instructions and other internal documents for
OSH management
• Reference to related documents
• Associated records
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 2 - Procedures
10
What Are OSH Procedures?
• Translation of the organisation’s policies,
objectives, and programmes into specific
instruction.
• Basis for effective control of hazards and of risks.
• Specified way to carried out activity or a
process (procedure can be documented or
not)
• Description of elements as defined in OSH
manual
• Procedure as required by management system
standard requirements
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Are OSH Procedures?
• To control management activities in
accordance with specified
requirements.
•Procurement activities and
arrangements
•Monitoring and control activities
•Selection and use of materials or
equipment
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documentation (Procedures)
are Required when:
• A consistent and standard approach is
required
• Seek for consistency of implementation
within organization
• Risky, hazardous or complex operations
requiring sequence and detailed steps
• Lesson learnt from previous mistakes need to
be captured and communicated to others
so that it will not be repeated
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When Procedures are Required –
Support Activities
• Inter-department relationships such as
finance, human resources and general
administration (eg; training needs,
competency requirements, roles and
responsibilities)
• Standardize implementation in relevant
functions and level within the organization
• Achieving compliance with policy,
programme and legal and other
requirements
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When Procedures are
Required – Support Activities
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Procedures
• Hazard Identification, Risk • Performance
Assessment and Risk Measurement and
Control Monitoring
• Legal and other • Evaluation of Compliance
Requirements • Incident Investigation,
• Competence, Training Nonconformity, Corrective
and Awareness and Preventive Action
• Communication, • Control of Records
Participation and • Internal Audit
Consultation
• Control of Documents
• Emergency, Preparedness
and Response
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 3 – Work Instructions
17
Instructions
(How we do our daily job)
• Provide detailed information on how to:
– Perform specific tasks
– Use of specific method and system of work
– Use of specific equipment
– Timing
– Result
– Prepare forms
– Refer to other documents
– Control of processes that relate to the
management of its OSH risks
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Instruction
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Instruction
– Checking the connection of the delivery
hose, drainage of the residual liquid into a
container on disconnection and
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Example of Instruction
• Excavation work • Management of
• Forklift operation Change
• Working at height • PPE
• Pest control operation • Procurement and
• Chemical contracting
management • Contractor
• Housekeeping management
• Heavy lifting
• Night work
• Traffic management
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level 4 - Records, Forms,
Reports and Registers
22
Records, Forms, Reports
(How we do our daily job)
• Records are documents used to track
and demonstrate compliance/
performance
• A form is a documentation to
standardise records
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records, Forms, Reports
(How we do our daily jobs)
• Reports are summaries of performance
or their analysis (Report is a part of
record)
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records may Include:
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records may Include:
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Examples of Records
to be Kept
• Legal, regulatory and other • Hazardous material spill /
code requirements other incident reports
• Results of risk Assessment • Communications with
• Permits, licenses and other customers, suppliers,
approvals contractors and other
• Training records external parties
• Audit and regulatory • Results of management
compliance audit reports reviews, minutes of meeting
• Reports of identified • Sampling and monitoring
nonconformities, corrective data
action plans and corrective • Maintenance records
action tracking data • Equipment calibration
records
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Records and Retention Periods
On-site Records/files
Document Retention
time
Training records 10 yrs.
SHC minute of meeting 7 yrs
Monitoring data 30 yrs.
Failures, incidents, complaints and follow- 30 yrs.
up actions
Maintenance records 10 yrs.
Chemical inventory reports 30 yrs.
Hazard communication documents 30 yrs.
MSDS 10 yrs.
Permits-while active
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Procedure & Work Instruction
Writing
29
Documentation vs. Training
• Keep procedures to the minimum
(It is important that documentation is proportional to the level
of complexity, hazards and risks concerned and is kept to the
minimum required for effectiveness and efficiency)
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documentation vs. Training
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Should be in the
Procedures/Work Instruction
• Objective and Scope
• Responsibilities
• Clear definition of the organisational structure
• Reporting relationships if any
• Authorities
• Management controls (approvals, etc,)
• The competence, qualification, training and
education of personnel
• Process steps
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Making Use of Procedures/Work
Instruction
• Safe system of work procedures/work
instruction can be ncorporated/integrated
into a method statement.
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Requirements
• Clearly written (what people need to
do), accurate, and comprehensive
• To be understood by those who have
to use them (user-friendly)
• Involve users in writing (committee
involved during write up/formulation)
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Requirements
• Periodically reviewed
• Revised as necessary
• Communicated to users
• Readily accessible to all affected by
them
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Requirements
• Procedures/Work Instruction should be
appropriate to the nature, complexity and
significant risk
• Established, managed and maintained
locally
• Should be identifiable
• Records
– Traceable
– Retention times should be specified
– Health records are confidential
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure Work
Instruction
• Procedures Work Instruction should
cover, where relevant, the three
periods of undertaking:
– Before work is begun (preparation)
– During
– After (cleanup and commissioning)
37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure Work
Instruction
• Work Instruction should also cover periods
of:
– Start-up operations
– Normal operations
– Abnormal operations e.g. during maintenance
– Emergency Operations e.g. during a flood
38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure/Work
Instruction
Approval Requirements
– New procedures and all revisions
– Approval assures that all involved and
affected have the opportunity to take
exception to, offer input to, or approve of
administrative procedures
– The approval of head or CEO of issuing
organisation is most important
39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Writing a Procedure/Work
Instruction
Approving authority
A. Issuing department's manager
B. Person primarily responsible
C. Any manager whose department is
affected
D. Author of the document
E The SHO
F. Head or CEO of the issuing or using
organisation
40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documenting Standards
• Effective date
• Responsibilities
• Title of document
41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documenting Standards
• Effective date
• Revision number
42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Documenting Standards
• References
• Procedural steps
43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Purpose of Procedure and
Records Control
• There should be a procedure to
ensure:
– That they can be located
– Are periodically reviewed, revised as
necessary
– Approved for adequacy by authorized
personnel
– Current versions of relevant documents are
accessible for those who need them
44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Prevent Non-current Documents
From Unintended Use
• Remove promptly from:
– All points of issue
– All points of use
• Archival documents are suitably
identified
• Note: Archival documents are data retained
for legal and knowledge preservation
purposes.
45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Procedures ensure consistency and
continuity of work.
46 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
47 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment And
Management
1
Learning Objectives
• To define what is hazard, risk and danger
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Risk control
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Overview of Risk and
Risk Assessment
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Definitions
• Hazard: A source, situation or act with
a potential for harm in terms of human
injury or ill health and damage to
property (Source: MS1722:2011)
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Definitions
• Risk: A combination of the likelihood of an
occurrence of a hazardous event or
exposure with specified period or in
specified circumstances and the severity of
injury or damage to the health of people,
property, environment or any combination
of these caused by the event or exposure
(Source: MS1722:2011)
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Principles of
Risk Management
1. Integrate Risk Management as part
of planning at all levels of business
2. Accept all risks
3. Make risk decisions appropriately
(depending on level of risk)
4. Manage the risk
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Carry Out
Risk Assessment?
• Gives organisations a more effective way of
managing hazards
- Systematic way of understanding hazards
- Control hazards based on facts
• Requirement of the law e.g.
– OSHA 1994, CIMAH Regulations 1996 & USECHH Regulations
2000
• Requirement of OSH management system
standards:
– MS 1722:2011,
– OHSAS 18001:2007
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment Should Be
Carried Out For:
• Routine and non-routine activities including
emergencies;
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When to Carry Out
Risk Assessment
• Before Operation
• During Operation
• After Operation
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When to Review
Risk Assessment
• Types of review:
– initial review, and
– periodic review.
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
When to Review
Risk Assessment
• Review whenever there are changes:
– internal
• Before modification, changes or introduction
of new
– Materials, machinery or processes, working
procedures,
– external
• Amendments of national laws and regulations
• Developments in OSH knowledge and
technology
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Will Carry Out
Risk Assessment
• Person or persons trained to identify hazard
and risk assessment
– In some cases legally competent person,
example : Chemical Health Risk Assessor
• Involvement of supervisors
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Components of
Risk Management
• Hazard Identification
• Risk Assessment
• Risk Control
• Review
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Process of
Risk Management
Start
Classify Activities
(Work, Product, Services, Activities)
Identify Hazards
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
SOURCES OF HAZARDS
Man Unsafe acts
Machinery Installation, layout and design of
equipment
Materials Substances such as chemicals
and gases used in the workplace
Method The way people carry out their
work
Media Workplace condition i.e. air
quality, ventilation, lighting, noise,
vibration etc.
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Classification and
Potential Sources of Hazards
Classification of Example of Potential Sources of Hazards
Hazards
Mechanical Pinch points, sharp points and edges,
overload or force a tool beyond its
capabilities and grinding wheel without
guard
Electrical Electrical cord insulation damaged,
electrical face plate or cover broken or
missing and fan cord insulation pulled
loose
Biological Exposed to airborne and blood borne
viruses, bacteria and fungus
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Classification and
Potential Sources of Hazards
Classification of Example of Potential Sources of Hazards
Hazards
Chemical Exposed to carcinogens chemicals,
sensitizers and corrosive chemicals
Ergonomics Repeated exposure to unnatural
postures and unnatural movement,
awkward design of workstation, tools
and task
Psychological Stress, sexual harassment and violent at
work
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Pre-Assessment –
Information Gathering
• Information on the facilities, processes and
activities of the organization, including:
– Area Map
– Site plan(s); own and neighbour
– Process flow-charts
– Inventory of materials (raw materials, chemicals,
wastes, products, sub-products)
– Toxicology and other health and safety data
– Monitoring data
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Pre-Assessment –
Classifying Work Activities
• Geographical areas within/outside the
premises;
• Stages in a production process, or in the
provision of a service;
• Defined the tasks (e.g. driving, window
cleaning);
• Identify the working groups;
• Land use; previous property use, future use.
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Methods of
Identifying Hazards
• Review of documents and publications
• Inspection and observation at the
workplace
• Measurement of the atmosphere,
monitoring the environment or medical
surveillance of workers
• Hazard Analysis
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Document Review
• Reports of accidents, accident
investigation and audits
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection and Observation
• Types of inspections: statutory inspection,
periodic inspection, formal and informal
inspection
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection and Observation
• Activities - to involve supervisors, managers
and employees
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Exposure Monitoring
• Types of monitoring: area and personal
monitoring
• Monitoring of:
– Noise
– Heat
– Radiation
– Air contaminants
– Chemicals etc.
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Biological Monitoring
• Biological monitoring is a regular measuring
activity where selected validated indicators
of the uptake of toxic substances in the
human body are determined in order to
prevent health impairment
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Biological Monitoring
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Medical Surveillance
– Substance is hazardous
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazards Analysis
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Job Safety Analysis (JSA)
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Job Safety Analysis (JSA)
• Note:
– The term JSA includes the formulation of safe work
procedures using written instructions for workers
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hazards And Operability Studies
(HAZOP)
• To identify and evaluate safety hazards in
the process plant
• To identify operability problems
• New design or process
• Multidisciplinary brainstorming
• “What If” questionnaire method
• Focus on fire, explosion, toxic release etc.
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fault Tree Analysis
• To analyse how and why incident could
occur
• Graphic technique - traces branches of
events
• To calculate probability of end event
• Example: Water pumping system
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fault Tree Analysis
No Flow (T)
•No water flow occurs if both pumps fail or if the control valve fails.
•If the individual initiating event probabilities P(A), P(B), and P(C) are
known, then the probability of P(T) the top or end event can be
calculated.
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Assessment
37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Risk Assessment
Approach:
38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determining Severity
– Harm to health
– Damage to property
– Damage to environment
– Or the combination of the above
39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Severity
Determine severity categories i.e.:
• Fatality
40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determining Likelihood of
Occurrence of Hazard
• Based on statistic & data, professional
judgement
• Determine likelihood categories i.e.:
– very unlikely,
– likely,
– unlikely,
– highly unlike.
41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Likelihood
• Very likely - could happen frequently
42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Qualitative Risk Table
Severity Likelihood
Very Likely Likely Unlikely Highly Unlikely
Fatality High High High Medium
Major Injuries High High Medium Medium
Minor Injuries High Medium Medium Low
Negligible Injuries Medium Medium Low Low
43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Semi - Quantitative
Risk Assessment
Determine severity categories i.e. :
• 4: Fatality & Permanent Disability
44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Semi - Quantitative
Risk Assessment
Determining Likelihood of Occurrence of
Hazard
• 4: Daily
• 3: Weekly
• 2: Monthly
• 1: Yearly
45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Semi-Quantitative
Risk Assessment
LIKELIHOOD
Yearly Monthly Weekly Daily
1 2 3 4
First Aid
1 2 3 4
SEVERITY
and Near 1
Misses
Less than
or 4 days 2 2 4 6 8
MC
More than
4 days MC
3 3 6 9 12
Fatality &
Permanent 4 4 8 12 16
Disability
46 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment
• Where the hazards presented by the
undertaking are numerous and complex,
and may involve novel processes, for
example in the case of large chemicals
process plants, detailed and sophisticated
risk assessments will be needed, and it is
appropriate to carry out a detailed
quantitative risk assessment
47 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment
48 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment
49 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Quantitative
Risk Assessment
• Where such methods and techniques are
used it is important that they are carried out
by suitably qualified and experience
assessors
50 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Decision for Action
AS LOW AS REASONABLY PRACTICABLE (ALARP)
PRINCIPLE
52 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Risk Control
53 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principle of Control
54 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Consideration in Implementing
Risk Control
• Review measures regularly; modify if
necessary
55 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Consideration in Implementing
Risk Control
56 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hierarchy of Control
MOST EFFECTIVE
Elimination - remove the hazard
FAIRLY EFFECTIVE
Substitution - use less hazardous one.
Isolation – isolate the work area i.e. X-ray machine in restricted
room
Engineering Control – design, isolation at source, barricade,
guarding,
LEAST EFFECTIVE
Administrative Control – safe work procedure, isolation i.e. reduce
exposure time and limit, training, signage etc
PPE - last resort.
57 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• The basis of OSH management is the
identification of hazard, risk assessment and risk
control
• Ways of identifying hazards varies from
inspection of the workplace to reviewing
legislation
• Risk assessment allows an organisation to build
a sound basis for managing hazard
• Hierarchy of hazard control starts by elimination;
usage of PPE for protection as the last resort
58 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Personal Protective
Equipment (PPE)
1
Learning Objectives
• To define what is personal protective
equipment
• To state the position of PPE in the
hierarchy of hazard control
• To describe the management and
legal issues of PPE
• To select appropriate body
protection equipments
• To demonstrate the PPE equipments
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Introduction to PPE
• Body protection
• Respiratory Protection
• Special Work Clothing
• Introducing PPE to Workplace
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Personal Protective
Equipment?
• Devices and garments to protect
workers from injuries.
• Designed to protect
– Eyes, Face, Head, Ears, Feet, Hands and
Arms, Respiratory System and Whole body.
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Personal Protective
Equipment?
PPE includes
– Goggles, Face shields, Safety glasses,
Hard hats, Safety shoes, Gloves, Vests,
Respirators, Earplugs and Earmuffs.
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
PPE
PPE SHOULD BE A HAZARD PROTECTION
OF LAST RESORT
– Not to be used permanently as a substitute
for maintaining a safe and healthy work
environment
– Use only when the work environment cannot
be made safer
E.g. through hazard elimination engineering,
administration or by limiting work exposure
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Problems with PPE
• If PPE is used as the first option without
reducing hazard at source:
– Risk to workers if PPE fails and failure not
detected.
– Cause employees to believe they are "safe" and
may take higher risks.
– Result in worse consequences if people fail or
forget to wear equipment.
– Will shift the responsibility for safe working
condition from the employer to the employee.
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Protect From?
Any insult to the external (surface) or
internal part of the body:
• Impact (e.g. flying & falling objects, knocks
& bumps)
• Chemicals hazardous to health (gases and
liquid)
• Radiation (IR & NIR) (e.g. heat, high
intensity light, noise)
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Protect From?
• Sharp objects
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Considerations in the
Selection of PPE
• Selection of PPE is dependent on the
hazard identification, risk assessment
and control measures implemented
• PPE is used to
complement/combination of other
control measure
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Considerations in the
Selection Of PPE
• PPE selected must be carried out
under a PPE programme
• PPE must be certified products to
ensure acceptable level of protection
from hazards
• Limitations of PPE must be identified
adhered to
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Ensuring Employee
Compliance
• Make it easy for employee to comply
• Factors to consider:
– Understand the necessity to wear the PPE
– Easy and comfortable with minimum
interference to work
– Pre-purchase employee feedback on
equipment
– Psychological: employee vanity, virility
– Incentives and disincentives on wearing the PPE
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training on PPE
• Hazard recognition in the work
environment
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
PPE IS PERSONAL!
Fit
– PPE must be properly fitted to ensure
reliable protection.
Care
– Issued on a personal basis.
– Individuals responsible for the day to
day use, handling, cleaning, storage
and maintenance, reporting of
defects.
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
MULTIPLE USER PPE
• Should be correctly used, handled,
stored, cared for and maintained.
• Appropriate procedures on suitable
cleaning and sterilisation must be
provided.
• Above must be observed at all
times.
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements
Factories and Machinery (Safety,
Health and Welfare Regulation), 1970
– Regulation 32
• Clothing
• Safety helmets
• Gloves
• Eye protection
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Legal Requirements
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Face and Eye Protection
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Face and Eye Protection
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Head Protection
Helmets and Bump Caps
Protective helmets are intended to:
– Protect the head from the force of
impact of falling objects or from electric
shock
– Shield the head and hair from
entanglement in machinery or exposure
to environments
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Head Protection
Helmets and Bump Caps
Examples:
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Headwear Care and
Maintenance
• Helmets should be inspected for cracks
(even hairline cracks), signs of impact or
rough treatment, and wear before use.
• Prolonged exposure to ultraviolet rays
(sunlight) and chemicals can shorten the life
span expectancy of thermoplastic helmets.
• Solvents can damage the shell. Be careful
when using them for cleaning.
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hands and Arms
Gloves, Gauntlets, Mitts, Wrist Cuffs, Armlets
Hazards
– Abrasion; temperature extremes; cuts
and punctures; impact; chemicals;
electric shock; skin irritation, disease or
contamination; vibration; risk of product
contamination.
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hands and Arms
Gloves, Gauntlets, Mitts, Wrist Cuffs, Armlets
Materials
– Leather Abrasion protection, heat
resistance
– PVC Abrasion protection, water
and limited chemical
resistance
– Rubber Degreasing, paint spraying
– Cloth/nylon Hand grip
– Latex Electrical insulation work
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Protective Footwear
Protection for Feet and Toes
Options
– Safety boots and shoes with steel toe
caps, gaiters, leggings, spats and clogs.
conductive shoe.
Patterns
– Anti-slip, anti-static, electrically
conductive or insulating.
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Protective Footwear
Protection for Feet and Toes
Hazards
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Fall Protection Systems
Personal lifelines
• Body support
• Lifelines
Hazard
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Hearing Protection
Ear muffs, Ear plugs, Helmets
Selection of hearing protection
(i) The characteristics of the noise
(ii) Frequency of exposure
(iii) Comfort of the user
(iv) Communication needs
(vi) Medical conditions
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Respiratory Protection
• A respirator is a protective face piece,
hood or helmet.
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Kinds of Respirators
Air-purifying Respirators
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Kinds of Respirators
Atmosphere-supplying Respirators
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Selection and Fitting of
Respirators
Selection depends on
(a) The contaminant
(b) Task
(c) Operator
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Selection and Fitting of
Respirators
Fit testing important
– Individual variation
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Problems with Respirators
• Good only if properly fitted and worn
• Protect only those who are wearing
them
• Uncomfortable, cumbersome and
interfere with communication
• Costs are substantial require
– Regular medical examinations, fit testing,
training, and the proper purchasing of
equipment
– Maintenance and storage
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Special Work Clothing
• Selection factors
• Materials:
– Impervious clothing
– Protection against heat, flame and
hot metal
– Others
37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Introducing of PPE to
Workplace
If PPE is to be used, then:
– Write in the OSH policy on usage of PPE and
communicate it to employees and visitors
– Select the proper type of PPE
– Implement a thorough training programme/
demonstrate proper use
– Make certain the employees know the correct
use and maintenance of the equipment
– Enforce its use
38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• PPE is protection of last resort.
• PPE should be selected appropriately.
• PPE use is required by law in some
situations.
• Employees must be consulted, trained,
supervised in the use of PPE and must
be aware of hazards.
• PPE must be properly fitted, tested,
cleansed, maintained and stored.
• Comfortable PPE will ensures its use.
39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Objective &
Programme
1
Learning Objectives
• To list 4 purposes of OSH Programme
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Planning an OSH Programme
• Begin with:
1. Goals of the organisation written in the
policy
2. Legal and other requirements
3. Identified hazard and risks
• Prioritise the needs of these requirements
and set objectives and target for the
organisation to achieve
• Set objectives and targets
• Create action plans with timelines and
responsibilities for completion
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Plan for Legal and Other
Obligations
1. Identify legal requirements:
Identify which regulation applies e.g.
– SHO Regulations 1997, SHC Regulations
1996, CIMAH Regulations 1996, USECHH
Regulations 2000
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Action Plan for
OSH Arrangements
• Identify how to measure success of the
programme (performance indicators)
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes
• General responsibility
– Top Management
• Overall responsibility
• Provide resources to implement the policy
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes
– Employee
• To cooperate
• Obey rules and regulations
• Reporting
• Involvement in consultations
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities for the
Implementation of OSH Programmes
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• The provision of systems of work:
– Procedures, training and supervision
• Include procedures for contractors and visitors
– First Aid
– Emergency preparedness
• Including evacuation drill and emergency
exercises
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• Arrangements for use or operation,
handling, storage and transport of
plant and substances:
– Assessment
– Hazard / accident reporting
– PPE
– Showers
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• Provision of facilities for welfare of
employees:
– Cafeteria
– Showers
– Toilets
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
OSH Programmes
• Implementing Risk Control:
– Prioritises risk reduction programme
according to the hierarchy of control
– Establish “System Of Work” if administrative
control measures are required
– Inform and train affected employees before
Implementation of control measures
– Information and training is important
especially when there is a "decision to
change"
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
• A formal procedure to minimise
remaining risks
EXAMPLES WHERE REQUIRED, IN
PARTICULAR,
– Cleaning and maintenance operations,
– Working alone.
– Breakdowns.
– Emergencies.
• Implementing
– Identify required safe working procedure.
– Write safe work instructions
– Provide training
– Ensure supervision
– Monitor effectiveness of control measures
and act accordingly
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
Permit-To-Work Required
• Electrical work, especially at higher
voltages
• Entry into confined spaces e.g. vessels
• Excavation work or demolition activities
• Presence or possible release of
– Ionising radiation, or flammable gases, liquid
or dusts (possible risk of ignition by hot work,
electrical or electrostatic sources)
• Lone working in hazardous environments
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
Permit-To-Work
• Documentation:
– Written authority, e.g. to carry out
maintenance in a confined space
– Issued by authorised person
– States job risk has been assessed
– Details safety precautions
– Authorises the work
– Permanent record of precautions taken
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work
Permit-To-Work
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safe System of Work –
Lone Working
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Importance of Human
Factors
• Human factors can lead to accidents:
– General health and fitness
– Complacency
– Fatigue, Boredom
– Rushing (cutting corners)
– Panic in emergencies
– Over eagerness (not following procedures)
– Inter-group relationships
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• All levels of management must be
responsible for managing
occupational safety and health in the
workplace.
1
Learning Objectives
• To define what is an emergency
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Recognising an emergency
• Emergency management
• Emergency planning
• Emergency mitigation and resources
• Procedures
• Incident control and facilities
• Training & exercises
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Emergency
• Accident – unexpected event which cause
damage @ harm. Happens by chance
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Tiram Kimia Tragedy
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Prepare for an
Emergency
• There are unaccounted,
unplanned & unexpected event
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Prepare for an
Emergency
• Regulatory and Industry requirement –
e.g. CIMAH Regulations 1996,
“Responsible care” OHSAS 18001, ISO
14000, etc.
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Stages of an Emergency
1st Emergency Level
Trigger
escalation? End of
incident emergency
trigger
minutes hours days months
PRE-EMERGENCY EMERGENCY
RECOVERY
EMERGENCY
LEVELS
Time
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Emergencies
• Depends on severity of the incident and
capability of the organisation
• Level 1
If within the capabilities of the organisation
• Level 2
If external assistance is required: mutual
aid, district or other agencies. MKN
Arahan 20 may apply.
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Levels of Emergencies
• Level 3
State or National Disaster. MKN Arahan 20
takes over.
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Goals of Emergency
Response
– Control, Reduce or stop the cause
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Objectives of Emergency
Response
– Save lifes
• Prioritise Rescue and First Aid
• Rescuers must not be put to risk
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Basic Elements of
Emergency Preparedness
and Response Management
1: Organise emergency management team
2: Identify the accident scenarios and emergency
consequences
3: Identify resources, equipment and facilities
4: Develop plans and procedures
5: Train, drill and exercise
6: Review system
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Emergency Management
Organisations
Emergency
Management
Commitment
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Emergency Management
Coordinator and Tasks
Emergency Management Committee
– Ensure preparation, implementation and
evaluation of EPR
– Work with coordinator
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Incident Command Organization
(Based on Incident Command System)
Incident
Commander
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
1.Incident Command
Operations Teams
• Depends on the organisation, activities and
products. For example:
– Most organisations will need a team of :
• Fire fighters
• Evacuation rescuers
• First Aiders
– Hazardous chemical plants:
• Chemical or oil spill team
– Process plant:
• Shut down team
• Rescue team
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Emergency Planning
Threat and hazard identification
– Use imagination; think of the unexpected
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Emergency Planning
Plan For Emergency Mitigation,
Preparedness, Response And Recovery
23 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Types of Potential Hazards
Natural events
– Storms, earthquakes, floods, etc.
Technological events
– Mechanical problems (ruptured
pipes, metal fatigue), chemical spills,
aircraft crash, fire, explosion, etc.
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2.Types of Potential Hazards
Human events
– The wrong valve was opened,
miscommunication about what to do,
etc.
– Sabotage, terrorism
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Other Hazard
Considerations
• Quantity of hazardous materials
• Location of hazardous materials
• Location of isolation valves
• Special fire fighting requirements
(oil, chemical) if any
• Special handling requirements
(e.g. radio-active, pathogens)
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Hazard Consequence Analysis –
For Emergency And Recovery Plans
• What hazards are most likely to occur
• What functions or services are affected
• In what way the functions could not be
performed following a disaster
• What are the critical functions
• What actions will protect them
• What functions has to be restored quickly
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Potential Impacts of
Hazards
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Potential Impacts of
Hazards
Legal
– Regulatory and contractual obligations
Business
– Continuity of operations and delivery of services
– Property, facilities, and infrastructure loss
– Reputation of the organisation
– Economic and financial condition
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Emergency Plans Must
Comply With Legal and Other
Requirements
Examples of requirements are:
– OSHA 1994
– CIMAH Regulations 1996
– Environmental Quality Act 1974
– Voluntary Standards
• Disaster/ Emergency Management Standard (Incident
Command System, FPA 1600:2000)
– Industry Practice
• “Responsible Care”
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Emergency Plan Strategy
• Emergency plans should be capable of
dealing with the worst case credible
scenario
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Emergency Plan Strategy
• Plans should also be sufficiently flexible to
ensure that an emergency response can be
varied according to the severity of the
incident
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Recovery Strategy
• Objective is to restore functions as
early as possible
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Recovery Strategy
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
2. Mitigation Measures
• Interim and long-term - to eliminate or
reduce impact of hazards that cannot be
eliminated.
– Access, escape routes and shelters
– Early Warning - Establishment of hazard warning
and communication procedures
– Materials – removal, reduction, modification,
segregation or elimination
– Heat, fluids, etc. - protective systems,
redundancy, control of rate of release
– Structures - building construction standards
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Resource Planning
• Based on identified threats and hazards
– Fire, flood, explosion, spills, collapse
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Resource Planning
37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Identify for Each Threat or
Hazard
Resources and logistics
– Personnel, training, expert knowledge,
materials
– Available in a timely manner and have the
capability to do its intended function
– Quantity, response time, operability
38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Identify for Each Threat or
Hazard
Equipment and Facilities
– Fire fighting, heavy equipment, medical supplies
Miscellaneous
– Food, clothing and shelter for evacuees, religious
personnel, volunteer and social/political groups
39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Emergency Facilities to
be Made Available
• Command posts
– Identified, equipped, tested, and maintained
– Operations manual
40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Emergency Facilities to
be Made Available
• Where needed, toxic and explosive gas
detectors, wind indicators
41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Regular Tests of
Emergency Equipment and
Facilities
• Check and document alarm system
frequently
42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Immediate Strategic
Plans
• Identification of vital personnel (core
team), systems, operations, and
equipment
43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
3. Immediate Strategic
Plans
• Acceptable downtime before restoration to
a minimum level
44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Plans
Written Plans
– Strategic
– Operations
– Mitigation
– Recovery plans
Lines of authority
45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Procedures
• Alarms, call out and notification
• Communication - internal, authorities,
public
• Employees - escape, etc.
• Evacuation - community
• Coordination with other parties
• Recovery
46 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Emergency Operating
Manuals
• For reference during an emergency
• Who does what, information and data
• Balance between overview and detailed
response
• Need to know, nice to know
• Sound understanding enables flexibility
• Simple language
47 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Finance and
Administration
• The organization should also develop
financial and administrative procedures to
support the emergency management
programme before, during, and after an
emergency or a disaster.
48 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Finance and Administration
49 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Incident Procedures
• Control of access to the area
50 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
4. Incident Procedures
51 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Disaster Recovery
Activities
• On-site damage assessment and
purchasing
• Incident investigation
52 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Disaster Recovery
Activities
• Clean-up and restoration
53 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Training
Familiarisation
– Manual Familiarisation, Specific Courses
(chemical fire, rescue, decontamination,
Media etc), Exercise Observer
54 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Training
Personal readiness
– Know the fundamental Role
– Know your way around the manual
– Have your personal aids ready
– Know the early actions well
– Ensure alternate is ready
55 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Exercises and Drills
Types and subjects
– Types: Simulated, “Real”
– Subjects: Operational, Security, Commercial
Drills
– Evacuation
56 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
5. Evaluation
• Plan should be reviewed annually and
updated as necessary
• Be re-evaluated when:
– There are changes:
• Regulatory, New hazards are identified or existing
hazards change
• Resources or organizational structure change
– After tests, drills, or exercises
– After disaster responses
– Infrastructure changes
57 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Organise emergency management
team
• Identify the accident scenarios and
emergency consequences
• Identify resources, equipment and
facilities
• Develop plans and procedures
• Train, drill and exercise
• Review system
58 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First Aid
2 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Reasons for providing First-Aid
• First-Aid facilities
• Training
3 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Is First-Aid
4 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Aims of First-Aid are to:
• Preserve life
• Stop the condition becoming worse
• Protect the unconscious
• Promote recovery and
• Relieve pain and suffering
• Compliance with Factory and Machinery
(Safety, Health and Welfare) Regulations
1970 (Reg. 38) and OSHA 1994 (Section 15(1)
5 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Needs First-Aid
A person who:
– Requires immediate attention
– Whose injury would not need treatment by
a medical practitioner or nurse
– Minor injuries who would otherwise
receive no treatment
Note:
All injuries however minor should be treated,
otherwise it might lead to infections leading to
lost time illnesses.
6 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Response
7 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Response
8 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles Of First-Aid
IDENTIFICATION
9 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles Of First-Aid
ASSESSMENT
• The type of work being carried out and its
level of hazard
• Work away from the employer's premises.
• Consequences
• Availability of other places of treatment (are
there hospitals nearby?)
10 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles Of First-Aid
CONTROL
• Provision of first aid facilities and services
11 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Worker Exposure
12 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level of Preparation –
Depends On Risk
• Planning is important for high risk places of work, such as:
– Workplaces which use or manufacture hazardous
substances
– Workplaces where hazardous processes may be used
(e.g.abrasive blasting);
– Construction sites;
– Where heat is used as part of any process (e.g.
working in foundries or welding and cutting); and
– Workplaces which require people to work in remote
isolated areas (e.g. agricultural or transport industry).
13 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Level of Preparation –
Depends On Risk
• If has potential for mass casualties provide:
– Safe place for evacuation
– Equipment e.g. stretchers, wheelchairs, etc.
• For hazardous substances and poisons
– Procedures, training and PPE for handling
• Antidotes in first-aid box, e.g. for cyanide and
procedure for using it, if necessary
– To be administered only by trained first aider
14 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A First-Aid Program
• Properly trained and designated first-aid
personnel on every shift,
• A first-aid manual,
15 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
A First-Aid Program
16 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
17 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
• Plan first-aid in conjunction with the
emergency response plan. (Especially for
major hazard facilities (MHF)
18 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
Matters to be determined having identified
hazards and assessed the risks at the
workplace are:
• The number and location of first aid box
• Their contents
• The number of employees to be trained in
first aid
• The level of training
• Possible need for a first aid room and
equipment it should contain
19 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
• Number of first aider
•The numbers of employees.
•The distribution of employees
•Number of shifts
•The nature of the work (type of industry)
•The size and location of the workplace
•The distance from outside medical
services
20 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Consideration
21 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Boxes
22 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Boxes
• Place of work injury instructions in or near to
box
23 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Boxes
• List content and its quantity to facilitate
replenishment
25 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Room
• When more than 150 employees
26 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First-Aid Room
• Easy to clean
27 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Stretchers
28 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Stretchers
29 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Training For All Employees
• Location of first aid boxes/rooms
• Universal precautions
30 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
First Aid Training
LEVEL I
– BASIC FIRST AID (emergency first aid procedures).
LEVEL 2
– WORKPLACE FIRST AID (Level I plus treatment of
injuries and illnesses, eg heart attack, fainting).
LEVEL 3
– OCCUPATIONAL FIRST AID - (Level 2 plus broad
understanding of hazards, emergency care &
assessment)
31 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• First-aid is for preserving life and preventing
conditions of accident victims from
worsening
32 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• First-aid programme consists of:
33 @2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Procurement And
Contractor
Management
Safety and Health Officer
Certificate Course
1
Learning Objectives
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Procurement, leasing and contracting
• Contractors and why manage them
• Elements of procurement and contractor
management
Step 1 - Policies
Step 2 - Planning
Step 3 - Select contractor
Step 4 - Clarify contract
Step 5 - Orientation and training
Step 6 - Control of work activity
Step 7 - Post contract evaluation
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Manage Procurement
• Liability
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Manage Procurement
– Procured services (from contractors) is
equally important because OSHA 1994
defines contractor and subcontractor as
organisation’s own employee
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 1:Procurement Policy
• Procedures for incorporating and evaluating
OSH into purchasing, leasing including pre-
qualification of contractor
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 2 : Procurement
Management Planning
• Ensure before commencing work and at all
stages of contracting
– Identify hazard and risks and inform contractor
(also include in tender document and priced)
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 3: Evaluation of Contractor
Safety Performance
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 4 - Clarify Contract
(Pre-Mobilisation Meeting)
• Contractor prepare OSH plan
• With Contracting Officer, Project Officer,
and SHO
– Reviewing safety requirements
– Discussing implementation of all health and
safety provisions
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 5 - Orientation and Training
• Safety orientation should include a review
of:
– General safety rules and regulations
– Emergency reporting and response procedures
– Work permit procedures
– Physical and chemicals hazards, on site (fire,
explosion, and toxic release type hazards)
– Other day-to-day issues
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Step 6 - Control of Work Activity
OSH Monitoring
• Reporting requirement
• Contractor
– Removal of all wastes, materials, tools and
equipment
– Site clean-up and restoration
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Incorporate OSH in procurement.
• Fulfil requirements before use of materials or
awarding contract (Pre-qualify contractors).
• Involve contractors in assessing risk of their
respective jobs and integrating them into
common safety management system.
• Enforce, coordinate, monitor and evaluate
arrangements.
• Keep register of contractors.
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditing
1
Learning Objectives
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Importance of auditing
• Differences between Inspection,
investigation and auditing
• Principles of auditing
• The audit activities
• Activities during an audit
• Preparing an audit report
• Concluding an audit
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Definition
• An OSH audit is a systematic, independent and
documented examination to determine whether
activities and related results conform to planned
arrangements and whether these arrangements
are suitable , effective and adequate implemented
effectively and are suitable for achieving the
organization's policy and objectives.
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Audit?
S • Systematic
I • Independence
D • Documented
Audit:
Systematic, independent and documented process for obtaining
audit evidence (3.3) and evaluating it objectively to determine the
extent to which the audit criteria (3.2) are fulfilled.
(Source: MS 1722: Part 1:2005)
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What we are looking in
Audit?
• Establish
Suitability Adequacy
• Document
Effectiveness
• Implement
• Maintain
• Continually Improve
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditing is a Management Tool
• Originally applied to finance and
accounting to instill shareholder confidence
• It evaluates:
• Are procedures in place, Are people aware
of them, Are they being abide to?, Are they
adequate? Are there anybody
accountable?
• How well the management system is
functioning
• OSH auditing is important for the same
reason
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditing Versus Inspection
• Audits are for organisations (not on
individuals) (long-term plans)
• Evaluating companywide health and safety
controls and management system
• Inspection are for things (short -
medium-term)
• Identifying equipment or condition in a
workplace for corrective and preventive action
• Investigation are for situations (ad hoc)
• Inquire into a situation or problem in order to
discover the root cause e.g. of an accident
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection Sets Standards on
Hardware Aspects
Health
• Drainage, lighting, ventilation; cleanliness
and overcrowding
Safety
• Guarding, hoists, lifts; ropes, cranes, access,
floors, stairs; fire prevention means of
escape
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection Sets Standards on
Hardware Aspects
Welfare
• Washing facilities, accommodation and first
aid
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Inspection is Part of Auditing
Method
Interviewing
Observation
Reviewing
Inspection
Auditing and
Investigation Sampling
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Audits
First party: Auditing own organization
(internal audit)
Second party:Auditing a contractor,
supplier, etc.
Third party: Independent consultant or
Certifier audits of an
organization
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Types of Audits
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Effectiveness Depends on
Management Support
• Management authorise
– An audit policy and programme
– Responsibility, competent auditors, the
audit scope, the frequency of audits, audit
schedule, audit methodology and reporting
– Periodic audits to determine if OSH-MS
are in place, suitable, adequate, and
effective
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Auditing
4. Thoroughness of work to ensure fair
presentation of audit findings and
conclusions
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Process
Initiating the audit
Appointing
audit leader,
Audit definition,
Audit feasibility,
audit team, contact
On-site audit
activities
Document Review opening meeting,
Review documents Communication, Audit Report
and records, Roles and the Prepare, approve,
Determine adequacy distribute
responsibilities,
(Create checklist)
Collecting and
verifying
information, Audit Completion
Preparing For Audit Document
audit findings, retension,
Preparing the audit
plan, conclusions, finalise audit
Assigning work to the closing meeting
audit team,
Preparing work
documents, audit Follow -
notes Up
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditors
• Made up of one or more persons
(manday).
• A team approach:
– Widens involvement, improve co-
operation; allow more specialist skills to
be utilized.
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Auditors
• Auditors should be independent of the
part of the organisation or the activity
that is to be audited.
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Objective, Scope and
Philosophy of Auditing
may vary as follows
Purpose: Meeting legal obligations
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Objective, Scope and
Philosophy of Auditing
may vary as follows
Scope: Individual Facilities and
Operations
Criteria: Legal requirements
24 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for On-site Audit
Activities
3. Prepare work documents
– Forms, checklist, etc.
25 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing the Audit Plan
• Protocol
– A written step-by-step guide for
accomplishing the audit
26 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing the Audit Plan
• Information Required
– e.g. list of major hazardous chemicals and
applicable MSDS for those chemicals
27 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Conducting On-site Audit
Activities
1. Conducting opening meeting
28 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Conducting On-site Audit
Activities
4. Preparing audit conclusions
29 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Opening Meeting and Audit
Preliminaries
• Introductory meeting with managers
30 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Opening Meeting and Audit
Preliminaries
• Availability of facility
31 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Activities as Scheduled and
Planned
• Document Review
• Inspection
• Interviewing
• Sampling
• Observation
• Communicating
32 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Collecting Audit Evidence
• Collect audit evidence through:
– Interviews, examination of documents and
observation of activities and conditions
– Indications of nonconformity to audit criteria
should be recorded
• Ensure:
– Representative sample of essential activities are
audited
– Relevant personnel are interviewed
– Relevant documentation examined
33 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Subject Audited –
Plant Maintenance, Repair and Alteration
• Criteria • Examples of verification
There is a Maintenance schedules in accordance
scheduled with manufacturers guidelines and
maintenance legislative requirements
program for Detailed inspection procedures for all
plant and relevant items of plant and equipment
equipment. including timetables, checklists etc.
Log books or other records that indicate
when service or maintenance is due
Records of maintenance in accordance
with schedules
34 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Document Inspection
Techniques
• Consistency with policy
• Cross checking with regulations
– Review existing and pending standards,
legislation, permits etc.
• Detail review of selected portion
• When reviewing permits, etc.
– Date of last entry
– Status of permits
– Signatory
35 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Interview Strategy
• Ask the 5 “Ws” and the one “H”
– What, Where, When, Why, Who and How
36 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Findings
• The audit team should review all of their
audit evidence to determine where the MS
does not conform to the MS audit criteria.
• Ensure that findings of nonconformity are
documented in a clear, concise manner and
supported by audit evidence
• Review audit findings with the responsible
auditee manager to obtain
acknowledgement of the factual basis of all
findings of nonconformity
37 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Closing Meeting
• Formal meeting where minutes of the
meeting and attendance are taken
• To present the audit findings and
conclusions
• Attendees include the auditee but
can also include the client and other
parties
38 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Closing Meeting
39 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Audit Report
• The content of the final OSH Audit
Report should be:
– Clear
– Precise and
– Complete
• It should be dated and signed by the
auditor
40 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of Audit Report
1. Audit objectives and scope
2. Audit plan
3. Identification of the auditing team
4. Audited representatives
5. Dates of audit
6. Identification of the areas subject to
audit
41 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Contents of Audit Report
7. The identification of reference documents
used
8. Details of identified non-conformances
9. Assessment of conformity with standards or
guidelines
10. The ability of the OSH-MS to achieve its
objectives
11. Distribution of audit report
42 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Conducting Audit Follow-up
• Audit conclusion can point to corrective,
preventive and improvement actions
• Such actions are not part of the audit and
are undertaken by auditee within an
agreed timeframe
• The auditee should keep the audit client
informed of the status of these actions
• The completion and effectiveness of
corrective action should be verified
43 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Audit is a management tool that assesses
the organisation.
44 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Before an audit is undertaken plans
that include document review and
other preparations are undertaken.
45 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Performance
Measurement &
Monitoring
Safety and Health Officer
Certificate Course
1
Learning Objectives
• To state the importance of
performance measurement and
monitoring
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Incident?
• Incident is:
– an unexpected
– unplanned event in a sequence of events
– that occurs through a combination of causes
– which result in:
• physical harm (injury, ill-health or disease) to an
individual
• damage to property
• a near-miss, a loss
• any combination of these effects
4 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Bother with Performance
Monitoring and Measurement?
• Performance monitoring and
measurement is like driving at night
– No headlights than you know you’re moving
but do know what you will crash into
– No map you might see your way but not know
where you are going to
• Required by regulation:
– Safety and Health Officer Regulations 1997,
USECHH Regulations 2000, etc.
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Performance Monitoring
Can Do
• Developing strategies in preventing incidents
• Recorded details provide a broad picture of
events
• The database can be analysed for info on:
– the most common types of incidents and the
factors that caused it
– the trend in safety performance
– benchmarking performance against other
workplaces
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What You Need To Do
• Monitor:
– if organisation’s objectives are met
– compliance with OSH programme and
regulatory requirements
– Effectiveness of control
– Proactive and reactive measures
– incidents, ill health, near-misses
– environment (noise, fumes, etc.)
– medical / Biological (Lead, etc.)
• Determine how to reliably measure these
• Responsibility and authority for monitoring
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Ways of Measuring Performance
• Proactive (use measure for prevention) -
• Compliance (towards legal requirement --
Regulations, Codes of practice, Guidelines)
• Activity (training, safety meeting, inspection)
• Reactive (use measure for correction) -
• Near misses, injury, plant damage, etc.
• Qualitative & quantitative analysis e.g. fatality
rates, incidence rates
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Disadvantages of Reactive
Measures
• Traditional performance measures have
been reactive measures
• They measure failure to prevent incidents
rather than “safeness”
• Useful for measuring deficiencies and
deviations
• These measures are very dependent
upon good reporting (e.g. near misses)
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Reactive (Traditional)
Performance Measures
10
Traditional Performance
Measures
Number of accidents
– Stated as Lost Time Injury (LTI) for workers
away from work for 1 day or more (used
by SOCSO)
– A better measure is to include near misses:
• No. of Accident+No. Of (incidents or near
misses)
• Difference between an accident and an
incident is quite often “luck”
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
Incident Rate:
– Workplace with less LTI does not mean it is
safer than the one with a higher number if it
has less workers
– The number of undesired events for each
one thousand persons' working at that
location eliminates this problem
number of incidents
Incidence Rate 1000
annual average employment
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
Frequency Rate:
– The incident rate measure is a good measure for
comparisons between two locations
– However this is less accurate if the number of
hours worked by each person is different
– The frequency rate is a better comparison
especially between similar work locations
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
Severity Rate:
– The Incident Rate and Frequency Rate do
not indicate how severe the incidents are
– If the number of days lost are taken into
account as a measure of severity than the
severity rate will show the seriousness of the
incidents in the workplace
Severity Rate = Total Workdays Lost x 1000000
Total Hours Worked
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Traditional Performance
Measurement
• Fatality Rate:
– The fatality rate will show how many
deaths on the average are killed among
the people employed in the workplace
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Proactive Measurement
• This measurement is concerned with
the quantity and quality of activity in
ensuring safety
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Proactive Performance
Measures
• Percent of compliance to legislation
• Percentage of training completed
• Frequency of "walk through" and
“checklist inspections” carried out
• Number of corrective actions
completed on time
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Proactive Performance
Measures
• Availability of competent persons
• Frequency of emergency drills and
exercise carried out
• Speed of emergency response
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Presenting the Information
• The purpose of comparing and analysing
performance measures are to show
performance trend and to compare with
benchmarks
• Carry out analysis at plant level,
department level and at company level
• SOCSO does this at the national level
• Present for easy understanding, use
graphics
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Analysing and Presenting
Information
• Combination of measures present a
better picture
• Much information are best understood in
graphical form. Use:
– Pareto chart
– Bar Chart
– Histogram
– Gantt Chart
– Pie Charts
– Line Chart
– Cause and Effect Diagram
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Performance measuring and
monitoring is an important aspect of
management.
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• There are two types of performance
measures:
– Proactive measures indicate the quality and
quantity of activities to ensure a safe workplace
– Reactive measures are useful for measuring
deficiencies and the proactive measures
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident
Investigation And
Corrective Action
Safety and Health Officer
Certificate Course
1
Learning Objectives
• To describe the importance of incident
investigation
2 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Learning Objectives
• To explain 8 steps in incident investigation
3 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Overview of an Incident Investigation
• Corrective Action
4 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Incident?
• Incident is:
– An unexpected
– Unplanned event in a sequence of events
– That occurs through a combination of causes
– Which result in:
• Physical harm (injury, ill-health or disease) to an
individual
• Damage to property
• A near miss, a loss
• Any combination of these effects
5 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is a “Near miss”?
6 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Four Basic Types of Incidents
• Minor accidents:
• Paper cut occurs on finger, box of
materials dropped on toe
7 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Four Basic Types of Incidents
• Long Term
•Hearing loss, cancer resulting from
exposure to chemicals
• Near misses
8 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Accident Causation Model
An accident is the result of a sequence of an
immediate cause and an underlying cause
9 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
The Three Basic Causes of
Accidents
•Poor Management Safety Policy & Decisions
•Personal Factors
•Environmental Factors
Basic Causes
Unsafe Act Indirect causes Unsafe
Condition
12 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is an Incident Investigation
• A management tool by which:
– Work-related injuries, ill health, diseases and
incidents are systematically studied so that their
root causes and contributing factors can be
identified
13 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Investigate an Incident
• To prevent repetition of the same work-
related injuries, ill health, diseases and
incidents
14 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why Investigate an Incident
• Accurate record (for insurance, legal
prosecution, public enquiries)
15 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Should Investigate?
Depends on Severity of the
Incident
• Internal Investigation team
– Individuals involved
– Supervisor, Safety officer
– Upper management
– External consultants
– Members of the Safety and Health Committee
16 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Who Should Investigate?
Depends on Severity of the
Incident
17 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What & When to Investigate
• All serious and long-term incidents &
near misses
18 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Incident
Investigation
19 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Investigation
20 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Investigation
• Should:
– Be systematic and documented
– Be treated as urgent (to prevent productivity loss
and deterioration of evidence)
– Be objective (fact finding only)
– Find the underlying (root) cause(s)
– Identify failures in OSH management system
– Implement corrective action
21 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Principles of Investigation
22 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Be Prepared –
Before the Incident
• Identify who has the authority to investigate
and carry out mitigation action and
corrective action to completion
23 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Be Prepared –
Before the Incident
• Designated trained and competent
investigator
– Only be responsible for investigating
24 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
How Much to Prepare
Dependent on:
– The number and type of workplaces
– The equipment required to conduct the
investigation
– Ability for investigator to reach an
investigation site as soon as possible
– Geographical location
– Reliable transportation requirements
25 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Notification Procedure
• Notification:
– To management after an incident
– Initiated by the person involved
– Should be to his immediate superior
– To visitors and contractors
– Recorded
• Automatic system to notify investigator
• Include members of Safety and Health
Committee (if any)
26 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Investigation Procedure
27 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Investigation Kit Preparation
• Camera & • Clipboard, Pre-
Video Camera printed Forms
• Cassette Tape • PPE
Recorder • Containers for
• Flash and Batteries Taking and Storing
• Mobile Telephone / Samples
Walkie-Talkie • Barrier Tape
28 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities
• Employee
– Record in incident book (supervisor
checks)
• Supervisor / Manager
– Initiate risk control response: first-aid,
fence area, etc. other preventive action
– Inform SHO
29 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities
SHO
• Organise camera, tape and report form
• Check line management report
• Investigate if incident is serious and require to notify
authorities such as DOSH, DOE, Police, etc.
• Complete incident record form
• Summary report to Safety and Health Committee
30 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Responsibilities
Investigator
• Visit and survey incident scene
• Eliminate the hazards:
– Control of chemicals
– De-energise
– De-pressurise
– Light it up
– Shore it up
– Ventilate
31 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
On-Site Investigation Strategy
32 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Steps in Incident Investigation
1. Gather information
33 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Steps in Incident Investigation
5. Determine corrective actions
7. Analyze incidents
34 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information
• Time is of the essence
35 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information
36 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information
• Get preliminary statements as soon as
possible from all witnesses
37 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
People (Witnesses)
• One-to-one in private
38 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
People (Questioning)
• Strategic questioning - No leading
questions
• Obtain facts not opinions
• Ask What, Where, When, Why, Who and
How
• Get observation on events before, during
and after the incident
39 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
People (Questioning)
40 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Recording Interview
• Take notes without distracting the witness
41 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Recording Interview
• Differentiate what is directly observed and
what is hearsay and note accordingly
42 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Closing the Interview
• Identify the designation and qualifications of
each witness (name, address, occupation,
years of experience, etc.)
43 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Closing the Interview
44 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Position
• Document the incident scene before any
changes are made:
• Victim location
• Position of each witness on a master chart (including
the direction of view)
• Machinery, energy and chemical sources
• Other contributing factors
• Take photos, draw scaled sketches
• Record measurements
45 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Information -
Parts
• Around incident scene prior to, during or
after the incident that may have influence
• Materials, pieces of plant, tools, equipment,
buildings
• May require qualified person to examine or
comprehensive testing or sophisticated
equipment
• Reports by “expert witness." will form part of
the investigation evidence
46 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Gathering Evidence –
Paper
• Production schedules or process diagrams
• Check current working procedure
• Check qualifications
• Check training records
• Check corrective actions
• Check equipment maintenance records
• Check incident records
47 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Findings
• Isolate essential contributory factors
“Would the incident have happened if this
particular factor was not present?”
• Determine Causes
Employee actions, environmental conditions,
equipment condition, procedures, training
48 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Findings
• Find Root Causes. Ask:
49 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Determine Corrective Action
50 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Incident Investigation Report
52 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Corrective and Preventive
Action
• Preventive and corrective action should be
carried out for:
• Incidents
• Management system non-conformances
53 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Corrective and Preventive
Action Planning
• Procedure for handling investigation and
preventive and corrective action
• Identification and authority for personnel
handling investigation and preventive and
corrective action
• Authority for initiating and confirming the
completion of corrective action
54 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Implementing Corrective and
Preventive Action
56 Copyright 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management
Review
1
Learning Objectives
2 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Scope
• Role of management review in
management
• Role of safety and health committee in
management review
• Establishing a review committee
• What to review
• Responsibilities
• Corrective action and review follow-up
3 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What Is A
Management Review
• Management review is a process of
reviewing the organisations management
system, programmes and performance by
top management
5 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What is Involved in the Process
• Reviewing, evaluating or deciding on:
– Performance
– Implementation of policy and objectives
– Necessary changes to policy, objectives,
procedures, system of work , etc.
– Accommodating changes in regulation,
technology, standards or expectations
– Action plans for corrective action or
continual improvements
6 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Review and Evaluate
• Statistics and trends of accident, near-misses,
dangerous occurrence, poisoning or disease
• Results of internal/external audits/investigation
internal audit and evaluation of compliance with
applicable legal requirements and other
requirements
• Result of participation and consultation
• Relevant communication from external interested
parties including complaints
• OSH performance of the organisation
• The extent to which objective have been met
• Corrective actions carried out
7 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Review and Evaluate
• Reports of emergencies (actual/exercises)
• Status of incident investigations, corrective action
and preventive action
• Follow-up actions from previous management
reviews
• Changing circumstances, including developments
in legal and other requirement
• Recommendation for improvement
• Organisational changes and plant modifications
8 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
What to Review and Evaluate
• Reports of hazard identification, risk
assessment and risk control processes
9 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Why you must carry out a
Management Review
• Required by SHC Regulations 1996, CIMAH
Regulations 1996, etc.
• Plan, Do, Check and Act One of the elements
used in many management system standards:
• Management system standards never
mentioned the method of review, however the
current practices is through meeting
– MS1722:2011
– OHSAS 18001:2007 Occupational Health & Safety
Management System standard
– ISO 14001 EMS, ISO 9001 QMS
10 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for a Meeting
• Ensure the necessary information is
collected
• Relevant personnel prepare
documents, reports and analysis
for the meeting
• Documents should be collated by
the secretary (SHO) of the
committee
11 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Preparing for a Meeting
12 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Safety and Health Committee
Functions
• To assist in the development of
programmes and safe systems of work
• Review effectiveness of programmes
• Inspect workplace
• Report unsafe conditions and unsafe
acts
• Recommend corrective actions
• Investigate, any accident, dangerous
occurrence, poisoning or disease
13 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Frequency of Review
• Depends on organization's needs
and conditions.
• Standard mention review shall be
conducted at ‘planned intervals’
• Safety And Health Committee
Regulations 1996:
– Once every three months minimum; but
not necessarily review all items at every
meeting
14 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Frequency of Review
15 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management Review Meetings
must be Documented
• Minutes of the review
• Decision and actions related to possible
changes to;
– OSH Performance
– OSH Policy and Objective
– Resources; and
– Other elements of the OSHMS
• Revisions to the OSH policy and objectives
• Specific corrective actions for individual
managers, with target dates for completion
16 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management Review Meetings
must be Documented
• Specific improvement actions, with
assigned responsibility and target
dates for completion
• Date for review of corrective action
• Emphasis all the above in future
internal OSH management system
audits
17 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Management Review
Communication
• Observations, conclusions and
recommendations should be recorded
and formally communicated for
appropriate action to:
•The persons responsible for specific
tasks;
•The safety and health committee
(if management review committee is
different from the SHC);
•Workers and their representatives
18 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Continual Improvement
19 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Continual Improvement
• Continual improvement should take
into account:
•Result of risk assessment
•OSH objectives of the organization
•Outcomes of the management review
•The recommendations from SHC and
members of the organisation
•Results of performance monitoring
•Investigation and audits
20 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
• Management review is good
management practice as well as a
legal requirement.
• Management review ensure that
OSH policies and objectives are
achieved.
• Management review activities
should be documented.
21 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.
Summary
22 © 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be
reproduced without written consent of NIOSH Malaysia.