Project: Aqueduct Construction

Place:
Details of Measurment and Cal
S.N. Description of Work No. Length (m) Breadth (m)

Initial Site clearance work (shrubs


cutting undulated earth dressing
1 and lead up to 10m) 3.5 14.30 8.80

Earthwork in excavtion in
2 foundation in GBM Soil
i a) Central Pillar Straight Portion 1 1.80 0.50

b) Central Pillar triangular Portion 2 1/2*0.50*tan60*0.25


ii Intermediate Pillars 2 2.00 0.50

iii End Plllars (abutments) 2 6.20 0.50

iv for brick pitching at slopes of nala 2 7.40 1.84

for brick pitching at slopes and bed


of minor at starting and end point of
v aqueduct
bed 2 3.00 1.80
slopes 4 3.00 1.80
vI toe wall base under trough nala 2 8.80 0.20

Cement Concrete (1:4:8) in


3 foundation
i a) Central Pillar Straight Portion 1 1.80 0.50

b) Central Pillar triangular Portion 2 1/2*0.50*tan60*0.25


ii Intermediate Pillars 2 2.00 0.50

End Plllars (abutments with wing


iii walls) 2 6.20 0.50
Brick work In (1:4) cement sand
4 mortar
i a) Central Pillar Straight Portion 1 1.80 0.30

b) Central Pillar triangular Portion 2 1/2*0.30*tan60*0.15


ii Intermediate Pillars 2 1.80 0.30

End Plllars (abutments with wing


iii walls) 2 6.00 0.30
iv Toe wall 2 8.80 0.20

Deduction for trough cross


sectional area on vertical face of
abutments 2 1.8 0.30

5 RCC work for trough


Wooden formwork from setting to
i removal
inside base and wall 1 8.30 4.10
Outside base and wall 1 8.30 4.70
End faces of trough 2 4.40

Deduction:

Top area of piers and abutments


resting trough 5 1.80 0.30

ii PCC (1:2:4) for RCC work 1 8.30 4.40

Reinforcement bars of different dia


cutting bending tying and placing
iii as per map or instruction @ 1.00% 5.48 7850

Cement Concrete (1:2:4) on the top


6 of triangular portion of central pillar 2 1/2*0.30*tan60*0.15
Cement Pointing in (1:2) cement
7 sand mortar
Central pillar 10 cm below bed 1 4.80
Intermediate pillars 2 4.20
end pillar with wing wall 2 6.00

exposed triangular portions in entry


and exit point of trough 4 1.27
top of end wing walls 4 2.25 0.30

Deduction for clear opening of


trough considering end faces of
trough treated with mortar 2 1.5

8 Dry Brick Pitching on slopes

20 cm thick brick pitching at slopes


i of stream under aqueduct 2 7.40 1.84

10 cm thick brick pitching at slopes


and bed of minor at starting and
ii end point of aqueduct
bed 2 3.00 1.80
slopes 4 3.00 1.80

Cleaning the site after completion


9 of work
Date: 2074/12/13
Code: AQD 03/074/75
easurment and Calculation of Quantities
Height (m) Quantity Remarks

the area of site


clearnace is made 3.5
times to cater the
requirement of staking
of materials and slope
440.44 topography
Total 440.44 sqm

0.50 0.45

0.50 0.11
0.50 1.00

0.30 1.86

0.20 5.46

0.10 1.08
0.10 2.16
0.30 1.06
Total 13.18 cum

0.20 0.18

0.20 0.04
0.20 0.40

0.20 1.24
Total 1.86

2.10 1.13 H=0.30+1.2+0.6

2.10 0.16 H=0.30+1.2+0.6


2.10 2.27

2.15 7.74
0.30 1.06
Total 12.36 cum

1.45 1.57

Total 10.79 cum

34.03
39.01
0.15 1.32
Total 74.36 sqm

2.70
Total 71.66 sqm
0.15 5.48 cum

kg/cum 430.18
Total 430.18 Kg

1/3*0.15 0.004 cum


1.90 9.12
1.90 15.96
2.15 25.80

5.07 Area=1/2*1.3*(1.3*1.5)
2.70 L=2.1+0.15
Total 58.65

1.3 3.90
Total 54.75 sqm

0.20 5.46

0.10 1.08
0.10 2.16
Total 8.70 cum

1.00 integrated Job


Design

Liquid Capacity per user 0.1 cum


for 25 users 2.5 cum
Depth of tank 1.4 m
Base area 1.785714 1.8 sqm
Take L as 2.25 times of B LxB 2.25Bx B=1.8
B (1.8/2.25)^0.5
0.889
0.9
L 2.025
Free Board