Upah Fabrikasi agus sungkowo 336,158,200
Staf Komersial
1
No. Pekerjaan
sat. H.sat vol
1 fabrikasi Bekisting Bodeman Balok 1 m2 35,000 177
2 fabrikasi Bekisting tembereng Balok 1 m2 35,000 316
3 fabrikasi Bekisting Bodeman Balok 2 m2 35,000 106
4 fabrikasi Bekisting tembereng Balok 2 m2 35,000 374
5 fabrikasi Bekisting Bodeman Balok 3 m2 35,000 75
6 fabrikasi Bekisting tembereng Balok 3 m2 35,000 183
7 fabrikasi bekisting kolom m2 250,000 39
8 fabrikasi Bekisting Kepala Kolom unit 300,000
9 pengecilan kepalan kolom unit 50,000
10 fabrikasi Support Kolom unit 45,000
11 fabrikasi Brucket Kolom unit 120,000
12 fabrikasi Dinding ShearWall m2 250,000
13 fabrikasi Brucket Dinding unit 50,000
14 Fabrikasi begisting balkon unit 150,000
15 Loading Bekisting Balok Bodem Ke Truck 200,000
16 pembersihan lokasi m2 30,000 172
13 mei 2016 2 27 mei 2016 3 17 juni 2016 4 30 juni 2016
total vol total vol total vol total
6,206,550 - - -
11,053,000 - - -
3,699,850 - - -
13,073,550 - - -
2,632,000 50 1,750,000 600 21,000,000 -
6,394,150 390 13,650,000 100 3,500,000 -
9,720,000 129 32,250,000 90 22,500,000 -
- - 30 9,000,000 30 9,000,000
- - - - - -
- - 80 3,600,000 -
- - 20 2,400,000 -
- - 50 12,500,000 275 68,750,000
- - - -
- - - -
- - 8 1,600,000 6 1,200,000
5,160,000 - - -
57,939,100 47,650,000 76,100,000 78,950,000
5 14 juli 2016 6 29 juli 2016 7 12 agustus 2016 8
vol total vol total vol total vol
- - -
- - -
- - -
- - -
- 44 1,528,100 -
- 15 511,000 -
- 56 14,080,000 53 13,250,000
- 24 7,200,000 -
- - - - 84
- 120 5,400,000 70 3,150,000
- - -
- 91 22,700,000 -
- 20 1,000,000 -
- - 10
- 5 1,000,000 -
- - -
- 53,419,100 16,400,000
26 agustus 2016 TOTAL
total Vol jumlah
- 177 6,206,550
- 316 11,053,000
- 106 3,699,850
- 374 13,073,550
- 769 26,910,100
- 687 24,055,150
- 367 91,800,000
- 84 25,200,000
4,200,000 84 4,200,000
- 270 12,150,000
- 20 2,400,000
- 416 103,950,000
- 20 1,000,000
1,500,000 10 1,500,000
- 19 3,800,000
- 172 5,160,000
5,700,000 336,158,200