You are on page 1of 25
Ce a) <2 INSPECTION REQUEST Gilat IR No: GLBLD-CRCC:NR-EL.00083 vision 0 ie To: KEO ‘ate: February 28,2021 7 oar Cremona aE nar rene Rom unas Development Co, (UDC) Fat & Goud EO nematinsCorsuants RCS Inspection notce patos as specitedn contact documents a spacied In contact documents, mum 48 rs notco poids equed fr inspection) _a FV ene Nem povr tg an ELV apr 4D, TEN TO BE CHECKED! LocaTiont evel: scutn FLOOR ttew ToBestaRreD: IRE AAR POWERLIGNT AELV & ib Openings INSPECTION AND TEST PLAN (TP) ACTMIY SPECIFICATION RE. ‘APPROVED PROJECT SCHEOLLE ACTIVITY No. ORAVINGREF o-mo.ccr rho ¢ nt con bam pnd ‘and epoapeldebtiie SERVICES COORDINATED: Dwecanica, — ptecrricat On Ohvac ‘Clrevaross ‘sonarune process ov Proposed by Peer Sabet by Contactor Dare aerate T™Me 80a Noro sionnrURE Ane DACPLNE Choma’ Chasen! ChniSmenrd (Dinca wan” Creooncin Dieser Chang” Ehutintaet Ehuoeaca Epcos pane Bhecomsecoty — Eerta ranspot’ Etat Fstres Coie pet Contractor's @A1QC Reprosonatvo "We WORK TOE NSPECTED Is READY AND ALL REGURED SELF INSPECTIONS aND'TESTS NAVE BEEN CARRIED OUT AS PER AGREED QUALITY PLANS, IHETHOD STATEMENTS AND OTHER RELATED CONTACT DOCUMENT: The olowng documerts oe atached: Kiet Ebroingtsrccton ht? cnn heedtapeaunteness Chtes Name: Ata Some: rw Prosvon: QAIQC Manager Dato: Fobwary 28,2021 To: 10:00 AN ‘To’be comploted by KEO mee “Tne above works were inspected on [oT 05 [p07] | Iespectin satus oy Mant” Year hiecton ‘Comments eto jet to corporation ofall etd tbe esti ATTAHCO @ DSTRUMDON Rue OME tks HIG HUG HTH Im pete, Dlhurings . SHOP DRAWINGS ATTACH ANE oT Affaverd | COMIN NALLY KMarVCd Subs T 1D KAP) Var 4 NYAtou wm — Sido Ont ng 5- a Fackde LIGHTING PWU/S/ows AAR nor fli f PusTBCA on KEO Inspector's Name: tl Signature: “fe KEO Project Leader: 9/3/41 fj ‘The chocing and No Objection To Procedd by KEO Representatie shat Kf contractor of his obligation to perform the workin accordance with the Contract Documents. | RECEI 03 MAR 2021 oneen ONTROLLED RECEIVED By CONTRACTOR: (© KEO Intemational Consultants WALL, FATALE | Installation of PVC Conduits & GD (rere “ou ‘Accessories KEOW Inspection Checklist ae SIE Structure/Network "| INR Number: GI-BLD-CRCC-INR-EL-00053 Reference Drawing no. | GI-BLD-CRCC-SHD-FA-00008- | Date: 28-02-2021 003 & GI-BLD-CRCC-SHD-EL- i 0008-124 | Level/Location 3c/ 4 Floor MTIITP no. GL-BLO-CRCC-MST-EL.00001 No] Description — Accepted Remarks Yes | No | N/A A DocumentsiMaterial Approval 1 Check the latest Approved Shop Drawing is alge attached. ‘Check the material used in the installation is as per FE the approved material submittal ol ce B PVC Conduit -installation z 1 Confirm Complance with Approved Material Submitial. | 7 | 2 Confirm routing/layout complies with approved drawings. |v = \aos Confirm conduit postion and size as per approved shop, PEE EE Preis eee ere eee ree eee eee oe oe 4 Approved bending procedure applied. Te 5 | Conduils oe properly supported to avoid damage beter | casting i — - = Check joint connection falue/solvent} as perstancard. | 7 7 ‘Confirm installation of box and fitings as per approved | 7 ee = _| shop drawing. 8 Pull wie instaled in the conduit - a 9 Junction box should be pul every 12m span and where ‘more than 2 bends are requited thus include in floor slaby | | screed eae 10 ‘Check the cul ends of conduils are reamed fo remove | 7 rough edges. | a ‘Check for the expansion coupler installation as per the sile Vv | requirement. Comments: ‘Company MEP Contractor Main Contractor -CRCC Consultant-KEO | PIONEER Name Ahm hb Sign & Date: | : Arar [28 [224 ae ilo area ‘SMALL POWER LAYOUT OF ‘THIRD FLOOR." BUILDING 2 E B mC] fanaa {ear Z| ae Cor | ae was onsen "| [rel semeonen Zeer (© | awe mars oromner sien umave || [> [esac mF 7 evs Be cuir a A a sam: THIRD FLOOR LIGHTING CONTROL SYSTEM LAYOUT - BLILOING 3c afc Gran dar EON omnia VISTAS SECURITY ‘THIRD FLOOR INTERCOM SYSTEM LAYOUT - BUILDING 36 VISTAS SECURITY tla Ht gut ban ‘Ro FLOOR. nveRcon sysTeMLAvOUT (euLDING.3c)| : nee S| 82 alefele AE SE Ym I aero Dorm ‘as SGN at Soa eee cm elel?lel#lelelel= 86 87 eu dar sean VISTAS SECURITY A othe Bt ge ta ‘THIRD FLOOR PLAN EMERGENCY CENTRAL BATTERY SYSTEM LAYOUT (BUILDIN¢ Fm se TEKNOONARE | THIRD FLOOR PLAN [EMERGENCY CENTRAL BATTERY ‘SYSTEM LAYOUT (BULOING 36) Higacoges @) VISTAS SECURITY 7 pariverr mene shri’ ‘Ro FLOOR cory system LAYOUT THIRD FLOOR CCTV SYSTEM LAYOUT - BUILDING 36 i ae al H g $ fo sEMENT SYSTEM LAYOUT - BUILDING 30 z z 3 § 8 cs gz Fz TEGO Fob RRR aan Line i % ‘ea FIRE ALARM SYSTEM LAYOUT-TYPICAL ( 1ST-3RD ) € Sea 1100 sr, () ane oat eae eal = ‘BUILDING 3€-(1,2,3RD)TYPICAL FLOOR HEP BUILOER WORK a ssl is ore ome ge ee "Saat ra a a 2" ene eco ae | FIRE ALARM SYSTEM LAYOUT-TYPIGAL (ST-3RO ) SCALE 1100 age FIRE ALARM SYSTEM TYPICAL (asT-300) ‘un Se BA Be ae SMALL POWER LAYOUT OF THIRD FLOOR - BUILDING - 03C js apbesa init aia SCALE 1:100 ATAL FORMAT. E fen aomoewt suse (8 4 bane 480 sures aa RS RET SMALL POWER LAYOUT OF “THIRD FLOOR = BUILDING 3¢ LIGHTING LAYOUT OF. ‘THIRD FLOOR - BUILDING - 03 SCALE 1100 AT AL FORMAT ST RN ETAT ‘fisercuwcwnd (RR |e | a [7 fer earewn » wo |x| see fo} saceren | cnocen|ite i ees e wane sc noon waves | 7 | 47 Pea eee conoorwroag |? | + Weectaniason “WIRD FLOOR - BUILDING 3 seat RE] fo | — = 7 [ene neon cea samen vmaone || [> [sewer nse re mee Pinna ne come nar 6 Za sas: 8 ite ann Comoe - i = dar KEOW VISTAS SECURITY IRD FLOOR “THIRD FLOOR LIGHTING CONTROL SYSTEM LAYOUT - BUILDING 3c |ictmns contmoL srsten LavoUr SOME . (OULDING 3c) + ae Taare VISTAS SECURITY “e ‘THRO FLOOR INTERCOM SYSTEM LAYOUT “BUILDING 30) pal AS SOA Paneer Ba 34 85 be £ 28 dar seaman VISTAS SECURITY pees rpereannny "THIRD FLOOR PLAN EMERGENCY CENTRAL BATTERY SYSTEM LAYOUT (BUILDING -2C) ‘SCALE ak "HIRD FLOOR PLAN EMERGENCY CENTRAL BATTERY Ee se TEKNOWARE ‘SYSTEM LAYOUT (BUILOING 0) » |n)> FE {[ufi er 82 a3 a4 yo 7 : = = =e pe amc ee | a erie) al ae rae i as =e pS Th woh ae a oe : " ny il 7 by] Mas lS ANd Ka + = zi 3 en ] AN hs LB hen ‘ : LAF 2) ax a dar as en | ete ree r kKEOW THIRD FLOOR DATA & TELECOM SYSTEM LAYOUT - BUILDING 30 ‘SCALE 1100 VISTAS SECURITY Ata gut tae ‘iano FLooR (ONTA. TELECOM SYSTEM LAYOUT (euic Bc SYSTEM LAYOUT - BUILDING 3¢ SCALE THIRD FLOOR BUILDING MANAGEMENT SYSTEM LAYOUT - BUILDING 3c

You might also like