Professional Documents
Culture Documents
Project
Date: Kind of Design System
Moderation: FMEA: Design Sub-System
Design Component
Supplier: FMEA contact person: Design Interfaces
(Name, address)
System/Subsystem/Compont/Process:
1 System description
Angabe in % Max Status
1.1 Is a Block Diagram (Boundary Diagram) available 1
1.2 Have the system boundarys and system influances been described sufficiently 1
1.3 Have the components within the System been termed sufficiently 1
1.4 Have the interfaces between the components and to outside been termed sufficiently 1
1.5 Have the relations between all components and interfaces been termed sufficiently 1
2 FMEA Header
2.1 Have Dates (Orig./Revision) and Numbering / File No. been fixed 1
3 Functions
3.1 Have functions been defined clearly: verb, noun, with measurables 3
3.3 Have all functions proposed in the Kautex-Textron Matrix been considered 2
4 Potential Failures
no function
partial function
intermitten function
unintended function
function degraded over time
6.2 Has every pot. cause of failure been listed and assessed separately 5
7.1 Have preventisons been identified sufficiently for each pot. cause of failure 7
7.2 Has the occurence been rated > 6, when no preventions have been identified 2
7.3 Have detections been identified sufficiently for each pot. Cause of failure 7
7.4 Has the detection been rated with 10, when no detections have been identified 2
8 Ratings
8.2 Have Sev., Occur. and Detec. been rated according to the rating tables of 1
QS9000, VDA4.2 or Kautex-Textron
9 Recommended Actions:
9.2 Have completion dates and responsibilities been defined for each 2
recommended action
9.3 Have recommended actions been finalized and the RPNs revised 3
Status in % 0
Comments