Author: S. Ahmadian
Approved: E. Jahedi
-2-
Introduction
Niroo Pajooh Shargh Co received a set of GE-F5 2nd stage nozzle from Gheshm
Movalled Co. for inspection and repair.
This report details the initial condition of the components in as received condition.
-3-
Table of contents
-4-
1. Incoming Inspection Report
IDENTIFICATION INFORMATION:
1. Material: N155
2. Is the heat treatment required? YES No
3. Applied coating? YES No
REMARKS:
Technical Engineer:
Date:
Approved by:
-5-
1. Work Scope
GE-F5 Second Stage Nozzle Work Scope
1.7 Penetrant test for crack detection 2.2 Removal of corrosion and/or oxidation products
1.11 Reporting and evaluation of damage extend 2.6 Remove damaged seal teeth
1.12 Removal of cracks and crack indication 2.7 Replace wheel space seals
1.13 Grinding of corroded and/or eroded surface 2.8 Grinding seal teeth to dimensions
Straightening of bowed trailing edges and distortion, if Check and repair diaphragm packing screw
1.14 2.9
necessary threads
1.19 Build up nozzle horizontal joint faces 3.4 Final dimensional inspection
-6-
2. Metallographic Inspection
AS-RECEIVED MICROSTRUCTURE
200X
400X
-7-
3. Dimensional Inspection
MS 5001 – 2nd Stage Nozzle (5028)
Nozzle Ellipticity Check
Incoming
-8-
4. Typical Defects
-9-
Crack on airfoil and side wall of Nozzle
- 10 -
Crack on airfoil and side wall of Nozzle
- 11 -
Crack on airfoil and side wall of Nozzle
- 12 -
Crack on airfoil and side wall of Nozzle
- 13 -
Crack on airfoil and side wall of Nozzle
- 14 -
Crack on airfoil and side wall of Nozzle
- 15 -
Crack on airfoil and side wall of Nozzle
- 16 -
Fretting & FOD on diaphragm seal
- 17 -
Fretting & Wear on diaphragm seal
- 18 -