Professional Documents
Culture Documents
Final GE-F5 Liner Gheshm 1401-03 5029
Final GE-F5 Liner Gheshm 1401-03 5029
Author: S. Ahmadian
Approved: E. Jahedi
-2-
Introduction
Niroo Pajooh Shargh Co. received a complete set of GE-F5 combustion liner,
retainer and cross fire tube from Gheshm Movaled Co.for inspection and repair.
This report details the initial condition of the components in as received and
after repair process.
-3-
Table of Contents
9. INSPECTION REPORT.............................................................................................. 35
-4-
1. Serial List of components
SERIAL
NO
NUMBER
1 5029 N1
2 5029 N2
3 5029 N3
4 5029 N4
5 5029 N5
6 5029 N6
7 5029 N7
8 5029 N8
9 5029 N9
10 5029 N10
-5-
2. Incoming Inspection Report
IDENTIFICATION INFORMATION:
1. Material: Hastelloy X
2. Is the heat treatment required? YES No
3. Applied coating? YES No
4. CRACKS: can not seen low medium heavy special
5. FOD: can not seen low medium heavy special
6. CORROSION/EROSION: can not seen low medium heavy special
7. BREAK OFF: can not seen low medium heavy special
8. DEFORMATION: can not seen low medium heavy special
9. WEAR: can not seen low medium heavy special
REMARKS:
7# of combustion liners collar replaced because of wear and low thickness of them.
Technical Engineer:
Date:
Approved by:
-6-
Order no: Part: GE-MS 5001 retainer
Costumer: Gheshm Movaled Co. Quantity: 1 Set (20 pieces)
Contract No.: 1024
IDENTIFICATION INFORMATION:
1. Material: Carbon Steel
2. Is the heat treatment required? YES No
3. Applied coating? YES No
4. CRACKS: can not seen low medium heavy special
5. FOD: can not seen low medium heavy special
6. CORROSION/EROSION: can not seen low medium heavy special
7. BREAK OFF: can not seen low medium heavy special
8. DEFORMATION: can not seen low medium heavy special
9. WEAR: can not seen low medium heavy special
REMARKS:
Technical Engineer:
Date:
Approved by:
-7-
Order no: Part: GE-MS 5001 cross fire tube
Costumer: Gheshm Movaled Co. Quantity: 1 Set (10 pieces)
Contract No.: 1024
IDENTIFICATION INFORMATION:
1. Material: SS304L
2. Is the heat treatment required? YES No
3. Applied coating? YES No
4. CRACKS: can not seen low medium heavy special
5. FOD: can not seen low medium heavy special
6. CORROSION/EROSION: can not seen low medium heavy special
7. BREAK OFF: can not seen low medium heavy special
8. DEFORMATION: can not seen low medium heavy special
9. WEAR: can not seen low medium heavy special
REMARKS:
Technical Engineer:
Date:
Approved by:
-8-
3. Work Scope
Row
GE-F5 combustion liner
1 2 3 4 5 6 7 8 9 10
10 Reshape distortion x x x x x x x x x x
blend weldments to achieve correct
11
dimensions and contour x x x x x x x x x x
12 Cleaning x x x x x x x x x x
Inspection after repair ( Visual and
13
dimensional inspection )
x x x x x x x x x x
-9-
GE-F5 retainer & Cross fire tube
1 Registration and identification
6 Reshape distortion
8 Cleaning
11 Final inspection
12 Certification of compliance
- 10 -
4. Metallographic Inspection
AS-RECEIVED MICROSTRUCTURE
400X
- 11 -
5. Typical Defects
- 12 -
Wear & Fretting on liner collar
- 13 -
Wear on spring seals of liner
- 14 -
Wear on spring seals of liner
- 15 -
Wear on liner stop
- 16 -
Wear on liner stop
- 17 -
Crack on liner body
- 18 -
Crack on liner body
- 19 -
Wear on liner cap collar
- 20 -
Wear on liner cap collar
- 21 -
Wear on cross fire tube
- 22 -
Wear on cross fire tube
- 23 -
Wear on retainer
- 24 -
6. After Welding
- 25 -
- 26 -
- 27 -
- 28 -
- 29 -
- 30 -
- 31 -
7. Final Inspection
- 32 -
- 33 -
8. Dimensional Inspection report
1 5029-N1 82.6 61.3 61.7 1.4 1.4 270 272.2 286.8 289.3
2 5029-N2 82.7 61.2 61.3 1.4 1.3 270.6 271.1 286.8 288
3 5029-N3 82.8 61.8 62.2 1.4 2 268.8 272.8 285.5 290
4 5029-N4 82.6 61.8 61.8 1.5 1.5 270.6 272.6 287.5 288.7
5 5029-N5 82.8 62.2 61.5 1.7 1.5 269 271.8 286.7 288.7
6 5029-N6 82.5 61.7 62 1.4 2 270 272.5 285.5 287.5
7 5029-N7 82.6 62.05 61.9 1.4 2 270.3 270.9 286.3 288.1
8 5029-N8 82.8 61.5 62.2 1.5 2 270 272.2 285.5 288.2
9 5029-N9 82.6 61.4 61.2 1.4 1.4 270 272.6 286.4 288
10 5029-N10 82.3 61.7 62.1 1.5 2 270.8 271.5 287.3 287.5
- 34 -
9. Inspection Report
DEFECT CODES:
BU - Burned LO - Louvers Open
CO – Corroded LC - Louvers Closed
CR – Cracked BR - Broken
BK - Buckled BT – Bent
H - Hot Spots M - Missing
W – Worn
TBC - Loss of Thermal Barrier Coating
DISPOSITION CODES:
N - No repair or replacement necessary.
R - Repaired (On Site, vendor or Service Shop).
RN - Replaced with new component.
- 35 -
Serial No. Combustion liner Defects X Fire Tube X Fire Tube
ROW Out (Code & location for cracks, also indicate Collar Defect Collar
In if hole-to-hole, or louver-to-hole) (Code & Location) replacement
CR(B2)
1 5029-N1 W(XF1,XF2)
NO
CR(B5)
2 5029-N2 W(XF1)
NO
CR(B5)
3 5029-N3 W(XF2)
Yes(B)
4 5029-N4 W(XF2)
Yes(A)
5 5029-N5 W(XF1,XF2)
Yes(A)
6 5029-N6 W(XF2)
Yes(B)
CR(B5,6)
7 5029-N7 W(XF2)
Yes(B)
8 5029-N8 W(XF1,XF2)
Yes(B)
CR(A2)
9 5029-N9 W(XF1)
NO
10 5029-N10 W(XF1,XF2)
Yes(B)
5 5029-N5 W(PMN,LS2)
NO R
W(I1-8)
6 5029-N6 W(OPM,LS1)
NO R
7 5029-N7 W(OP)
NO R
W(I3-7)
8 5029-N8 W(MN)
NO R
W(I6-7)
9 5029-N9 W(PMN)
NO R
W(I1-8)
10 5029-N10 W(MNO,LS3)
NO R
COMMENTS:
- 36 -
GAS TURBINE INSPECTION REPORT
MS 5001 - Crossfire Tubes & Retainers
Replacement Replacement
Cross
Crossfire Tube Defects Disp. Recommended at Retainer Retainer Defects Disp. Recommended at
fire
(Code & Location) Code Next Inspection No. (Code & Location) Code Next Inspection
No.
Yes No Yes No
W(Z1,2), FOD(U4) R 1 W(D1-4 ,C2,3) R
1
2 W(D2 ,A2,3)
W(Z1-4) R 3 W(D1,2 ,A2,3) R
2
4 W(D1 ,A2,3)
W(U1-4,Z1-4) R 5 W(D4) R
3
6 W(D1,2)
W(U1-4) R 7 W(C2) R
4
8 W(D3,4)
W(U1-4,Z1-4) R 9 W(D1 ,A2,3) R
5
10 W(D3,4)
W(Z3) R 11 W(D2,3) R
6
12 W(D3,4 ,A2,3)
W(U1,4,Z1-4) R 13 W(D1-4) R
7 CO(Z1-4) 14 W(D1-3)
W(U1-4,Z1) R 15 W(D2) R
8
16 W(D1-3)
W(U1,2) R 17 W(D1,2 ,A2,3) R
9 CO(Z1-4) 18 W(D1-4)
W(Z1-4) R 19 W(A2,3) R
10
20 W(D2,3 ,C2,3)
COMMENTS:
- 37 -
- 38 -
- 39 -
- 40 -
- 41 -
- 42 -
10. Final Visual Inspection
NOT ACCEPTABLE
Remarks:
- 43 -
11. Final Inspection
FINAL INSPECTION
CHECKS:
1. VISUAL INSPECTION
2. LABORATORY TESTS
3. P.T. INSPECTION
4. DIMENSIONAL INSPECTION
5. COATING PROCESS CONTROL
6. MOMENT WEIGHT / SEQUENCE
7. REPAIR INDENTIFICATION STAMPING
Remarks:
- 44 -
12. CERTIFICATE OF COMPLIANCE
Niroo Pajooh Shargh
th
No 801 , 802 ,10 Danesh st .,
th
11 Andisheh Blv ., Toos state ,
Customer: Gheshm Movaled Co. Mashhad, Iran.
Tel+ :98 51 35415008
Part name: GE-5001combustion liner& cross fire tube & retainer Fax+ :98 51 35415009
Delivery address: Gheshm Movaled Co. Website :www.npsc.ir
E-mail :info@npsc.ir
Certification:
All Parts guaranty for 8000 equivalent working hour of turbine or 12 month after delivery
- 45 -