Project: Construction of Quarters, Hostel Building and Allied Works at Geta, Kailali
Client: Medical College Infrastructure Construction Development Committee (MCICDC)
Consultant: Silt-Moonlight-Eversafe JV
Contact No: NCB/QHB-01-074/075
Contractor: Rabina-Thegim JV
Date: 28th August 2022
8 Hairline plaster Cracks on wall shall be rectify and repair all over the building wherever required.
9 Cleaning of SS Railing.
10 Proper fixing of SS Railing
Overall Building
Sanitary Works
1 All Sanitary fixtures shall be maintained for smooth operation and clean properly.
2 Cleaning of sanitary fixtures should be done properly.
3 Rectify water supply, soil waste, rainsupply pipe.
Electricals Works
1 All electrical fixtures shall be maintained for smooth operation and clean properly.
2 Cleaning of electrical fixtures prior to handing over.
3 Rectify and tightened all electrical fixtures, fittings and Changeover.