Schedule Moderat
Schedule Moderat
Ra 918 m'
6 Penyediaan TP Beton 800 mm 2,528,232 2,320,917,031
Ri
Sisa 0
Ra 5 1210 m'
7 Penyediaan TP Baja =15,88 mm 8,293,198 10,034,769,955
Ri
Sisa -5
Ra 3 30.6 m'
8 Penyediaan TP Baja t=11,9 mm 6,387,355 195,453,059
Ri
Sisa -3
S5,S8,S9,S19 13028.3 kg 22,719
PHT Tanjung Pura Ra 40 16 38.0165 m3 2,855,875
9 404,557,530
(TP Beton 800 mm) Ri 33
Sisa -7
A1 3812.1 kg 22,719
PHT Tanjung Pura Ra 10 14.3719 m' 3,087,810
10 130,983,766
(TP Baja t=15,88 mm) Ri
Sisa 0
P6 5718.15 kg 22,719
PHT Tanjung Raya Ra 15 21.5578 m' 3,087,810
11 196,475,650
(TP Baja t=15,88 mm) Ri
Sisa 0
S22-S24 2090.42 kg 22,719
Ra 3 26.26 Baris 3,087,810
12 Pile Head Tanjung Pura 128,577,611
Ri
Sisa 0
A1
Pengujian PDLT Ra 1 1 Titik
13 17,863,348 17,863,348
(TP Baja t=15,88 mm) Ri
Sisa 0
Ra 22 22 bh
14 Penyediaan Angkur Pin Move D19 440,952 9,700,934
Ri
Sisa 0
16,521,352,763
Penyediaan
Ra 2084 m'
1 Penyediaan TP Beton 800 mm 2,528,232 5,268,835,613
Ri
Sisa
Ra 1820 m'
2 Penyediaan TP Baja =15,88 mm 8,293,198 15,093,620,924
Ri
Sisa
Ra 855 m'
3 Penyediaan TP Baja t=11,9 mm 6,387,355 5,461,188,405
Ri
Sisa
Ra 56039.7 m'
4 Penyediaan Baja Struktur Grade 250 37,762 2,116,179,734
Ri
Sisa
27,939,824,677
Total 44,461,177,439
Deviasi 27,309,328,280