PT SAI
Periode bulan Februari
M1 M2 M3 M4
Rayon Afdeling Tgl : 1 sd 8 Tgl : 10 sd 15 Tgl : 17 sd 22 Tgl : 24 sd 29
P R P R P R P
OA 270.48 300
OB 314.45 335
OC 313.98 372
1
OD 432.59 395
OE 372.38 390
OF 422.57 400
OA
OB
OC
2
OD
OE
OF
M4 M5 M1
Tgl : 24 sd 29 Tgl : sd Rayon Afdeling Tgl : 1 sd 8
R P R P P INF P TRS R
OA 270.48
OB 314.45
OC 313.98
1
OD 432.59
OE 372.38
OF 422.57
M4 M5
Tgl : 24 sd 29 Tgl : sd
R P R
M2
Tgl : 10 sd 15
P P AVE PLAN TON AVE PLAN INF AVE PLAN TRS R
300 50 3 1.11
335 56 3 1.24
372 62 4 1.38
395 66 4 1.32
390 65 4 1.00
400 67 4 1.03
RAYON-PT TON TON/HKE TOT INF HKE TOT TRS HKE KET
KB 1007 168 10 4.00
AFD OA &OB
KT 1185 198 11 4.00 KONTRAKTOR,
SAI 2192 365 21 8.00 OC-OF INTI
M3 M4 M5
Tgl : 17 sd 22 Tgl : 24 sd 29 Tgl : sd
P R P R P R