You are on page 1of 1

4"

BEAM LEVEL BEAM LEVEL

6"
6"

6"
6"

6"
4" 4"

+6" FROM BEAM LEVEL

1"
BEAM LEVEL

15'-82
COVE 02

BEAM LEVEL
+6" FROM BEAM LEVEL
8"

BEAM LEVEL
1'-10"

6"
4" +6" FROM BEAM LEVEL 4"
4"

BEAM LEVEL
6"

BEAM LEVEL
2'

+6" FROM BEAM LEVEL

3'-6" 6"
4" 9"

+6" FROM BEAM LEVEL


BEAM LEVEL +15" FROM
BEAM LEVEL
COVE 01
3'-4"

4"
BEAM LEVEL
11'-11"

3'-8"
BEAM LEVEL

TRAP DOOR

+6" FROM BEAM LEVEL


4"

4"

4" 4" 4"


4"

4"

BEAM LEVEL

POP FALSE CEILING

COVE FOR STRIP LIGHT

COVE COVER

General Notes : CLIENT:


· This drawing, is the property of the REVISIONS
" Lines & Thoughts " and is issued explicitly for the NO DATE REMARKS BY
ETH
purpose mentioned.

CLUBHOUSE -
· It should not be copied/used/published,etc., partly or
fully without the written permission from
Lines & Thoughts . PROJECT:

LINES & THOUGHTS · All line out shall be checked and approved by the CLUB HOUSE
PENTHOUSE FALSE
"Clerk of Works" and/or site engineer / PMC /
Architect.
TI SH All dimensions are in feet/inches.
· Only the written dimensions shall be followed and no PROJECT NO: DWG. NO.

CEILING PLAN
drawing shall be scaled.
N G HO O OSITE · Discrepancy, if any, shall be brought to the notice of
EE N H L O H I the Architects and clarified before Please refer all the 2021-001 A2-1-01
relevant Structural/ HVAC/ MEP, etc.drawings and
details during execution.
· Large scale details shall take precedence over small SCALE : AS SHOWN
scale details; DATE : 06TH JUNE 2022
· Contractor shall return all the drawings issued to him
on completion of the project; DESIGN DEVELOPMENT DEALT : GA