INTRODUCTION
The overall design is sub divided into internal and site work sanitary designs. The former is
the plumbing service design to all fixtures, waste water disposal and rain water design
management (i.e. design of gutter and down pipes).The latter shall dictate supplying of water
from the central system, guiding sewage from the building to the nearby central waste
management and draining storm water from the building to the existing storm line.
i. Project Objective:
Objective of the service is to provide a complete detailed Design, Bill of Quantities, and
Design Report documents. In proposing; Plumbing service system and Fire Protection work of
the Building and external utility works of the project.
This service contract outlines the System design services under the following major
assignments:
Plumbing services design
o Domestic water supply and hot water return system if necessary
o Waste water drainage system and venting design
o Rain water and sub-surface drainage system design
o Storm water drainage design
o Waste water disposal and treatment unit design
o Laboratory Waste water disposal
o Laboratory Gas supply system
Fire protection design
Preparation of technical specification and bill of quantities
ii. Work Plan and Methodology
This activity starts with suppling a water supply system to roof mounted tank
from the existing main
The established design criteria, functional and hydraulic parameters will be fully
considered in conjunction with the economic aspects. The necessary assumption
based on the local condition will made.
This activity starts from the building waste water generation areas either using
the fixtures unit ratings or using the population residing in the building. The
generated waste water from the building will be quantified and qualitatively sorted so
that sewers network sizing and final treatment types selected accordingly.
Following the quantifying and sorting the type of the waste generated the hydraulic
design of pipes/sewers- main and laterals continues, with subsequent appurtenances
like manholes, flushing, sumps with pump if necessary, drop manholes, distributions,
and intermediate treatments like oil separator for kitchen, wastes dilution pits for
corrosive wastes, screenings for bigger size wastes,
Data Acquisition,
planning works, juries,
etc…
Design Optimization
and Coordination
Document Preparation
(Specification, Bill of
quantities and cost
estimate, etc…)
N.B. after final architectural drawing is acquired (after jury and SN comments are ratified)