‘rojeet Number" OPW20032
Iesued to; Ws. Sakar India Put. Lt.
Deter 21122022
[OBSERVATIONS « WSTRUGTIONS————— —
Bers Compliance (Past are powers)
| Observation: (Safe access not
provided for exterior work)
has been found that,
|“ Poor tamination st
| asement area ater
ropettve observaton there
‘Sho provision of
Imation fom al
verre oe weir |
__ taoment |
corrective Action
+ Provision of urination
Dark ara shoul be
Dbamcaded &allmateral
frem basement should Be
remove fom basement
| After Compliance: (Paste here
| Preventive Action:
|
+ Permanent Lights should
ibe proved at basement. |
Instruction date: 24.12. 2022
SZGTION TAKEN BY CONTRACTOR: All respective contractors 3
Aero antfocations fr proper ilumination athe time.
SCON, SAKAR, VRF, MEPL.
Initiating Action “Yes (No
ctiontaken on date: 24(((2~
conan baste a oot
Prashant Rahat :
rt pay
(Signatures of contraftor acceptance ‘acceptance of contractor actlor
fssuing authority) (Bate and signature) (pate & sign. OF issuing authority)