You are on page 1of 3
eee ‘sa: Ven003, ‘rojeet Number" OPW20032 Iesued to; Ws. Sakar India Put. Lt. Deter 21122022 [OBSERVATIONS « WSTRUGTIONS————— — Bers Compliance (Past are powers) | Observation: (Safe access not provided for exterior work) has been found that, |“ Poor tamination st | asement area ater ropettve observaton there ‘Sho provision of Imation fom al verre oe weir | __ taoment | corrective Action + Provision of urination Dark ara shoul be Dbamcaded &allmateral frem basement should Be remove fom basement | After Compliance: (Paste here | Preventive Action: | + Permanent Lights should ibe proved at basement. | Instruction date: 24.12. 2022 SZGTION TAKEN BY CONTRACTOR: All respective contractors 3 Aero antfocations fr proper ilumination athe time. SCON, SAKAR, VRF, MEPL. Initiating Action “Yes (No ctiontaken on date: 24(((2~ conan baste a oot Prashant Rahat : rt pay (Signatures of contraftor acceptance ‘acceptance of contractor actlor fssuing authority) (Bate and signature) (pate & sign. OF issuing authority) Page ot Project No, DPW-20 20 «1 Management Pane

You might also like