Area BEACON METRO (empty) Total Result

Dyeing Run 1518.78 4142.95 5661.73

On Finishing (A/Dye to B4 Comp) 20666.4 9615.55 30281.95

On Finishing (Problematic) 8887.26 6579.65 15466.91

QAD (A/Comp to B4 Store) 16897.34 11498.69 28396.03

QAD (Problematic) 3774 5418.3 9192.3

W.F.Dyeing 55006.95 80285.27 135292.22

(empty) 68776.85 90779.96 252012.8 411569.61

Total Result 175527.58 208320.37 252012.8 635860.75


Buyer- GU Order wise Summary
G.TOTAL Total= 548295 6325 68054.4 13186 635860.8 Kgs Date 3/Jan
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02889/1744 1x1Rib-270 60343H015B 62-Blue M1-4433 0 0 171 0 171 0 W.F.Dyeing W.F.Dyeing Sup METRO 3 11-Oct 7-Nov Internel 5
GU 22-02530/2206 1x1Rib-290 60343N002A 00-White B-7640 0 0 24 0 24 2-Nov 62 A/Compacting Sup BEACON 2 27-Oct 29-Nov Cutting(Sup)
GU 22-02745/2206 D/I/Lock-180 60343N002B 09-Black M1-4080 210 0 0 0 210 10-Dec 24 A/Compacting QAD (A/Comp to B4 Store) Sup METRO 2 12-Nov 29-Nov Cutting(SUP) 5
GU 22-02745/2206 Ly1x1Rib-290 60343N002B 09-Black M1-4080 A 0 0 13 0 13 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) Sup METRO 2 12-Nov 29-Nov Cutting(SUP) 5
Gu 22-02152 S/J-180 60143N111B 14-Red B-5509 9 0 0 0 9 3-Dec 31 Shade not ok-R2D 1st Batch BEACON 3 20-Nov 15-Nov Internat
Gu 22-02192 Waffle-240 60143H017B 02-Lt Grey B-8379 108 0 0 0 108 0 W.F.Dyeing Sup BEACON 3 22-Nov 8-Nov 21-Oct 5-Nov Internal 5
Gu 22-02192 RIB 60143H017B 02-Lt Grey B-8379 A 0 0 9 0 9 30-Nov 34 A/Compacting Sup BEACON 3 22-Nov 8-Nov 21-Oct 5-Nov Internal 5
Sup(Conta Prob Will Convart To
GU 22-01774 I/Lock-230 60243N007B 01-OFF White B-8174 325 0 0 0 325 18-Nov 46 A/Compacting BEACON 3 25-Jul 27-Sep 1-Sep 12-Sep 2
Balack As Per Mr.Biraz
GU 22-02547/1806 Ly1x1Rib-360 60343N001A 62-Blue B2-4159 0 0 84 0 84 0 W.F.Dyeing Sup BEACON 2 24-Jul 4-Oct 1-Sep 10-Sep Internal
GU 22-02792/2080 S/J-250 60243H057A Off White 01-Y/D M1-4423 150 0 0 0 150 0 W.F.Dyeing Sup METRO 2 17-Nov 29-Nov Internal 5
GU 22-02861/1396 D/I/Lock-180 60343N002B 61-Blue B-8561 168 0 0 0 168 9-Dec 25 A/Compacting S/Not Ok BEACON 2 25-Nov 20-Dec 8-Nov 5-Dec Cutting(SUP)
GU 22-02861/1399 D/I/Lock-180 60343N002B 58-Dk Green B2-4671 332 0 0 0 332 6-Dec 28 A/Compacting On Finishing (Problematic) S/C OK BEACON 2 25-Nov 27-Dec 8-Nov 5-Dec Cutting(SUP)
GU 22-02861/1399 1x1Plated Rib-290 60343N002B 58-Dk Green B2-4671A 0 0 15 0 15 9-Dec 25 A/Compacting QAD (A/Comp to B4 Store) Sup(Re-Process) BEACON 2 25-Nov 27-Dec 8-Nov 5-Dec Cutting(SUP)
GU 22-02876/2421 I/Lock-200 60342F010A 08-Dk Grey M1-4552 78 0 0 0 78 5-Dec 29 A/Compacting QAD (Problematic) Sup (C/Stain/Pin Hole/Pin Out) METRO 2 27-Nov 16-Nov Cutting(Sup)
GU 22-02972/2539 I/Lock-200 60342F010A 08-Dk Grey M1-5002 389 0 213 0 602 19-Dec 15 A/Compacting Sup RFD-20/12 METRO 2 13-Dec 16-Nov Cutting(Sup)
Sup (Match With U-02 Given
GU 22-02972/2539 Ly1x1Rib-260 60342F010A 00-White M1-4999 0 0 120 0 120 0 W.F.Dyeing W.F.Dyeing METRO 2 13-Dec 6-Dec 17-Nov 27-Nov 5
Swatch)
GU 22-02893/2472 S/J-250 60343H007A 22-Orange B2-4635 473 0 0 0 473 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) BEACON 3 21-Oct 1-Dec 12-Nov 22-Nov Internal 5
GU 22-02893/2472 1x1Rib-350 60343H007A 22-Orange B2-4635A 0 0 50 0 50 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) BEACON 3 21-Oct 1-Dec 12-Nov 22-Nov Internal 5
GU 22-02884/2472 S/J-250 60343H007A 22-Orange B2-4630 288 0 0 0 288 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) BEACON 3 28-Nov 1-Dec Cutting(SUP)
GU 22-02884/2472 1x1Rib-350 60343H007A 22-Orange B2-4630A 0 0 32 0 32 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) BEACON 3 28-Nov 1-Dec Cutting(SUP)
GU 22-02884/2472 S/J-250 60343H007A 54-Green M1-4549 332 0 0 0 332 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) METRO 3 28-Nov 1-Dec Cutting(SUP)
GU 22-02884/2472 1x1Rib-350 60343H007A 54-Green M1-4549 A 0 0 37 0 37 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) METRO 3 28-Nov 1-Dec Cutting(SUP)
GU 22-02886/2681 S/J-250 60343H007A 54-Green M1-4550 202 0 0 0 202 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) METRO 3 28-Nov 13-Dec Cutting(SUP)
GU 22-02886/2681 1x1Rib-350 60343H007A 54-Green M1-4550 A 0 0 24 0 24 0 W.F.Dyeing Sup(Stop Marchent As Per Mail) METRO 3 28-Nov 13-Dec Cutting(SUP)
GU 22-02923/1396 D.I/Lock-180 60343N002B 08-Dk Grey M1-4937 368.11 0 0 0 368.11 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 8-Dec 20-Dec Cutting(SUP)
GU 22-02923/1396 1x1Rib-290 60343N002B 08-Dk Grey M1-4937 A 0 0 19 0 19 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 8-Dec 20-Dec Cutting(SUP)
GU 22-02934/2373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4823 878 0 79 0 957 10-Dec 24 A/Compacting RFD-20/12 METRO 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4846 0 0 42 0 42 11-Dec 23 A/Compacting QAD (Problematic) ( Rib S/Not Ok)Partial METRO 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4846 0 0 42 0 42 11-Dec 23 A/Compacting QAD (Problematic) Rib S/Not Ok METRO 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4894 141 0 0 0 141 14-Dec 20 A/Compacting QAD (Problematic) (S/Not Ok) METRO 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4894 877 0 78 0 955 14-Dec 20 A/Compacting Sup RFD-20/12(141Kg S/Not Ok) METRO 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4949 1209 0 73 0 1282 0 Shade not ok-R2D On Finishing (Problematic) gsm High,R/Shade & Shade Prob) METRO 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 69-Navy B-8816 197 0 15 0 212 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Rib A/Comp BEACON 2 8-Dec 3-Jan Internal
GU 22-02934/2373 S/J-220(Tube) 60343N001B 15-Red B2-4780 35 0 5 0 40 0 A/Compacting QAD (A/Comp to B4 Store) Sup BEACON 2 8-Dec 3-Jan Internal
GU 22-02953/2541 1x1Rib-290 60343H025A 09-Black M1-4936 A 0 0 13 0 13 0 W.F.Dyeing W.F.Dyeing Sup Body D/Ok METRO 2 10-Dec 13-Dec Cutting(Sup)
GU 22-02954/2542 1x1Rib-290 60343H025A 09-Black M1-4935 A 0 0 37 0 37 0 W.F.Dyeing W.F.Dyeing Sup Body D/Ok METRO 2 10-Dec 6-Dec Cutting(Sup)
GU 22-02952/2250 I/Lock-170 60343N055A 09-Black B2-4840 516 0 0 0 516.26 0 W.F.Dyeing W.F.Dyeing Sup BEACON 3 10-Dec 3-Jan Cutting(Sup)
GU 22-02952/2250 I/Lock-170 60343N055A 09-Black B2-4840A 0 0 39 0 38.75 0 W.F.Dyeing W.F.Dyeing Sup BEACON 3 10-Dec 3-Jan Cutting(Sup)
GU 22-02952/2250 I/Lock-170 60343N055A 00-White B2-4820 344 0 0 0 344 0 A/Compacting Sup RFD-19/12 BEACON 3 10-Dec 3-Jan Cutting(Sup)
GU 22-02952/2250 I/Lock-170 60343N055A 00-White B2-4820A 0 0 42 0 42 18-Dec 16 A/Compacting QAD (A/Comp to B4 Store) Sup Body D/Ok BEACON 3 10-Dec 3-Jan Cutting(Sup)
GU 22-02952/2250 I/Lock-170 60343N055A 00-White B2-4820B 213 0 0 0 213 15-Dec 19 A/Compacting Sup RFD-19/12 BEACON 3 10-Dec 3-Jan Cutting(Sup)
GU 22-02992/2250 I/Loxk-170 60343N055A 68-Blue M1-5037 154.88 0 13.85 0 168.73 0 W.F.Dyeing W.F.Dyeing Sup BEACON 3 17-Dec 3-Jan Cutting(Sup)
GU 22-02992/2250 I/Loxk-170 60343N055A 55-Green M1-5049 147.55 0 0 0 147.55 0 W.F.Dyeing W.F.Dyeing Sup METRO 3 17-Dec 3-Jan Cutting(Sup)
GU 22-02992/2250 1x1Rib-270 60343N055A 55-Green M1-5049 A 0 0 13.84 0 13.84 0 W.F.Dyeing W.F.Dyeing Sup METRO 3 17-Dec 3-Jan Cutting(Sup)
GU 22-02997/1291 D/I/Lock-180 60343H025A 09-Black M1-5096 754 0 0 0 754 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 17-Dec 20-Dec Cutting(Sup)
GU 22-02997/1291 1x1Plated Rib-290 60343H025A 09-Black Metro 0 0 78 0 78 0 Sup(Batch Due) METRO 2 17-Dec 20-Dec Cutting(Sup)
GU 22-02996/2539 I/Lock-200 60342F010A 08-Dk Grey M1-5076 329 0 14 0 343 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 17-Dec 6-Dec Cutting(Sup)
GU 22-02991/2473 I/Lock-200 60342F010A 08-Dk Grey M1-5057 268 0 14 0 282 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 17-Dec 1-Dec Cutting(Sup)
GU 22-02991/2473 I/Lock-200 60342F010A 08-Dk Grey M1-5095 244 0 14 0 258 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 17-Dec 1-Dec Cutting(Sup)
GU 22-01396 D.I/Lock-180 60343N002B 08-Dk Grey M1-5091 657 0 0 0 657 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 20-Dec Internal
GU 22-01396 1x1Plated Rib-290 60343N002B 08-Dk Grey M1-5091A 0 0 45 0 45 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 20-Dec Internal
GU 22-01399 1x1Plated Rib-290 60343N002B 61-Blue B-9031 0 0 55 0 55 0 W.F.Dyeing W.F.Dyeing Sup BEACON 2 27-Dec Internal
GU 22-02541 1x1Plated Rib-290 60343H025A 09-Black M1-5083 0 0 75 0 75 0 W.F.Dyeing W.F.Dyeing Sup METRO 2 13-Dec Internal
GU 22-02559 1x1Rib-270 04823N018A 09-Black M1-5004 0 0 54 0 54 17-Dec 17 Shade not ok-R2D On Finishing (Problematic) Sup METRO 3 4-Nov 13-Dec Internal
GU 22-01396 D/I/Lock-180 60343N002B 08-Dk Grey M1-3213B 185 0 0 0 185 15-Dec 19 A/Compacting QAD (Problematic) R/Shade & Uneven Problem METRO 2 31-May 20-Dec 8-Nov 5-Dec 5
GU 22-01396 D/I/Lock-180 60343N002B 08-Dk Grey M1-3215 219 0 0 0 219 15-Dec 19 A/Compacting QAD (Problematic) Shade+Uneven METRO 2 31-May 20-Dec 8-Nov 5-Dec 5
GU 22-01396 1x1Rib-290 60343N002B 08-Dk Grey M1-4805 0 0 137 0 137 18-Dec 16 A/Compacting Sup RFD-20/12 METRO 2 31-May 20-Dec 8-Nov 5-Dec Internal 5
GU 22-01743 I/Lock-230 60243N006A 01-OFF White M1-3676 431 0 0 0 431 15-Dec 19 A/Compacting R/Shade N/Ok Convart To Black 2758 METRO 3 18-Jul 15-Nov 4-Oct 31-Oct 10-Nov 5
GU 22-01743 I/Lock-230 60243N006A 01-OFF White Metro 431 0 0 0 431 0 Revise Qty Need New Batch METRO 3 18-Jul 15-Nov 4-Oct 31-Oct 10-Nov 5
GU 22-01743 I/Lock-230 60243N006A 09-Black B2-2901B 131 0 0 0 131 15-Dec 19 A/Compacting Partial Qty(Re-Process) BEACON 3 18-Jul 15-Nov 4-Oct 31-Oct 10-Nov 5

GU 22-01743 1x1Rib-270 60243N006A 09-Black B2-2790B 0 0 20 0 20 15-Dec 19 A/Compacting BEACON 3 18-Jul 15-Nov 4-Oct 31-Oct 10-Nov 5
GU 22-01743 1x1Rib-270 60243N006A 09-Black B2-2791B 0 0 19 0 19 15-Dec 19 A/Compacting BEACON 3 18-Jul 15-Nov 4-Oct 31-Oct 10-Nov 5
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-01743 1x1Rib-270 60243N006A 09-Black B2-2792B 0 0 42 0 42 15-Dec 19 A/Compacting BEACON 3 18-Jul 15-Nov 4-Oct 31-Oct 10-Nov 5
GU 22-01745 D.I/Lock-180 60343N027A 00-White B-8010 621 0 0 0 621 15-Dec 19 A/Compacting On Finishing (Problematic) S/C OK BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01745 1x1Rib-290 60343N027A 00-White B-8010A 0 0 167 0 167 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01745 D.I/Lock-180 60343N027A 00-White B-8438 85 0 0 0 85 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) R/P (Partial) BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01745 D.I/Lock-180 60343N027A 68-Blue B-8586 1033.17 0 0 0 1033.17 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01745 D.I/Lock-180 60343N027A 68-Blue B-8594 327.68 0 0 0 327.68 18-Dec 16 B4 Compacting On Finishing (Problematic) BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01745 1x1Rib-290 60343N027A 68-Blue B-8586A 0 0 257.5 0 257.5 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01745 1x1Rib-290 60343N027A 68-Blue B-8594A 0 0 132.2 0 132.2 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) W.F.Body BEACON 2 18-Jul 3-Jan 15-Dec 26-Dec
GU 22-01807 G/Gain Tape 60343N001A 69-Navy B-6411 0 0 0 0.3 0.3 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) 300 YDS BEACON 2 24-Jul 11-Nov 20-Sep 17-Oct
GU 22-02046 S/J-180 60143N115B 72-Purple B-6980 62 0 10 0 72 0 W.F.Dyeing Last Batch No Need BEACON 2 11-Aug 11-Oct 25-Sep 10-Oct
GU 22-02152 S/J-180 60143N111B 69-Navy M1-4629 186 0 0 0 186 15-Dec 19 A/Compacting Re-Process(Partial) METRO 3 26-Aug 1-Nov 1-Nov 16-Nov 25-Nov
GU 22-02206 D/I/Lock-180 60343N002B 08-Dk Grey M1-2522 156 0 0 0 156 15-Dec 19 A/Compacting QAD (Problematic) UnEven Problem METRO 2 4-Sep 29-Nov 18-Oct 14-Nov 5
GU 22-02206 D/I/Lock-180 60343N002B 08-Dk Grey M1-3625 179 0 0 0 179 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 4-Sep 29-Nov 18-Oct 14-Nov 5
GU 22-02233 S/J-220(Tube) 60343N001B 00-White B-6599 137 0 0 0 137 15-Dec 19 A/Compacting R/Shade Problem BEACON 2 8-Sep 25-Oct 9-Oct 16-Oct
GU 22-02233 Ly1x1Rib-360 60343N001B 00-White B-6838A 0 0 80 0 80 15-Dec 19 A/Compacting BEACON 2 8-Sep 25-Oct 9-Oct 16-Oct
GU 22-02546/2233 Ly1x1Rib-360 60343N001B 62-Blue B2-3670C 0 0 77 0 77 15-Dec 19 A/Compacting QAD (Problematic) Sup(Gsm Low) BEACON 2 8-Sep 25-Oct
GU 22-02546/2233 Ly1x1Rib-360 60343N001B 62-Blue B2-3671B 0 0 79 0 79 15-Dec 19 A/Compacting QAD (Problematic) Sup(Gsm Low) BEACON 2 8-Sep 25-Oct
GU 22-02233 S/J-220(Tube) 60343N001B 69-Navy B-6933 153 0 0 0 153 15-Dec 19 A/Compacting T&T Patta BEACON 2 8-Sep 25-Oct 9-Oct 16-Oct
GU 22-02233 S/J-220(Tube) 60343N001B 30-Natural M1-3553 A 75 0 0 0 75 0 W.F.Dyeing W.F.Dyeing METRO 2 8-Sep 25-Oct 9-Oct 16-Oct
GU 22-02242 1x1Rib-250 60343N052B 00-White B-8004A 0 0 47 0 47 15-Dec 19 B4 Compacting RFD-07/12 BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 00-White B-8234A 0 0 17 0 17 15-Dec 19 B4 Stenter On Finishing (A/Dye to B4 Comp) Re-Process(Partial) BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 00-White B-8376 250 0 0 0 250 15-Dec 19 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec 2

GU 22-02242 I/Lock-200 60343N052B 00-White B-8377 217 0 0 0 217 15-Dec 19 A/Compacting QAD (Problematic) Gsm High,R/Shade & Shade Prob) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec 2

GU 22-02242 I/Lock-200 60343N052B 00-White B-8419 282 0 0 0 282 15-Dec 19 B4 Stenter On Finishing (A/Dye to B4 Comp) Re-Process METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
1st batch 2nd time shade not ok
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3428 182 0 0 0 182 15-Dec 19 Shade not ok-R2D On Finishing (Problematic) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
from buying house
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3757 998.01 0 0 0 998.01 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3757 A 0 0 68 68 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3761 A 0 0 69 69.2 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3762 A 0 0 72 72 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3763 A 0 0 71 71 0 W.F.Dyeing W.F.Dyeing METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3764 A 0 0 70 70 0 W.F.Dyeing W.F.Dyeing METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3765 A 0 0 40 40 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3428 A 0 0 16 16 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3761 1008 0 0 0 1008 15-Dec 19 B4 Compacting On Finishing (Problematic) Only Stenter METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3762 1012 0 0 0 1012 15-Dec 19 B4 Compacting On Finishing (Problematic) S/Not Ok METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3763 510 0 0 0 510 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3763 B 508 0 0 0 508 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3764 985 0 0 0 985 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3765 556 0 0 0 556 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4339 189 0 0 0 189 0 W.F.Dyeing Dyeing Run BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 38-Brown B2-4339A 0 0 15 0 15 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4474 708 0 0 0 708 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 38-Brown B2-4474A 0 0 62 0 62 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-5474 742 0 0 0 742.03 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 38-Brown B2-4574A 0 0 60 0 60 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4631 742 0 0 0 742.42 15-Dec 19 A/Dyeing On Finishing (A/Dye to B4 Comp) Re-Process BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4631A 0 0 62 0 62 15-Dec 19 A/Dyeing On Finishing (A/Dye to B4 Comp) Re-Process BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B-8650 738 0 0 0 738 15-Dec 19 B4 Compacting On Finishing (Problematic) W.F.Appv BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 38-Brown B-8650A 0 0 60 0 60 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown B-8702 251 0 0 0 251.45 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 38-Brown B-8702A 0 0 13 0 12.5 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 38-Brown B-8702B 0 0 10 0 10 0 W.F.Dyeing W.F.Dyeing BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 38-Brown Bcon 345 0 0 0 345 0 Batch Due BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 1x1Rib-250 60343N053B 00-White B-8346A 0 0 52 0 52 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 00-White B-8396 199 0 0 0 199 15-Dec 19 A/Compacting QAD (Problematic) (S/Not Ok)Partial BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec 2

GU 22-02244 I/Lock-200 60343N053B 00-White B-8416 96 0 0 0 96 15-Dec 19 A/Compacting QAD (Problematic) (B-Shade) BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02244 I/Lock-200 60343N053B 00-White Bcon 869 0 0 0 869 0 Batch Due BEACON 2 11-Sep 3-Jan 8-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 00-White B2-3928A 0 0 53 0 53 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 00-White B2-4393B 112 0 0 0 112 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 68-Blue B-7048 93 0 0 0 93 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 68-Blue B-7048A 0 0 8 0 8 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 68-Blue B2-4227 565 0 0 0 565 15-Dec 19 A/Compacting RFD-20/12 BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 68-Blue B-7839 40 0 0 0 40 15-Dec 19 A/Compacting P/Loss High N/Sup BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 68-Blue B-7839A 0 0 20 0 20 15-Dec 19 A/Compacting P/Loss High N/Sup BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02250 1x1Rib-270 60343N055A 68-Blue B2-4227A 0 0 22 0 22 15-Dec 19 Shade not ok-R2D On Finishing (Problematic) Partial Qty BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec 1

GU 22-02250 1x1Rib-270 60343N055A 68-Blue B2-4227A 0 0 35 0 35 15-Dec 19 A/Compacting P/Loss High N/Sup BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec 1

GU 22-02250 I/Lock-170 60343N055A 09-Black B2-4235 220 0 0 0 220 15-Dec 19 A/Compacting QAD (Problematic) (Gsm High) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec 2

GU 22-02250 I/Lock-170 60343N055A 09-Black B2-4235B 42 0 0 0 42 15-Dec 19 A/Compacting QAD (Problematic) (Gsm High) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec 1

GU 22-02250 I/Lock-170 60343N055A 55-Green M1-3735 132 0 0 0 132 15-Dec 19 A/Compacting P/Loss High N/Sup METRO 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
Rib dyeing running (Body wf in-
GU 22-02250 I/Lock-170 60343N055A 55-Green M1-3741 B 361 0 0 0 361 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
house app, wf lab test)
GU 22-02250 1x1Rib-270 60343N055A 55-Green M1-3735 A 0 0 26 0 26 15-Dec 19 A/Compacting Rib P/.Loss High METRO 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 55-Green M1-3741 A 0 0 14 0 14 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Partial Qty(Re-Process) METRO 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 55-Green M1-3747 A 0 0 10 0 10 15-Dec 19 A/Compacting Rib P/.Loss High METRO 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 04-Grey B-7049 94 0 0 0 94 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 04-Grey B-7049A 0 0 7 0 7 15-Dec 19 A/Compacting QAD (Problematic) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 1x1Rib-270 60343N055A 04-Grey B-7847A 0 0 20 0 20 15-Dec 19 A/Compacting P/Loss High N/Sup BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 04-Grey B-7847 35 0 0 35 15-Dec 19 A/Compacting P/Loss High N/Sup BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 04-Grey B-7907 74 0 0 0 74 15-Dec 19 A/Compacting QAD (Problematic) S/Not Ok(Partial) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec 2

GU 22-02250 I/Lock-170 60343N055A 04-Grey B-7909 669 0 0 0 668.5 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 G/Gain Tape 60343N055A 04-Grey B2-8591 0 0 1 0 1 0 A/Compacting RFD-20/12 BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02250 I/Lock-170 60343N055A 04-Grey B-8980 643 0 0 0 642.66 20-Dec 14 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 3 11-Sep 3-Jan 22-Nov 19-Dec 19-Dec
GU 22-02300 Ly1x1Rib-360 60343N001B 00-White B-7237A 0 0 63 0 63 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Body D/Ok-21/10 BEACON 2 23-Sep 27-Dec 15-Nov 12-Dec
GU 22-02300 S/J-220(Tube) 60343N001B 59 Dk Green M1-3648 294 0 0 0 294 15-Dec 19 A/Compacting Patta Problem METRO 2 23-Sep 27-Dec 15-Nov 12-Dec
GU 22-02333 S/J-170 60273N076A 11-1001(Blue 62) Aop 603 0 0 0 603 0 Batch Due 2 1-Oct 16-Jan
11-1001(lt Green 50)
GU 22-02333 S/J-170 60273N076A 421 0 0 0 421 0 Batch Due BEACON 2 1-Oct 16-Jan
Aop
GU 22-02333 S/J-170 60273N076A 11-1001(Pink 11) Aop 571 0 0 0 571 0 Batch Due 2 1-Oct 16-Jan
GU 22-02333 S/J-170 60273N076A 11-1001(Navy 69) Aop B2-4857 399.65 30 0 0 429.65 20-Dec 14 A/Dyeing On Finishing (A/Dye to B4 Comp) Only One Batch BEACON 2 1-Oct 16-Jan
GU 22-02333 S/J-170 60273N076A 11/16-1511Tcx B-8057 15 0 0 0 15 27-Nov 37 A/Dyeing On Finishing (Problematic) 1st Batch BEACON 2 1-Oct 16-Jan
GU 22-02333 S/J-170 60273N076A 11/16-1511Tcx B2-4844 212 0 0 0 212 0 W.F.Dyeing W.F.Dyeing Only One Batch BEACON 2 1-Oct 16-Jan
GU 22-02333 S/J-170 60273N076A 62/16-4030 129 0 0 0 129 0 Batch Due 2 1-Oct 16-Jan
GU 22-02333 S/J-170 60273N076A 60/15-5207 56 0 0 0 56 0 Batch Due 2 1-Oct 16-Jan
GU 22-02333 S/J-170 60273N076A 69/19-3920 74 0 0 0 74 0 Batch Due 2 1-Oct 16-Jan
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-7838A 0 0 55 0 55 10-Dec 24 A/Compacting Rib Deli Short BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-7953A 0 0 65 0 65 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-7954A 0 0 64 0 64 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-7955A 0 0 68 0 68 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-7956A 0 0 64 0 64 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-7957A 0 0 71 0 71 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 00-White B-8849 252.1 0 0 0 252.1 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 00-White B-8849B 251.1 0 0 0 251.1 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 00-White B-8849A 0 0 32 0 32 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 00-White B-7953 800.8 0 0 0 800.8 20-Dec 14 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 00-White B-7954 798.8 0 0 0 798.8 20-Dec 14 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 00-White B-7955 802.1 0 0 0 802.1 0 W.F.Dyeing W.F.Dyeing BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 00-White Bcon 5078 0 230 0 5308 0 Batch Due BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 09-Black B-8930 765 0 58 0 822.55 0 A/Compacting RFD-20/12 BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 09-Black B-8931 772 0 58 0 829.3 0 A/Compacting RFD-20/12 BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 09-Black B-8983 760 0 56 0 815.7 19-Dec 15 B4 Compacting On Finishing (A/Dye to B4 Comp) Rib A/Comp BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 09-Black B-8968 767 0 61 0 828.5 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) Rib A/Comp BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 09-Black Bcon 1566 0 119 0 1685 0 Batch Due BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-3923 906 0 0 0 906 15-Dec 19 A/Compacting Patta Prob Supple Taken METRO 2 10-Dec 3-Jan 29-Nov 26-Dec 1

GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-3923 0 0 104 0 104 15-Dec 19 A/Compacting Rib W.F.Body METRO 2 10-Dec 3-Jan 29-Nov 26-Dec 1

GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-3956 660 0 0 0 660 15-Dec 19 A/Compacting Patta Prob Supple Taken METRO 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4472 610 0 0 0 610 15-Dec 19 A/Compacting Patta Prob Supple Taken METRO 2 10-Dec 3-Jan 29-Nov 26-Dec 1

GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4472 610 0 0 0 610 15-Dec 19 A/Compacting Patta Prob Supple Taken METRO 2 10-Dec 3-Jan 29-Nov 26-Dec 1

GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4950 139 0 11 0 149.95 15-Dec 19 B4 Compacting On Finishing (Problematic) S/Not OK METRO 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4989 900 0 114 0 1013.39 18-Dec 16 A/Compacting QAD (A/Comp to B4 Store) Rib B4Comp METRO 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green M1-4989 A 382 0 13 0 395.3 18-Dec 16 A/Compacting QAD (A/Comp to B4 Store) Rib B4Comp METRO 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 59 Dk Green 380 0 0 0 380 0 Batch Due METRO 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 62-Blue B2-4284B 0 0 22 0 22 0 W.F.Dyeing W.F.Dyeing BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 62-Blue B2-4593A 0 0 29 0 29 0 W.F.Dyeing W.F.Dyeing BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 Ly1x1Rib-360 60343N001B 62-Blue B2-4593B 0 0 13 0 12.68 19-Dec 15 W.F.Dyeing Dyeing Run BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 62-Blue B2-4593 336 0 0 0 336 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) Re-Process BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 62-Blue B2-4593C 209 0 0 0 209 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) Re-Process BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 62-Blue B2-4593D 14 0 0 0 14 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) Re-Process BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 15-Red B2-4757 170.75 0 0 0 170.75 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 S/J-220(Tube) 60343N001B 15-Red B2-4758 251.15 0 25 0 276.15 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 G/Gain Tape 60343N001B 15-Red B-8838 0 0 0 1 0.6 15-Dec 19 A/Dyeing On Finishing (A/Dye to B4 Comp) 600 YDS BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02373 G/Gain Tape 60343N001B 09-Black B-8839 0 0 0 1 1.3 18-Dec 16 A/Dyeing On Finishing (A/Dye to B4 Comp) 1300 YDS BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02373 G/Gain Tape 60343N001B 69-Navy B-8840 0 0 0 1 0.6 0 A/Compacting RFD-20/12 BEACON 2 10-Dec 3-Jan 29-Nov 26-Dec
GU 22-02395 S/J-220(Tube) 60343N001B 59-Dk Green M1-3642 38 0 0 0 38 15-Dec 19 A/Compacting Patta Reject METRO 2 10-Oct 1-Dec 5-Nov 16-Nov
GU 22-01899 I/Lock-200 60342F010A 08-Dk Grey M1-3999 29 0 0 0 29 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Re-Process METRO 2 14-Oct 16-Nov 31-Oct 7-Nov Soft Cotton 5
GU 22-02421 I/Lock-200 60342F010A 08-Dk Grey M1-3578 328 0 7 0 335 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Re-Process METRO 2 14-Oct 16-Nov 31-Oct 7-Nov Soft Cotton 5
GU 22-02421 I/Lock-200 60342F010A 08-Dk Grey M1-3405 170 0 0 0 170 15-Dec 19 A/Compacting RFD-20/12 METRO 2 14-Oct 16-Nov 31-Oct 7-Nov Soft Cotton 5
GU 22-02421 I/Lock-200 60342F010A 08-Dk Grey Metro 328 0 7 0 335 0 W.F.New Batch METRO 2 14-Oct 16-Nov 31-Oct 7-Nov Soft Cotton 5
GU 22-02945/2425 S/J-180 60143N213A 01-Off White M1-4892 91 0 20 0 111 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Sup METRO 2 15-Oct 29-Nov 10-Nov 21-Nov Internal
GU 22-02439 S/J-250 60343H007A 30-Natural Bcon 277 0 0 0 277 0 Last Batch Due BEACON 3 15-Oct 15-Nov 30-Oct 7-Nov Knit C/Dt-05/11 Special

GU 22-02443 I/Lock-230 60243N007B 01-Off White B-8735 878.5 21 0 0 899.5 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
GU 22-02443 1x1Rib-270 60243N007B 01-Off White B-8735A 0 0 99 0 99 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
GU 22-02443 I/Lock-230 60243N007B 57-Olive B-8666 585 14 0 0 599 15-Dec 19 B4 Compacting On Finishing (Problematic) W.F.Appv BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
GU 22-02443 1x1Rib-270 60243N007B 57-Olive B-8666A 0 0 66.6 0 66.6 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
FROM GU 22-01774 COL-OFF
GU 22-02443 I/Lock-230 60243N007B 09-Black B-8174 290 0 0 0 290 0 W.F.Dyeing W.F.Dyeing WHITE B-8174 [COLOUR BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov 2
CONVERT ]
GU 22-02443 I/Lock-230 60243N007B 09-Black B-8600 166 10 0 0 176 0 W.F.Dyeing W.F.Dyeing BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
GU 22-02443 1x1Rib-270 60243N007B 09-Black B-8600A 0 0 47 0 47 0 W.F.Dyeing W.F.Dyeing BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
GU 22-02443 I/Lock-230 60243N007B 69-Navy B2-4549 198 5 0 0 203 0 W.F.Dyeing W.F.Dyeing BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
GU 22-02443 I/Lock-230 60243N007B 69-Navy B2-4549A 0 0 22 0 22 0 W.F.Dyeing W.F.Dyeing BEACON 3 16-Oct 3-Jan 22-Nov 19-Dec 22-Nov
R/Shade N/Ok Convart To Black
GU 22-02472 S/J-250 60343H007A 54-Green M1-4027 1266 0 0 0 1266 15-Dec 19 A/Compacting METRO 3 21-Oct 1-Dec 12-Nov 22-Nov 5
2758
GU 22-02472 S/J-250 60343H007A 54-Green Metro 1266 0 0 0 1266 0 Batch Due METRO 3 21-Oct 1-Dec 12-Nov 22-Nov 5
GU 22-02472 S/J-250 60343H007A 22-Orange B2-4350 76 0 0 0 76 15-Dec 19 A/Compacting (Gsm Low)Re-Process BEACON 3 21-Oct 1-Dec 12-Nov 22-Nov 5
GU 22-02473 Ly1x1Rib-260 60342F010A 00-White B2-4215A 0 0 27 0 27 15-Dec 19 A/Compacting Body D/Ok BEACON 2 21-Oct 1-Dec 12-Nov 22-Nov 5
GU 22-02473 I/Lock-200 60342F010A 08-Dk Grey M1-3629 134 0 0 0 134 15-Dec 19 A/Compacting QAD (Problematic) (S/Not Ok) METRO 2 21-Oct 1-Dec 12-Nov 22-Nov 5
GU 22-02473 I/Lock-200 60342F010A 08-Dk Grey M1-3829 93 0 0 0 93 15-Dec 19 A/Compacting QAD (Problematic) (S/Not Ok) METRO 2 21-Oct 1-Dec 12-Nov 22-Nov 5
GU 22-02473 I/Lock-200 60342F010A 08-Dk Grey Metro 100 0 10 0 110 0 Need P/Loss Sup METRO 2 21-Oct 1-Dec 12-Nov 22-Nov 5
GU 22-02483 S/J-250 60343H007A 09-Black Bcon 172 0 9 0 181 0 P/Loss High N/Sup BEACON 3 22-Oct 29-Nov 13-Nov 20-Nov
1x1 Plated Rib-
GU 22-02501 60343N096A 39-Dark Brown(Y/D) M1-4193 0 0 29 0 29 15-Dec 19 A/Compacting P/Loss High N/Sup METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
270
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-4618 52 0 0 0 52 15-Dec 19 A/Compacting QAD (Problematic) (Shade Not/Ok) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-4758 80 0 0 0 80 15-Dec 19 A/Compacting RFD-20/12 METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5018 342.35 0 0 0 342.35 0 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5022 362.85 0 0 0 362.85 0 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5023 350.85 0 0 0 350.85 0 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5027 350.5 0 0 0 350.5 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5028 360.55 0 0 0 360.55 0 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5031 229.1 0 0 0 229.1 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5032 368.35 0 0 0 368.35 0 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5040 366.45 0 0 0 366.45 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5041 350.2 0 0 0 350.2 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5042 351.05 0 0 0 351.05 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5047 306.4 0 0 0 306.4 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5048 172.2 0 0 0 172.2 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5051 228.25 0 0 0 228.25 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5052 226.9 0 0 0 226.9 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5053 359.75 0 0 0 359.75 19-Dec 15 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5054 342.3 0 0 0 342.3 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5059 243.95 0 0 0 243.95 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) M1-5060 245.2 0 0 0 245.2 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 39-Dark Brown(Y/D) 735 0 0 0 735 0 Batch Due METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4467 10 0 0 0 10 15-Dec 19 A/Compacting METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4500 30 0 0 0 30 15-Dec 19 A/Compacting METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4533 318 0 0 0 318 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
Rib shade not ok (conta
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4599 331 8 0 0 338.95 15-Dec 19 A/Compacting QAD (Problematic) problem ,wf in-house app,wf lab METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
test) (Body wf
Conta problem
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4648 272 0 0 272.4 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
submission, wf lab test)
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4715 217 0 0 0 216.8 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4743 291 0 0 0 291.3 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
Conta problem (Body wf
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4764 290 0 0 0 289.6 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
submission, wf lab test)
Conta problem (Body wf
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4771 254 0 0 0 253.9 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
submission, wf lab test)
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4774 258 0 0 0 258.3 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4793 263 0 0 0 263 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4842 323 0 0 0 322.5 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4843 351 0 0 0 351 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4844 240 0 0 0 239.5 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
Conta problem (Body wf
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4844 A 101 0 0 0 101 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
submission, wf lab test)
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4850 247 0 0 0 247.02 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4851 332 0 0 0 332.1 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4897 250 0 0 0 249.8 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4898 270 0 0 0 270.45 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4899 84 0 0 0 84 15-Dec 19 A/Compacting QAD (Problematic) (S/Not Ok)Partial METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D M1-4900 245 0 0 0 245.1 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A White 00-Y/D 381 0 0 0 381 0 Batch Due METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
1x1 Plated Rib-
GU 22-02501 60343N096A 69-Navy(Y/D) M1-4464 0 0 28 0 28 15-Dec 19 A/Compacting P/Loss High N/Sup METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
270
Wf app sample rib apprival (Conta
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4607 340 13 0 0 353 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
problem)
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4636 337.3 29 0 0 366.3 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Body app but Rib batch card due METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4685 353.8 0 0 0 353.8 15-Dec 19 A/Compacting QAD (Problematic) Phenolic Not/OK METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4686 357.8 0 0 0 357.8 15-Dec 19 A/Compacting RFD-20/12 METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
Wf app sample rib apprival (Conta
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4719 200.1 0 0 0 200.1 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
problem)
Wf app sample rib apprival (Conta
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4723 268.85 0 0 0 268.85 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
problem)
Wf app sample rib apprival (Conta
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4785 303.7 0 0 0 303.7 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
problem)
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4856 350.4 0 0 0 350.4 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4857 313.15 0 0 0 313.15 15-Dec 19 A/Compacting RFD-20/12 METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4858 341.75 0 0 0 341.75 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4866 255.75 0 0 0 255.75 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4867 235.4 0 0 0 235.4 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4868 368.4 0 0 0 368.4 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4877 350.45 0 0 0 350.45 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4878 277.8 0 0 0 277.8 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-4880 260.5 0 0 0 260.5 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-5016 314.1 0 0 0 314.1 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) M1-5017 211 0 0 0 211 0 W.F.Dyeing W.F.Dyeing METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02501 S/J-200 60343N096A 69-Navy(Y/D) 1145 0 0 0 1145 0 Batch Due METRO 2 24-Oct 10-Jan 18-Dec 29-Dec
GU 22-02509 S/J-180 60343N066A 00-White M1-4197 50 0 0 0 50 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Re-Process METRO 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 S/J-180 60343N066A 00-White M1-4197 B 297 0 0 0 297 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Re-Process METRO 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 S/J-180 60343N066A 09-Black B-8374 573 0 0 0 573 15-Dec 19 A/Compacting QAD (Problematic) Shade not ok from buying house BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 1x1Rib-270 60343N066A 09-Black B-8374A 0 0 41 0 41 15-Dec 19 Shade not ok-R2D On Finishing (Problematic) S/Not Ok BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
1st batch submission hold for rib
GU 22-02509 S/J-180 60343N066A 12-Pink B2-4662 300 0 0 0 300 15-Dec 19 A/Compacting QAD (Problematic) BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
dyeing due
GU 22-02509 1x1Rib-270 60343N066A 12-Pink B2-4662A 0 0 21 0 21 0 W.F.Dyeing W.F.Dyeing BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 S/J-180 60343N066A 59-Dk Green B2-4661 338 0 0 0 338 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 1x1Rib-270 60343N066A 59-Dk Green B2-4661A 0 0 24 0 24 15-Dec 19 Shade not ok-R2D QAD (Problematic) S/Not Ok BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 S/J-180 60343N066A 69-Navy M1-4194 280 0 0 0 280 0 W.F.Dyeing W.F.Dyeing METRO 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 1x1Rib-270 60343N066A 69-Navy M1-4194 A 0 0 20 0 20 0 W.F.Dyeing W.F.Dyeing METRO 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 S/J-180 60343N066A 61-Blue 303 0 0 0 303 0 Batch Due BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 1x1Rinb-270 60343N066A 61-Blue B-8599A 0 0 21 0 21 0 W.F.Dyeing W.F.Dyeing Batch Due BEACON 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02509 S/J-180 60343N066A 03-Grey M1-4821 516 0 36.74 0 552.74 15-Dec 19 A/Compacting RFD-20/121 METRO 2 25-Oct 10-Jan 11-Dec 26-Dec
GU 22-02539 Ly1x1Rib-260 60342F010A 00-White M1-3725 A 0 0 37 0 37 15-Dec 19 Shade not ok-R2D Need Sup METRO 2 28-Oct 6-Dec 17-Nov 27-Nov 5
GU 22-02539 Ly1x1Rib-260 60342F010A 00-White M1-3726 A 0 0 33 0 33 15-Dec 19 Shade not ok-R2D Need Sup METRO 2 28-Oct 6-Dec 17-Nov 27-Nov 5
GU 22-02539 Ly1x1Rib-260 60342F010A 00-White M1-3727 A 0 0 51 0 51 15-Dec 19 Shade not ok-R2D Gsm Low Reject METRO 2 28-Oct 6-Dec 17-Nov 27-Nov 5
GU 22-02540 I/Lock-180 60343H025A 09-Black M1-4429 228 0 0 0 228 15-Dec 19 A/Compacting QAD (Problematic) (C/Stain & Crimple Mark) METRO 2 29-Oct 13-Dec 24-Nov 4-Dec
GU 22-02540 I/Lock-180 60343H025A 09-Black M1-4474 264 0 0 0 264 10-Dec 24 A/Compacting QAD (Problematic) Gsm Low METRO 2 29-Oct 13-Dec 24-Nov 4-Dec
GU 22-02541 I/Lock-180 60343H025A 00-White B-7984 376 0 0 0 376 0 W.F.Dyeing W.F.Dyeing BEACON 2 29-Oct 13-Dec 24-Nov 4-Dec
GU 22-02541 1x1Rin-290 60343H025A 00-White B-7984A 0 0 50 0 50 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 29-Oct 13-Dec 24-Nov 4-Dec
GU 22-02542 I/Lock-180 60343H025A 09-Black M1-3710 234 0 0 0 234 15-Dec 19 A/Compacting Patta & Uneven METRO 2 29-Oct 6-Dec 20-Nov 27-Nov 5
GU 22-02561 S/J-180 60343N048B 33-Khaki Yd B2-4885 206 0 0 0 206 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 30-Oct 17-Jan
GU 22-02561 S/J-180 60343N048B 33-Khaki Yd B2-4888 160.9 0 0 0 160.9 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 30-Oct 17-Jan
GU 22-02561 1x1Rib-270 60343N048B 33-Khaki Yd B-8609A 0 0 36 0 36 0 W.F.Dyeing W.F.Dyeing BEACON 2 30-Oct 17-Jan
GU 22-02561 G/Gain Tape 60343N048B 33-Khaki Yd B-8609B 0 0 0 0.2 0.2 0 W.F.Dyeing W.F.Dyeing 200 YDS BEACON 2 30-Oct 17-Jan
GU 22-02561 S/J-180 60343N048B 59-Dk Green Yd B2-4785 246.4 0 0 0 246.4 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 30-Oct 17-Jan
GU 22-02561 S/J-180 60343N048B 59-Dk Green Yd B2-4884 232 0 0 0 232 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 30-Oct 17-Jan
GU 22-02561 1x1Rib-270 60343N048B 59-Dk Green Yd B-8610A 0 0 48 0 48 0 W.F.Dyeing W.F.Dyeing BEACON 2 30-Oct 17-Jan
GU 22-02561 G/Gain Tape 60343N048B 59-Dk Green Yd B-8610B 0 0 0 0.2 0.2 0 W.F.Dyeing W.F.Dyeing 200 YDS BEACON 2 30-Oct 17-Jan
GU 22-02561 S/J-180 60343N048B 69-Navy Yd B2-4791 354.5 0 0 0 354.5 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 30-Oct 17-Jan
GU 22-02561 1/1 RIB-270 60343N048B 69-Navy Yd B2-4822 0 0 72.5 0 72.5 19-Dec 15 W.F.Dyeing Dyeing Run BEACON 2 30-Oct 17-Jan
GU 22-02561 G/Gain Tape 60343N048B 69-Navy Yd B-9003 0 0 0 0.3 0.3 0 W.F.Dyeing W.F.Dyeing 300 YDS BEACON 2 30-Oct 17-Jan
GU 22-02561 S/J-180 60343N048B 69-Navy Yd Bcon 242 0 0 0 242 0 Batch Due BEACON 2 30-Oct 17-Jan
GU 22-02567 1x1Rib-270 00-White M1-4544 A 0 0 63 0 63 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4545 A 0 0 56 0 56 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4546 A 0 0 55 0 55 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4547 A 0 0 58 0 58 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4544 890 0 0 0 890 0 A/Compacting QAD (A/Comp to B4 Store) METRO
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02567 G/Gain Tape 00-White M1-4544 B 0 0 0 0.9 0.9 0 A/Dyeing On Finishing (A/Dye to B4 Comp) 900 YDS METRO
GU 22-02567 S/J-200 00-White M1-4545 887 0 0 0 887 0 W.F.Dyeing W.F.Dyeing METRO
GU 22-02567 S/J-200 00-White M1-4546 885 0 0 0 885 0 A/Compacting QAD (A/Comp to B4 Store) METRO
GU 22-02567 S/J-200 00-White M1-4547 888.1 0 0 0 888.1 20-Dec 14 W.F.Dyeing Dyeing Run METRO
GU 22-02567 S/J-200 00-White M1-4633 888.5 0 0 0 888.5 0 W.F.Dyeing W.F.Dyeing METRO
GU 22-02567 1x1Rib-270 00-White M1-4633 A 0 0 57.8 0 57.8 0 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 S/J-200 00-White M1-4644 878.2 0 0 0 878.2 0 W.F.Dyeing W.F.Dyeing METRO
GU 22-02567 S/J-200 00-White M1-4645 893.9 0 0 0 893.9 15-Dec 19 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4644 A 0 0 55.9 0 55.9 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4645 A 0 0 58.3 0 58.3 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4688 A 0 0 57.9 0 57.9 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO
GU 22-02567 1x1Rib-270 00-White M1-4689 A 0 0 60.7 0 60.7 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4690 A 0 0 59.5 0 59.5 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4691 A 0 0 56.7 0 56.7 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4692 A 0 0 58.3 0 58.3 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 S/J-200 00-White M1-4688 885 0 0 0 885 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO
GU 22-02567 1x1Rib-270 00-White M1-4730 A 0 0 56.5 0 56.5 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4731 A 0 0 55.6 0 55.6 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO
GU 22-02567 1x1Rib-270 00-White M1-4732 A 0 0 58.8 0 58.8 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4733 A 0 0 58.1 0 58.1 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 S/J-200 00-White M1-4734 B 200 0 0 0 200 0 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
GU 22-02567 1x1Rib-270 00-White M1-4734 A 0 0 58.6 0 58.6 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO
S/J Crinkle
GU 22-02609 60143N124A 01-Off White B2-4584 853 0 75 0 928 0 W.F.Dyeing W.F.Dyeing Beacon 2 1-Nov 3-Dec 1-Dec 12-Dec
Design-200
S/J Crinkle
GU 22-02609 60143N124A 01-Off White B2-4586 853 0 75 0 928 0 W.F.Dyeing W.F.Dyeing Beacon 2 1-Nov 3-Dec 1-Dec 12-Dec
Design-200
S/J Crinkle
GU 22-02609 60143N124A 09-Black M1-3989 451 0 0 0 451 0 W.F.Dyeing W.F.Dyeing METRO 2 1-Nov 3-Dec 1-Dec 12-Dec
Design-200
GU 22-02609 LY1X1RIB-280 60143N124A 09-Black M1-3989 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 2 1-Nov 3-Dec 1-Dec 12-Dec
S/J Crinkle
GU 22-02609 60143N124A 12-Pink B-8411 457 0 0 0 457 0 W.F.Dyeing W.F.Dyeing Beacon 2 1-Nov 3-Dec 1-Dec 12-Dec
Design-200
GU 22-02609 LY1X1RIB-280 60143N124A 12-Pink B-8411A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing Beacon 2 1-Nov 3-Dec 1-Dec 12-Dec
S/J Crinkle
GU 22-02609 60143N124A 64-Blue B2-4567 199 0 0 0 199 0 W.F.Dyeing W.F.Dyeing BEACON 2 1-Nov 3-Dec 1-Dec 12-Dec
Design-200
GU 22-02609 LY1X1RIB-280 60143N124A 64-Blue B2-4567A 0 0 17 0 17 0 W.F.Dyeing W.F.Dyeing Beacon 2 1-Nov 3-Dec 1-Dec 12-Dec
S/J Crinkle
GU 22-02609 60143N124A 73-Purple M1-4078 511 0 0 0 511 0 W.F.Dyeing W.F.Dyeing METRO 2 1-Nov 3-Dec 1-Dec 12-Dec
Design-200
GU 22-02609 LY1X1RIB-280 60143N124A 73-Purple M1-4078 A 0 0 45 0 45 0 W.F.Dyeing W.F.Dyeing METRO 2 1-Nov 3-Dec 1-Dec 12-Dec
GU 22-02654 D/I/Lock-180 60343N027A 00-White B-8663 632.18 0 0 0 632.18 15-Dec 19 A/Compacting On Finishing (Problematic) Gsm Low BEACON
GU 22-02654 D/I/Lock-180 60343N027A 00-White B-8674 236 0 0 0 236 15-Dec 19 A/Compacting RFD-20/12 BEACON 1

GU 22-02654 D/I/Lock-180 60343N027A 00-White B-8708 582.5 0 0 0 582.5 0 W.F.Dyeing W.F.Dyeing BEACON
GU 22-02654 D/I/Lock-180 60343N027A 68-Blue B-8932 223.9 0 0 0 223.9 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON
GU 22-02654 1x1Rib-290 60343N027A 68-Blue B-8932A 0 0 55 0 55 0 W.F.Dyeing W.F.Dyeing METRO
GU 22-02654 1x1Rib-290 60343N027A 09-Black M1-4798 A 0 0 262 0 262 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) METRO
GU 22-02654 D/I/Lock-180 60343N027A 09-Black M1-4798 1053.56 0 0 0 1053.56 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO
GU 22-02658 1X1 RIB-270 60343N055A 00-White B2-4596A 0 0 45 0 45 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 00-White B2-4657A 0 0 45 0 45 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 00-White B2-4658A 0 0 45 0 45 18-Dec 16 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 00-White B2-4654B 306 0 0 0 306 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) R/S Not OK BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 00-White B-8663A 0 0 125 0 125 15-Dec 19 A/Compacting QAD (Problematic) Rib Deli Short BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 G/Gain Tape 60343N055A 00-White B2-4655B 0 0 0 1 1.1 0 W.F.Dyeing W.F.Dyeing BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 00-White B2-4882 505 0 0 0 504.5 20-Dec 14 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 00-White B2-4882A 0 0 41 0 40.5 0 W.F.Dyeing W.F.Dyeing BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 00-White B2-4882B 120 0 0 0 120.3 20-Dec 14 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 68-Blue B-8737A 0 0 49 0 48.95 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 68-Blue B-8730A 0 0 51 0 50.8 15-Dec 19 A/Compacting RFD-19/12 BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 68-Blue B-8731A 0 0 52 0 52.25 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 INTERLOCK-170 60343N055A 68-Blue B-8731 637 0 0 0 637.2 15-Dec 19 B4 Compacting On Finishing (Problematic) S/Not Ok BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 68-Blue B-8737 632 0 0 0 632.4 19-Dec 15 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 68-Blue 709 0 38 0 747 0 Batch Due BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 09-Black B2-4719 852 0 0 0 852.4 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) Re-Process BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 09-Black B2-4722 187 0 0 0 187 15-Dec 19 A/Compacting RFD-20/12 BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 09-Black B2-4719A 0 0 64 0 64.3 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 G/Gain Tape 60343N055A 09-Black B2-4719B 0 0 0 1 0.8 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 09-Black B2-4722A 0 0 66 0 66.45 15-Dec 19 A/Compacting RFD-20/12 BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 09-Black B2-4735A 0 0 63 0 63.15 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1X1 RIB-270 60343N055A 09-Black B2-4736A 0 0 33 0 33.1 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 09-Black B-7914 677 0 0 0 677 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) W.F.Appv BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 09-Black 699 0 0 0 699 0 Batch Due 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1x1Rib-270 60343N055A 55-Green M1-4915 A 0 0 93 0 93.1 0 W.F.Dyeing W.F.Dyeing METRO 3 4-Nov 24-Jan 13-Dec 9-Jan
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02658 1x1Rib-270 60343N055A 55-Green M1-4916 A 0 0 87 0 86.9 0 W.F.Dyeing W.F.Dyeing METRO 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 55-Green M1-4915 1210 0 0 0 1210 0 W.F.Dyeing W.F.Dyeing METRO 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 G/Gain Tape 60343N055A 55-Green M1-4915 B 0 0 1 0 0.7 0 W.F.Dyeing W.F.Dyeing 700 YDS METRO 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 55-Green 2423 0 18 0 2441 0 Batch Due METRO 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 04-Grey B-8558 193 0 0 0 193 15-Dec 19 A/Compacting QAD (Problematic) (S/Not Ok) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1x1Rib-270 60343N055A 04-Grey B-8558A 0 0 49 0 48.5 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1x1Rib-270 60343N055A 04-Grey B-8564A 0 0 48 0 48 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 04-Grey M1-4915 1210 0 0 0 1209.6 20-Dec 14 W.F.Dyeing Dyeing Run BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 G/Gain Tape 60343N055A 04-Grey M1-4915 B 0 0 0 1 0.7 0 W.F.Dyeing W.F.Dyeing 700 YDS BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 1x1Rib-270 60343N055A 04-Grey B-9013A 0 0 54 0 53.65 0 W.F.Dyeing W.F.Dyeing BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02658 I/Lock-170 60343N055A 04-Grey 118 0 0 0 118 0 Batch Due BEACON 3 4-Nov 24-Jan 13-Dec 9-Jan
GU 22-02661 Ly5x2Rib-270 60143H004A 01-Off White M1-3852 0 0 130 0 130 15-Dec 19 A/Compacting Color Spot Noit Ok METRO 3 4-Nov 29-Nov 13-Nov 20-Nov 5
GU 22-02667 Ly4x2Rib-220 60143N123A 01-Off White B2-4845 0 0 639 0 639 0 W.F.Dyeing W.F.Dyeing BEACON 3 4-Nov 17-Jan
GU 22-02667 Ly4x2Rib-220 60143N123A 01-Off White Bcon 0 0 3820 0 3820 0 Batch Due BEACON 3 4-Nov 17-Jan
GU 22-02667 Ly4x2Rib-220 60143N123A 09-Black M1-5030 1027 0 1027.4 0 W.F.Dyeing W.F.Dyeing METRO 3 4-Nov 17-Jan
GU 22-02667 Ly4x2Rib-220 60143N123A 09-Black Metro 0 0 1575 0 1575 0 Batch Due METRO 3 4-Nov 17-Jan
GU 22-02667 Ly4x2Rib-220 60143N123A 46-Yellow Bcon 0 0 1856 0 1856 0 Batch Due BEACON 3 4-Nov 17-Jan
GU 22-02668 Ly4x2Rib-220 60143N123A 01-Off White B2-4856 0 0 621 0 620.87 0 W.F.Dyeing W.F.Dyeing BEACON 4-Nov 24-Jan
GU 22-02668 Ly4x2Rib-220 60143N123A 01-Off White Bcon 0 0 1858 0 1858 0 Batch Due BEACON 4-Nov 24-Jan
GU 22-02668 Ly4x2Rib-220 60143N123A 09-Black Metro 0 0 1471 0 1471 0 Batch Due METRO 4-Nov 24-Jan
GU 22-02668 Ly4x2Rib-220 60143N123A 46-Yellow Bcon 0 0 1003 0 1003 0 Batch Due BEACON 4-Nov 24-Jan
S/J-Crinkle 1st batch wf submission (rib wf in-
GU 22-02671 60143N124A 01-Off White B2-4511 604 0 60 0 664 15-Dec 19 A/Compacting QAD (Problematic) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200 house app)
S/J-Crinkle
GU 22-02671 60143N124A 01-Off White B2-4515 625 0 57 0 682 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Rib Due BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle Sub Hold(Sign Back Hanger Not
GU 22-02671 60143N124A 01-Off White B2-4525 605 0 0 0 605 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200 Rcv)
GU 22-02671 Ly1x1Rib-280 60143N124A 01-Off White B2-4525 A 0 0 58 0 58 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 01-Off White B2-4527 634 0 53 0 687 15-Dec 19 A/Compacting On Finishing (Problematic) W.F.Appv BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 Ly1x1Rib-280 60143N124A 01-Off White B2-4527 A 0 0 58 0 58 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 Ly1x1Rib-280 60143N124A 01-Off White B2-4530 0 0 57 0 57 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 Ly1x1Rib-280 60143N124A 01-Off White B2-4531 0 0 58 0 58 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 01-Off White B2-4530 642 0 0 0 642 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle
GU 22-02671 60143N124A 01-Off White B2-4531 634 0 0 0 634 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 S/J DESING-200 60143N124A OFF WHITE B2-4808 632 0 0 0 632.25 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 01-Off White Bcon 438 0 94 0 532 0 Batch Due BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle
GU 22-02671 60143N124A 09-Black M1-4038 1018 0 0 0 1018 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle
GU 22-02671 60143N124A 09-Black M1-4086 1021 0 0 0 1021 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 Ly1x1Rib-280 60143N124A 09-Black M1-4038 A 0 0 92 0 92 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle Back Side Lycra Visible(W.F.Sup
GU 22-02671 60143N124A 09-Black M1-4446 183 0 0 0 183 15-Dec 19 A/Compacting QAD (Problematic) METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200 Paper)
GU 22-02671 Ly1x1Rib-280 60143N124A 09-Black M1-4446 A 0 0 17 0 17 15-Dec 19 A/Compacting QAD (Problematic) S/Not Ok METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 LY1X1RIB-280 60143N124A 09-Black M1-4086 A 0 0 95 0 95 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 09-Black M1-4694 501.4 0 0 0 501.4 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 LY1X1RIB-280 60143N124A 09-Black M1-4694 A 0 0 47.4 0 47.4 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 09-Black M1-4701 884.9 0 0 0 884.9 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 LY1X1RIB-280 60143N124A 09-Black M1-4701 A 0 0 83 0 83 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 12-Pink B-8482 909 0 80 0 989 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle
GU 22-02671 60143N124A 12-Pink B-8269 334 0 0 0 334 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec 1
Design-200
S/J-Crinkle Sub Hold(Sign Back Hanger Not
GU 22-02671 60143N124A 12-Pink B-8269 595 0 0 0 595 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec 1
Design-200 Rcv)
GU 22-02671 Ly1X1 RIB-280 60143N124A 12-Pink B-8269A 0 0 83 0 83 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle Sub Hold(Sign Back Hanger Not
GU 22-02671 60143N124A 64-Blue B2-4554 166 0 0 0 166 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200 Rcv)
GU 22-02671 Ly1X1 RIB-280 60143N124A 64-Blue B2-4554A 0 0 11 0 11 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 64-Blue B2-4600 547 0 0 0 547 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle 1st batch wf submission (rib wf in-
GU 22-02671 60143N124A 64-Blue B2-4600 B 300 0 0 0 300 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200 house app)
S/J-Crinkle
GU 22-02671 60143N124A 64-Blue B2-4604 825 0 0 0 825 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 Ly1X1 RIB-280 60143N124A 64-Blue B2-4604A 0 0 76 0 76 0 W.F.Dyeing W.F.Dyeing BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 Ly1X1 RIB-280 60143N124A 64-Blue B2-4600A 0 0 75 0 75.1 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 7-Nov 20-Dec 4-Dec 19-Dec
S/J-Crinkle
GU 22-02671 60143N124A 73-Purple M1-4051 478 0 0 0 478 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle Sub Hold(Sign Back Hanger Not
GU 22-02671 60143N124A 73-Purple M1-4195 210 0 0 0 210 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200 Rcv)
S/J-Crinkle
GU 22-02671 60143N124A 73-Purple M1-4520 502 0 0 0 502 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
S/J-Crinkle
GU 22-02671 60143N124A 73-Purple M1-4459 1212 0 0 0 1212 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
Design-200
GU 22-02671 Ly1X1 RIB-280 60143N124A 73-Purple M1-4459 A 0 0 108 0 108 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 Ly1X1 RIB-280 60143N124A 73-Purple M1-4051 A 0 0 42 0 42 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 Ly1X1 RIB-280 60143N124A 73-Purple M1-4520 A 0 0 44 0 44 0 W.F.Dyeing W.F.Dyeing METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02671 Ly1X1 RIB-280 60143N124A 73-Purple M1-4195 A 0 0 18 0 18 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 7-Nov 20-Dec 4-Dec 19-Dec
GU 22-02676 I/Lock-230 60243N006A 63-Blue B-8643 1030.1 56.45 0 0 1086.55 0 W.F.Dyeing W.F.Dyeing BEACON
GU 22-02676 I/Lock-230 60243N006A 63-Blue B-8647 1042.4 54.5 0 0 1096.9 0 W.F.Dyeing W.F.Dyeing BEACON
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02676 I/Lock-230 60243N006A 63-Blue B-8662 1087.7 0 0 0 1087.7 15-Dec 19 B4 Compacting On Finishing (Problematic) W.F.Appv BEACON
GU 22-02676 I/Lock-230 60243N006A 63-Blue B-8885 1177 0 0 0 1177.2 0 W.F.Dyeing W.F.Dyeing BEACON
GU 22-02676 1x1Rib-270 60243N006A 63-Blue B-8643A 0 0 110 0 110 19-Dec 15 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON
GU 22-02678 G/Gain Tape 60343H025A 00-White B-8238 0 0 0 1.1 1.1 15-Dec 19 A/Dyeing On Finishing (A/Dye to B4 Comp) 1100 YDS BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 D/I/Lock-180 60343H025A 00-White B-8994 592 0 0 0 592 20-Dec 14 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 D/I/Lock-180 60343H025A 00-White B-8995 591.6 0 0 0 591.6 20-Dec 14 B4 Stenter On Finishing (A/Dye to B4 Comp) BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 D/I/Lock-180 60343H025A 00-White B-9008 538.05 0 0 0 538.05 0 W.F.Dyeing W.F.Dyeing BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 1x1Rib-290 60343H025A 00-White B-8994A 0 0 86.5 0 86.5 0 W.F.Dyeing W.F.Dyeing BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 1x1Rib-290 60343H025A 00-White B-8995A 0 0 89.8 0 89.8 0 W.F.Dyeing W.F.Dyeing BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 1x1Rib-290 60343H025A 00-White B-9008A 0 0 91.4 0 91.4 0 W.F.Dyeing W.F.Dyeing BEACON 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 D/I/Lock-180 60343H025A 09-Black M1-4587 123 0 0 0 123 15-Dec 19 A/Compacting QAD (Problematic) (C/Stain Prob) METRO 2 6-Nov 20-Dec 27-Nov 8-Dec 3

GU 22-02678 D/I/Lock-180 60343H025A 09-Black M1-4611 119 0 0 0 119 15-Dec 19 A/Compacting QAD (Problematic) S/Not Ok METRO 2 6-Nov 20-Dec 27-Nov 8-Dec
GU 22-02678 D/I/Lock-180 60343H025A 09-Black M1-4614 50 0 0 0 50 15-Dec 19 A/Compacting QAD (Problematic) (C/Stain& Shade Not Ok) METRO 2 6-Nov 20-Dec 27-Nov 8-Dec 3

GU 22-02679 D/I/Lock-180 60343H025A 00-White 4251 0 430 0 4681 0 Only For Knitt 2 6-Nov 27-Dec 8-Dec 18-Dec
GU 22-02679 D/I/Lock-180 60343H025A 09-Black 4155 0 421 0 4576 0 Only For Knitt 2 6-Nov 27-Dec 8-Dec 18-Dec
GU 22-02679 D/I/Lock-180 60343H025A Average 3602 0 365 0 3967 0 Only For Knitt 2 6-Nov 27-Dec 8-Dec 18-Dec
GU 22-02680 D/I/Lock-180 60343H025A 00-White 4252 0 430 0 4682 0 Only For Knitt 2 6-Nov 10-Nov 15-Dec 26-Dec
GU 22-02680 D/I/Lock-180 60343H025A 09-Black 4155 0 421 0 4576 0 Only For Knitt 2 6-Nov 10-Nov 15-Dec 26-Dec
GU 22-02680 D/I/Lock-180 60343H025A Average 3602 0 365 0 3967 0 Only For Knitt 2 6-Nov 10-Nov 15-Dec 26-Dec
GU 22-02681 S/J-250 60343H007A 54-Green M1-4063 65 0 0 0 65 15-Dec 19 A/Compacting Deli Short METRO 3 6-Nov 6-Dec 27-Nov 4-Dec
GU 22-02681 S/J-250 60343H007A 54-Green M1-4088 1273 0 0 0 1273 15-Dec 19 A/Compacting Body app but Rib shade not ok METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
GU 22-02681 S/J-250 60343H007A 54-Green M1-4096 1271 0 0 0 1271 15-Dec 19 A/Compacting METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
GU 22-02681 1x1Rib-350 60343H007A 54-Green M1-4088 A 0 0 134 0 134 15-Dec 19 Shade not ok-R2D S/Not Ok METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
GU 22-02681 1x1Rib-350 60343H007A 54-Green M1-4096 A 0 0 133 0 133 15-Dec 19 A/Compacting METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
Body shade not ok from buying
GU 22-02681 S/J-250 60343H007A 54-Green M1-4148 1281 0 0 0 1281 15-Dec 19 A/Compacting METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
house (Rib shade not ok )
GU 22-02681 S/J-250 60343H007A 54-Green M1-4176 182 0 0 0 182 15-Dec 19 A/Compacting Padder Creaz Mark Not Ok METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
GU 22-02681 1x1Rib-350 60343H007A 54-Green M1-4148 A 0 0 141 0 141 15-Dec 19 A/Compacting METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
GU 22-02681 S/J-250 60343H007A 54-Green M1-4413 703 0 3 0 706 0 W.F.Dyeing METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
GU 22-02681 1x1Rib-350 60343H007A 54-Green M1-4413 A 0 0 105 0 105 15-Dec 19 Shade not ok-R2D S/Not Ok METRO 3 6-Nov 6-Dec 27-Nov 4-Dec 5
Body shade not ok from buying -
GU 22-02681 S/J-250 60343H007A 22-Orange B2-4483 438 0 0 0 438 15-Dec 19 A/Compacting BEACON 3 6-Nov 6-Dec 27-Nov 4-Dec 5
house (Rib shade ok)
GU 22-02688 Plated S/J-180 60143N127B 01-Off White M1-4735 780.06 122.9 0 902.96 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 01-Off White M1-4801 206 0 33 0 239 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 01-Off White M1-4861 768.28 0 122.5 0 890.78 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 S/J-160 60143N127B 01-Off White M1-4960 784 0 119 0 902.64 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 01-Off White 789 0 114 0 903 0 Batch Due METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 09-Black M1-4890 912.38 0 141.5 0 1053.88 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-181 60143N127B 09-Black M1-4970 913.14 0 138.3 0 1051.44 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 09-Black M1-5005 912.36 0 142.6 0 1054.96 0 W.F.Dyeing W.F.Dyeing METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 09-Black 2727 0 427 0 3154 0 Batch Due METRO 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 64-Blue B-8743 560.5 0 85.4 0 645.9 18-Dec 16 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 PLATED SIJ-160 60143N127B 64-Blue B-8917 571 0 88 0 659 0 W.F.Dyeing W.F.Dyeing BEACON 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02688 Plated S/J-180 60143N127B 64-Blue 1108 0 167 0 1275 0 Batch Due BEACON 2 6-Nov 10-Jan 8-Jan 23-Jan
GU 22-02722 1x1Rib-270 55-Green M1-4887 A 0 0 29 0 29 0 W.F.Dyeing W.F.Dyeing METRO
GU 22-02731 S/J-250 60343H007A 09-Black 8102 0 872 0 8974 0 Batch Due 3 11-Nov 27-Dec 8-Dec 18-Dec
GU 22-02731 S/J-250 60343H007A Average 15364 0 1655 0 17019 0 Batch Due 3 11-Nov 27-Dec 8-Dec 18-Dec
GU 22-02731 S/J-250 60343H007A 30-Natural 5121 0 552 0 5673 0 Batch Due 3 11-Nov 27-Dec 8-Dec 18-Dec
GU 22-02733 Ly1x1Rib-260 60342F010A 00-White M1-4403 A 0 0 42 0 42 15-Dec 19 Shade not ok-R2D QAD (Problematic) 6 METRO 2 11-Nov 13-Dec 27-Nov 4-Dec
GU 22-02733 Ly1x1Rib-260 60342F010A 00-White M1-4404 A 0 0 45 0 45 15-Dec 19 Shade not ok-R2D RFD-20/12 METRO 2 11-Nov 13-Dec 27-Nov 4-Dec
GU 22-02733 I/Lock-200 60342F010A 00-White M1-4403 186 0 0 0 186 15-Dec 19 A/Compacting QAD (Problematic) (S/Not Ok) METRO 2 11-Nov 13-Dec 27-Nov 4-Dec
GU 22-02733 I/Lock-200 60342F010A 00-White M1-4404 51 0 0 0 51 15-Dec 19 A/Compacting RFD-20/12 METRO 2 11-Nov 13-Dec 27-Nov 4-Dec
GU 22-02733 I/Lock-200 60342F010A 00-White M1-4985 51 0 0 0 50.55 0 W.F.Dyeing W.F.Dyeing For Shrinkage Test METRO 2 11-Nov 13-Dec 27-Nov 4-Dec
GU 22-02733 I/Lock-200 60342F010A 08-Dk Grey M1-4177 107 0 0 0 107 15-Dec 19 A/Compacting RFD-20/12(55Kg Slicon Spot) METRO 2 11-Nov 13-Dec 27-Nov 4-Dec
GU 22-02733 I/Lock-200 60342F010A 08-Dk Grey M1-4439 0 0 28 0 28 15-Dec 19 A/Compacting QAD (Problematic) Rib Uneven N/Ok METRO 2 11-Nov 13-Dec 27-Nov 4-Dec 3

GU 22-02749 I/Lock-230 60243N007B 57-Olive B-8485 263 6 0 0 269 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 31-Jan 20-Dec 16-Jan
GU 22-02749 I/Lock-230 60243N007B 57-Olive B-8485A 0 0 30 0 30 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 31-Jan 20-Dec 16-Jan
GU 22-02749 I/Lock-230 60243N007B 69-Navy B-8606 101 2 0 0 103 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Body app but Rib dyeing due BEACON 3 13-Nov 31-Jan 20-Dec 16-Jan
GU 22-02749 1x1Rib-270 60243N007B 69-Navy B-8606A 0 0 11 0 11 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 31-Jan 20-Dec 16-Jan
GU 22-02751 1x1Rib-270 60343N096A Dark Brown 39-Y/D M1-4659 0 0 145 0 145 0 W.F.Dyeing W.F.Dyeing METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
GU 22-02751 S/J-200 60343N096A Dark Brown 39-Y/D 3077 0 0 0 3077 0 Batch Due METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
GU 22-02751 1x1Rib-270 60343N096A White 00-Y/D M1-4661 0 0 191 0 191 15-Dec 19 A/Dyeing On Finishing (A/Dye to B4 Comp) METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
GU 22-02751 S/J-200 60343N096A White 00-Y/D M1-5058 284.5 0 0 0 284.5 0 W.F.Dyeing W.F.Dyeing METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
GU 22-02751 S/J-200 60343N096A White 00-Y/D 3769 0 0 0 3769 0 Batch Due METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
GU 22-02751 1x1Rib-270 60343N096A Navy 69-Y/D M1-4660 0 0 166 0 166 0 W.F.Dyeing W.F.Dyeing METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
GU 22-02751 S/J-200 60343N096A Navy 69-Y/D 3525 0 0 0 3525 0 Batch Due METRO 2 13-Nov 31-Jan 1-Jan 16-Jan
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02758 S/J-250 60343H007A 09-Black B2-4611 401 0 0 0 401 19-Dec 15 B4 Stenter On Finishing (A/Dye to B4 Comp) BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4521A 0 0 43 0 43 15-Dec 19 A/Compacting Body D/Ok BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4611A 0 0 43 0 43 15-Dec 19 A/Compacting Body fabric dyeing due BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4652A 0 0 44 0 44 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 S/J-250 60343H007A 09-Black B2-4919 1226.85 0 0 0 1226.85 0 A/Compacting QAD (A/Comp to B4 Store) BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 S/J-250 60343H007A 09-Black B2-4821 1230 0 0 0 1229.5 19-Dec 15 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 S/J-250 60343H007A 09-Black B2-4825 1240 0 0 0 1239.58 20-Dec 14 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4752A 0 0 133 0 132.8 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4819A 0 0 132 0 132 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4821A 0 0 131 0 130.5 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A 09-Black B2-4825A 0 0 117 0 117.2 0 W.F.Dyeing W.F.Dyeing BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 S/J-250 60343H007A 09-Black Bcon 2771 0 320 0 3091 0 Batch Due BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02758 1x1Rib-350 60343H007A Average 16388 0 1765 0 18153 0 Average Color BEACON 3 13-Nov 3-Jan 11-Dec 22-Dec
GU 22-02781 Ly4x3Rib-300 60243N047B 01-Off White B2-4723 0 0 681 0 681 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 01-Off White B2-4724 0 0 683 0 683 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 01-Off White B2-4772 0 0 683.9 0 683.9 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 01-Off White B2-4773 0 0 688.34 0 688.34 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 01-Off White B2-4797 0 0 676 0 676 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 01-Off White 0 0 673 0 673 0 Batch Due BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 09-Black M1-4610 0 0 1011 0 1011 15-Dec 19 S/C Run Dyeing Run S/Not Ok METRO 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 09-Black M1-4627 0 0 1009 0 1009 0 W.F.Dyeing W.F.Dyeing METRO 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 09-Black M1-4680 0 0 1015 0 1015 0 W.F.Dyeing W.F.Dyeing METRO 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 09-Black M1-4767 0 0 1016 0 1016 0 W.F.Dyeing W.F.Dyeing METRO 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 09-Black M1-4820 0 0 969 0 969 0 W.F.Dyeing W.F.Dyeing METRO 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 09-Black M1-4987 0 1375 0 0 1375 0 W.F.Dyeing W.F.Dyeing METRO 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 38-Dk Brown B-8905 918.15 0 0 0 918.15 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 Ly4x3Rib-300 60243N047B 38-Dk Brown B-8699 0 0 921 0 921 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 S/J-150 60243N047B 38-Dk Brown B-8802 0 611 0 0 611 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02781 S/J-150 60243N047B Beige(12-0105) B-8639 0 1070 0 0 1070 0 W.F.Dyeing W.F.Dyeing BEACON 3 15-Nov 24-Jan 29-Dec 9-Jan
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4699 430 4 0 0 434 15-Dec 19 S/C Run QAD (Problematic) S/Not Ok BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Rib-270 60243N065A 27-Orange B2-4699A 0 0 12 0 12 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Rib-270 60243N065A 27-Orange B2-4725A 0 0 12 0 11.5 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Rib-270 60243N065A 27-Orange B2-4726A 0 0 11.5 0 11.5 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Rib-270 60243N065A 27-Orange B2-4727A 0 0 11.22 0 11.22 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Rib-270 60243N065A 27-Orange B2-4728A 0 0 11.43 0 11.43 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Rib-270 60243N065A 27-Orange B2-4729A 0 0 11.35 0 11.35 19-Dec 15 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4725 423 4 0 0 426.5 19-Dec 15 A/Dyeing On Finishing (Problematic) S/Not Ok BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4726 428.2 4 0 0 432.2 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4727 407.25 12 0 0 419.25 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4728 390.7 0 0 0 390.7 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4805 10 0 0 0 10 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 27-Orange B2-4729 352 0 0 0 352 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 09-Black B2-4605 1214 13 0 0 1226.88 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
1st batch submission hold for
GU 22-02788 S/J-220 60243N065A 09-Black B2-4621 1222 13 0 0 1235 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
(Waitimg for re-app sample)
GU 22-02788 S/J-220 60243N065A 09-Black B2-4638 1204 13 0 0 1217 15-Dec 19 B4 Compacting On Finishing (Problematic) W.F.Appv BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4605A 0 0 34 0 34 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4621A 0 0 33 0 33 15-Dec 19 A/Compacting On Finishing (A/Dye to B4 Comp) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4638A 0 0 34 0 34 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4639A 0 0 34 0 34 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4640A 0 0 32 0 32 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 09-Black B2-4639 1214 12 0 0 1226.15 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 09-Black B2-4640 1211 13 0 0 1224.35 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4683A 0 0 35 0 35 0 W.F.Dyeing Dyeing Run BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 09-Black B2-4698 1226 13 0 1238.86 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4698A 0 0 35 0 35 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 1x1Plated Rib-270 60243N065A 09-Black B2-4684A 0 0 21 0 21 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 09-Black B2-4806 10 0 0 0 10 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 09-Black B2-4684 712 7 0 0 719 0 W.F.Dyeing W.F.Dyeing BEACON 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4663 1088 0 0 0 1088 18-Dec 16 A/Dyeing On Finishing (A/Dye to B4 Comp) METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4663 B 104.3 22 0 0 126.3 18-Dec 16 A/Dyeing On Finishing (A/Dye to B4 Comp) METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4663 A 0 0 31 0 31 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4667 A 0 0 27 0 27 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4668 A 0 0 28 0 28 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4669 A 0 0 31.6 0 31.6 15-Dec 19 A/Compacting RFD-20/12 METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02788 S/J-220 60243N065A 30-Natural M1-4669 1204 24 0 0 1227.66 15-Dec 19 A/Compacting RFD-20/12 METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4668 1214 0 0 0 1214.36 0 W.F.Dyeing W.F.Dyeing METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02788 S/J-220 60243N065A 30-Natural M1-4667 561 0 0 0 561 0 W.F.Dyeing W.F.Dyeing METRO 2 15-Nov 27-Dec 8-Dec 18-Dec
GU 22-02811 I/Lock-230 60243N006A 01-Off White M1-4697 306.1 4.88 0 0 310.98 0 W.F.Dyeing W.F.Dyeing METRO 19-Nov 1-Feb
GU 22-02811 1x1Rib-270 60243N006A 01-Off White M1-4697 A 0 0 37.6 0 37.6 0 W.F.Dyeing W.F.Dyeing METRO 19-Nov 1-Feb
GU 22-02811 I/Lock-230 60243N006A 31-Beige B2-4710 167.5 14.87 0 0 182.37 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 19-Nov 1-Feb
GU 22-02811 1x1Rib-270 60243N006A 31-Beige B2-4710A 0 0 22 0 22 0 W.F.Dyeing W.F.Dyeing BEACON 19-Nov 1-Feb
GU 22-02811 I/Lock-230 60243N006A 31-Beige B2-4732 770.4 0 0 0 770.4 15-Dec 19 B4 Compacting On Finishing (A/Dye to B4 Comp) BEACON 19-Nov 1-Feb
GU 22-02811 I/Lock-230 60243N006A 31-Beige B2-4732A 0 0 94.3 0 94.3 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 19-Nov 1-Feb
GU 22-02811 I/Lock-230 60243N006A 31-Beige 183 0 21 0 204 0 BEACON 19-Nov 1-Feb
GU 22-02811 I/Lock-230 60243N006A 09-Black 289 0 35 0 324 0 19-Nov 1-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 41-Yellow 4619 0 361 0 4980 0 Batch Due 2 20-Nov 7-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 00-White 14116 0 1108 0 15224 0 Batch Due 2 20-Nov 7-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 09-Black 5984 0 456 0 6440 0 Batch Due 2 20-Nov 7-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 69-Dk Green 5355 0 412 0 5767 0 Batch Due 2 20-Nov 7-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 15-Red 1576 0 123 0 1699 0 Batch Due 2 20-Nov 7-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 69-Navy 3202 0 243 0 3445 0 Batch Due 2 20-Nov 7-Feb
GU 22-02812 S/J-220(Tube) 60343N001B 30-Natural 927 0 73 0 1000 0 Batch Due 2 20-Nov 7-Feb
GU 22-02815 D/I/Lock-180 60343H025A 00-White B-8496 225 0 0 0 225 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 10-Jan
GU 22-02815 1x1Rib-290 60343H025A 00-White B-8496A 0 0 23 0 23 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 10-Jan
GU 22-02815 G/Gain Tape 60343H025A 00-White B-8497 0 0 0 0 0.23 0 W.F.Dyeing W.F.Dyeing 300 YDS BEACON 2 20-Nov 10-Jan
GU 22-02815 D/I/Lock-180 60343H025A 09-Black M1-4609 270 0 0 0 270.4 0 W.F.Dyeing W.F.Dyeing METRO 2 20-Nov 10-Jan
GU 22-02815 1x1Rib-290 60343H025A 09-Black M1-4609 A 0 0 28 0 28 0 W.F.Dyeing W.F.Dyeing METRO 2 20-Nov 10-Jan
GU 22-02815 D/I/Lock-180 60343H025A 61-Blue B-8549 404 0 0 0 403.55 0 W.F.Dyeing Use Fm Stock 2540/41/42 BEACON 2 20-Nov 10-Jan
GU 22-02815 1x1Rib-290 60343H025A 61-Blue B-8549A 0 0 43 0 42.75 0 W.F.Dyeing Use Fm Stock 2540/41/42 BEACON 2 20-Nov 10-Jan
GU 22-02815 G/Gain Tape 60343H025A 61-Blue B-8549B 0 0 0 0 0.4 0 W.F.Dyeing W.F.Dyeing 400 YDS BEACON 2 20-Nov 10-Jan
Gu 22-02817 S/J-180 60143N023A 01-Off White B-8655 805 0 93 0 897.8 20-Dec 14 B4 Compacting On Finishing (A/Dye to B4 Comp) Rib B4Comp BEACON 21-Nov 7-Jan
Gu 22-02817 S/J-180 60143N023A 01-Off White B-8656 800 0 93 0 892.2 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Sub Hold (Bulk MD Sheet Not Rcv) BEACON 21-Nov 7-Jan
Gu 22-02817 S/J-180 60143N023A 01-Off White B-8692 797 0 89 0 886.05 19-Dec 15 B4 Compacting On Finishing (A/Dye to B4 Comp) Rib B4Comp BEACON 21-Nov 7-Jan
Gu 22-02817 S/J-180 60143N023A 01-Off White B-8694 796 0 89 0 885.3 20-Dec 14 B4 Compacting On Finishing (A/Dye to B4 Comp) Rib B4Comp BEACON 21-Nov 7-Jan
Gu 22-02817 S/J-180 60143N023A 01-Off White B-8800 457 0 66 0 522.6 20-Dec 14 B4 Compacting On Finishing (A/Dye to B4 Comp) Rib B4Comp BEACON 21-Nov 7-Jan
GU 22-02818 S/J-180 60143N023B 62-Blue B-8753 990 0 111 0 1101 15-Dec 19 B4 Compacting On Finishing (Problematic) S/Not OK BEACON 21-Nov 7-Jan
GU 22-02818 S/J-180 60143N023B 62-Blue B-8823 983 0 111 0 1093.1 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 7-Jan
GU 22-02818 S/J-180 60143N023B 62-Blue B-8919 378 0 54 0 432 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 7-Jan
GU 22-02819 S/J-180 60143N023C 22-Orange B-8619 808 0 96 0 904.4 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 7-Jan
GU 22-02819 S/J-180 60143N023C 22-Orange B-8669 104 0 0 0 104 18-Dec 16 A/Compacting RFD-20/12 BEACON 21-Nov 7-Jan
GU 22-02819 S/J-180 60143N023C 22-Orange B-8669 801 0 91 0 891.85 18-Dec 16 A/Compacting RFD-20/12(104Kg S/Not Ok) BEACON 21-Nov 7-Jan
GU 22-02819 S/J-180 60143N023C 22-Orange B-8815 802 93 0 894.74 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8756 600 0 67 0 667 15-Dec 19 A/Compacting QAD (Problematic) Shade N/Ok BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8761 809 0 94 0 903.35 15-Dec 19 A/Compacting On Finishing (A/Dye to B4 Comp) Rib A/Comp BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8778 812 0 95 0 907 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8779 812 0 92 0 904.75 0 A/Compacting QAD (A/Comp to B4 Store) Rib A/Comp BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8785 599 0 68 0 666.9 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) Rib A/Comp BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8940 79 0 16 0 94.9 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 7-Jan
GU 22-02820 S/J-180 60143N125A 01-Off White B-8940A 82 0 11 0 93.38 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 7-Jan
GU 22-02821 S/J-180 60143N125B 73-Purple M1-4724 986 0 113 0 1099.1 0 W.F.Dyeing W.F.Dyeing METRO 21-Nov 7-Jan
GU 22-02821 S/J-180 60143N125B 73-Purple M1-4833 1376 0 160 0 1535.8 0 W.F.Dyeing W.F.Dyeing METRO 21-Nov 7-Jan
GU 22-02822 S/J-180 60143N125C 12-Pink M1-4725 1238 0 147 0 1385.3 15-Dec 19 B4 Compacting On Finishing (Problematic) Shade N/Ok METRO 21-Nov 7-Jan
GU 22-02822 S/J-180 60143N125C PINK-12 M1-4848 A 70 0 0 0 70 0 W.F.Dyeing W.F.Dyeing METRO 21-Nov 7-Jan
GU 22-02822 S/J-180 60143N125C 12-Pink M1-4848 1163 138 0 1300.6 0 W.F.Dyeing W.F.Dyeing METRO 21-Nov 7-Jan
S/J Crinkle
GU 22-02823 60143N124A 01-Off White B2-4839 654 0 0 0 654.37 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 01-Off White B2-4843 654 0 0 0 653.9 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 01-Off White B2-4839A 0 0 57 0 56.55 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 01-Off White B2-4843A 0 0 60 0 60.35 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 01-Off White B2-4858A 0 0 28 0 27.5 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 01-Off White 337 0 0 0 337 0 Batch Due BEACON 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 12-Pink B-8696 475 0 474.9 0 W.F.Dyeing W.F.Dyeing BEACON 2 20-Nov 7-Jan
Design-200
GU 22-02823 Ly1x1Rib-280 60143N124A 12-Pink B-8696A 42 0 41.71 15-Dec 19 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 20-Nov 7-Jan
S/J Crinkle
GU 22-02823 60143N124A 09-Black M1-4742 185 0 184.7 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) W.F/Shade Appv METRO 2 20-Nov 7-Jan
Design-200
GU 22-02823 Ly1x1Rib-280 60143N124A 09-Black M1-4742 A 0 0 16 0 16 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) W.F/Shade Appv METRO 2 20-Nov 7-Jan
GU 22-02823 Ly1x1Rib-280 60143N124A 09-Black M1-4849 A 0 0 128 0 128 0 W.F.Dyeing W.F.Dyeing METRO 2 20-Nov 7-Jan
S/J Crinkle
GU 22-02823 60143N124A 09-Black M1-4849 1457 0 0 0 1457 0 W.F.Dyeing W.F.Dyeing METRO 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 64-Blue 467 0 41 0 508 0 Batch Due 2 20-Nov 7-Jan
Design-200
S/J Crinkle
GU 22-02823 60143N124A 73-Purple M1-4817 467 0 0 0 467 0 W.F.Dyeing W.F.Dyeing METRO 2 20-Nov 7-Jan
Design-200
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02823 Ly1x1Rib-280 60143N124A 73-Purple M1-4817 A 0 0 41 0 41 0 W.F.Dyeing W.F.Dyeing METRO 2 20-Nov 7-Jan
GU 22-02834 S/J-220 60243N113B 27-Orange B2-4674 394 14 0 0 407.65 15-Dec 19 A/Compacting QAD (A/Comp to B4 Store) In Complete-12/12 BEACON 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 27-Orange B2-4674 B 403 0 0 0 403 15-Dec 19 Shade not ok-R2D On Finishing (Problematic) S/Not Ok R2D BEACON 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 27-Orange B2-4674A 0 0 56 0 56 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) BEACON 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 01-Off White M1-4581 814 16 0 0 829.8 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 01-Off White M1-4581 A 0 0 59 0 59.1 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 01-Off White M1-4676 A 0 0 61 0 61.3 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 01-Off White M1-4677 A 0 0 63 0 62.6 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 01-Off White M1-4678 A 0 0 65 0 65.2 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 01-Off White M1-4679 A 0 0 63 0 63.3 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 01-Off White M1-4676 828 21 0 0 848.9 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 01-Off White M1-4677 795 41 0 0 836.35 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 01-Off White M1-4678 836 0 0 0 836 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 01-Off White M1-4679 B 188 0 0 0 188.04 0 A/Compacting QAD (A/Comp to B4 Store) METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 01-Off White Metro 605 0 0 0 605 0 Batch Due METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 09-Black B2-4880 1119 29 0 0 1148.15 0 W.F.Dyeing W.F.Dyeing BEACON 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 09-Black Bcon-02 1134 0 168 0 1302 0 Batch Due BEACON 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 31-Beige B-8615A 0 0 70 0 70 0 W.F.Dyeing W.F.Dyeing BEACON 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 31-Beige B-8615 1012 0 0 0 1011.92 12-Dec 22 B4 Compacting On Finishing (A/Dye to B4 Comp) Re-Process BEACON 2 21-Nov 27-Dec
GU 22-02834 1x1Rib-270 60243N113B 07-Grey M1-4683 A 0 0 92 0 92.4 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02834 S/J-220 60243N113B 07-Grey M1-4683 1295 23 0 0 1317.65 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 1x1Rib-270 60243N113B 31-Beige M1-4695 A 0 0 95 0 94.6 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 1x1Rib-270 60243N113B 31-Beige M1-4696 A 0 0 60 0 60.4 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 31-Beige M1-4696 865 17 0 0 881.48 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 31-Beige M1-4695 1487 27 0 0 1514.3 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 09-Black B2-4818 1071 19 0 0 1090.3 0 W.F.Dyeing W.F.Dyeing BEACON 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 09-Black B2-4774 1162 23 0 1185.1 0 W.F.Dyeing W.F.Dyeing BEACON 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 09-Black B2-4875 1246 20 0 0 1266 0 W.F.Dyeing W.F.Dyeing BEACON 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 01-Off White B-8887 824 82 0 0 906.2 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 SIJ-220 60243N113B 01-Off White B-8892 878 23 0 0 901.25 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 SIJ-220 60243N113B 01-Off White B-8893 914 0 0 0 913.55 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 SIJ-220 60243N113B 01-Off White B-8896 901 0 0 0 901.25 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8887A 0 0 57 0 57.4 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8892A 0 0 58 0 58.1 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8893A 0 0 59 0 59.3 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8896A 0 0 59 0 58.5 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8898A 0 0 61 0 60.8 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8899A 0 0 59 0 58.8 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8900A 0 0 58 0 58.1 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8901A 0 0 61 0 61.4 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8902A 0 0 59 0 58.6 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 1/1RIB -270 60243N113B 01-Off White B-8903A 0 0 64 0 63.7 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 01-Off White B-8898 911 0 0 0 911 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 01-Off White B-8899 901 0 0 0 900.6 0 W.F.Dyeing W.F.Dyeing BEACON 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 01-Off White 3531 65 0 0 3596 0 Batch Due BEACON 21-Nov 27-Dec
GU 22-02835 1X1RIB-270 60243N113B GREY-07 M1-4962 A 0 0 98 0 97.9 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 1X1RIB-270 60243N113B GREY-07 M1-4961 A 0 0 83 0 83.1 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B GREY-07 M1-4962 1503 17 0 0 1520.1 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B GREY-07 M1-4961 1233 18 0 0 1251 0 W.F.Dyeing W.F.Dyeing METRO 2 21-Nov 27-Dec
GU 22-02835 S/J-220 60243N113B 27-Orange B2-4733 1252 24 60 0 1336.58 0 W.F.Dyeing W.F.Dyeing BEACON 2 21-Nov 27-Dec
GU 22-02853 S/J-220 60243N065A 27-Orange B2-4733A 0 0 83 0 82.5 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 27-Orange B2-4739A 0 0 32 0 31.5 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 27-Orange B2-4739 474 8 0 0 481.74 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 27-Orange B2-4793 1264 24 0 0 1288.25 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 27-Orange B2-4890 1250 28 0 0 1277.9 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 27-Orange 4966 0 108 0 5074 0 Batch Due METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4657 1508 11 0 0 1518.86 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4662 1495 11 0 0 1506.4 0 B4 Stenter On Finishing (Problematic) S/Problem METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4657 A 0 0 39 0 39 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4662 A 0 0 39 0 39 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4665 A 0 0 38 0 38 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4666 A 0 0 39 0 39 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4665 1500 19 0 0 1518.58 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4671 193 6 0 0 198.82 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4671 A 0 0 5 0 5 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4666 1483 40 0 0 1522.88 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4681 1485 27 0 0 1511.68 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4682 1482 37 0 0 1519.04 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4681 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4682 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4736 A 0 0 41 0 40.5 0 W.F.Dyeing W.F.Dyeing R2D METRO 24-Nov 1-Feb
GU 22-02853 1x1Rib-270 60243N065A 09-Black M1-4737 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4736 1478 39 0 0 1517.58 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4737 1515 0 0 0 1514.86 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4795 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4796 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4797 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4795 1508 0 0 0 1507.88 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4796 1519 0 0 0 1518.6 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4797 1512 0 0 0 1511.7 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4921 A 0 0 38 0 38 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4922 A 0 0 40 0 39.5 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4923 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black M1-4924 A 0 0 40 0 40 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 09-Black Metro 11903 0 164 0 12067 0 Batch Due METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 30-Natural M1-4957 1502 33 0 0 1534.7 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 30-Natural M1-4958 1522 33 0 0 1555.25 20-Dec 14 W.F.Dyeing Dyeing Run METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 30-Natural M1-4971 1500 38 0 0 1538.3 19-Dec 15 A/Dyeing On Finishing (A/Dye to B4 Comp) METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 30-Natural M1-4975 1535 0 0 0 1535.3 18-Dec 16 B4 Compacting On Finishing (A/Dye to B4 Comp) METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4957 A 0 0 41 0 41 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4958 A 0 0 44 0 44 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4971 A 0 0 43 0 43 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4975 A 0 0 44 0 44 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4990 A 0 0 43 0 43 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4991 A 0 0 43 0 43 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4992 A 0 0 43 0 43 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4993 A 0 0 43 0 43 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4994 A 0 0 43 0 43 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4995 A 0 0 44 0 43.5 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 1X1RIB-270 60243N065A 30-Natural M1-4996 A 0 0 13 0 13 0 W.F.Dyeing W.F.Dyeing METRO 24-Nov 1-Feb
GU 22-02853 S/J-220 60243N065A 30-Natural 9800 0 0 0 9800 0 Batch Due METRO 24-Nov 1-Feb
GU 22-02856 S/J-160 60143N017B 01-Off White M1-4893 800 0 0 0 800.05 0 W.F.Dyeing W.F.Dyeing METRO 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02856 S/J-160 60143N017B 31-Beige 1542 0 0 0 1542 0 W.F.App appv 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02856 S/J-160 60143N017B 62-Blue 1004 0 0 0 1004 0 W.F.App appv 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02856 S/J-160 60143N017B 09-Black M1-4973 902 0 128 0 1029.85 0 W.F.Dyeing W.F.Dyeing METRO 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02856 S/J-160 60143N017B 09-Black 1803 0 252 0 2055 0 W.F.App appv 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02856 S/J-160 60143N017B 69-Navy B-8937 885 0 117 0 1002.4 0 W.F.Dyeing W.F.Dyeing BEACON 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02856 S/J-160 60143N017B 69-Navy 896 0 127 0 1023 0 W.F.App appv 25-Nov 10-Jan 2-Jan 17-Jan
GU 22-02867 G/Gain Tape 60243N002B 00-White B-9002 0 0 0 1 0.5 0 W.F.Dyeing W.F.Dyeing 500 YDS BEACON 27-Nov 1-Feb
GU 22-02867 D/I/Lock-180 60243N002B 00-White 1117 0 55 0 1172 0 Batch Due BEACON 27-Nov 1-Feb
GU 22-02867 D/I/Lock-180 60243N002B 08-Dk Grey M1-4872 689 0 0 0 688.6 20-Dec 14 W.F.Dyeing Dyeing Run METRO 27-Nov 1-Feb
GU 22-02867 1x1Rib-290 60243N002B 08-Dk Grey M1-4872 A 0 0 34 0 34 0 W.F.Dyeing W.F.Dyeing METRO 27-Nov 1-Feb
GU 22-02867 G/Gain Tape 60243N002B 08-Dk Grey M1-4706 0 0 0 1 0.5 0 W.F.Dyeing W.F.Dyeing 500 YDS METRO 27-Nov 1-Feb
GU 22-02867 D/I/Lock-180 60243N002B 09-Black M1-4869 793 0 0 0 793 0 W.F.Dyeing W.F.Dyeing METRO 27-Nov 1-Feb
GU 22-02867 1x1Rib-290 60243N002B 09-Black M1-4869 A 0 0 41 0 41.3 0 W.F.Dyeing W.F.Dyeing METRO 27-Nov 1-Feb
GU 22-02867 G/Gain Tape 60243N002B 09-Black M1-4707 0 0 0 1 0.5 0 W.F.Dyeing W.F.Dyeing 500 YDS METRO 27-Nov 1-Feb
GU 22-02867 G/Gain Tape 60243N002B 58-Dk Green B-9001 0 0 0 1 0.5 0 W.F.Dyeing W.F.Dyeing 500 YDS BEACON 27-Nov 1-Feb
GU 22-02867 D/I/Lock-180 60243N002B 58-Dk Green 614 0 30 0 644 0 Batch Due 27-Nov 1-Feb
GU 22-02883 Ly4x3Rib-300 60243N047B 01-Off White B2-4848 0 0 653 0 652.65 0 W.F.Dyeing W.F.Dyeing BEACON 28-Nov 7-Feb
GU 22-02883 Ly4x3Rib-300 60243N047B 01-Off White 0 0 2280 0 2280 0 Batch Due BEACON 28-Nov 7-Feb
GU 22-02883 Ly4x3Rib-300 60243N047B 09-Black M1-5001 0 0 1013 0 1012.8 0 W.F.Dyeing W.F.Dyeing METRO 28-Nov 7-Feb
GU 22-02883 Ly4x3Rib-300 60243N047B 09-Black 0 992 2781 0 3773 0 Batch Due METRO 28-Nov 7-Feb
GU 22-02883 4/3LY RIB -300 60243N047B 38-Dk Brown B-8920 924 0 0 0 924.25 0 W.F.Dyeing W.F.Dyeing BEACON 28-Nov 7-Feb
GU 22-02883 Ly4x3Rib-300 60243N047B 38-Dk Brown 780 417 0 0 1197 0 Batch Due 28-Nov 7-Feb
GU 22-02883 S/J-150 60243N047B 12-Beige 0105Tcx B-8786 0 627 0 0 627 0 W.F.Dyeing W.F.Dyeing BEACON 28-Nov 7-Feb
GU 22-02894 D/I/Lock-180 04823N226A 00-White B-8651 167 0 0 0 167 0 W.F.Dyeing W.F.Dyeing BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12

GU 22-02894 1x1Rib-290 04823N226A 00-White B-8651A 0 0 13 0 13 0 W.F.Dyeing W.F.Dyeing BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
Gu 22-02894 G/Gain Tape 04823N226A 00-White B-8651B 0 0 0 0 0.24 0 W.F.Dyeing W.F.Dyeing 300 YDS BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02894 D/I/Lock-180 04823N226A 68-Blue B-8658 75 0 0 0 75.46 18-Dec 16 B4 Stenter On Finishing (A/Dye to B4 Comp) BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02894 1x1Rib-290 04823N226A 68-Blue B-8658A 0 0 4 0 4 0 W.F.Dyeing W.F.Dyeing BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
Gu 22-02894 G/Gain Tape 04823N226A 68-Blue B-8658B 0 0 0 0 0.1 0 W.F.Dyeing W.F.Dyeing 300 YDS BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02894 D/I/Lock-180 04823N226A 09-Black M1-4845 145 0 0 0 145.17 0 W.F.Dyeing W.F.Dyeing METRO 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02894 1x1Rib-290 04823N226A 09-Black M1-4845 A 0 0 10 0 9.67 0 W.F.Dyeing W.F.Dyeing METRO 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02894 D/I/Lock-180 04823N226A BLUE 61 B-8654 56 0 0 0 55.74 0 W.F.Dyeing W.F.Dyeing BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02894 1x1Rib-290 04823N226A BLUE 61 B-8654A 0 0 3 0 3 0 W.F.Dyeing W.F.Dyeing BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02894 G/Gain Tape 04823N226A BLUE 61 B-8654B 0 0 0 0 0.1 0 W.F.Dyeing W.F.Dyeing 300 YDS BEACON 2 28-Nov 17-Jan as per Mr.Shakil N/Close-25/12
GU 22-02787 S/J-200 60343N099C PINK-12 M1-4942 20 0 0 0 20 0 W.F.Dyeing W.F.Dyeing METRO 15-Nov 1-Mar 18-Jan 14-Feb
GU 22-02787 S/J-200 60343N099C PINK-12 11096 0 741 0 11837 0 Batch Due METRO 15-Nov 1-Mar 18-Jan 14-Feb
GU 22-02919 S/J-200 60343N075A 09-Black 9219 0 0 0 9219 Batch Due 7-Dec 14-Feb
GU 22-02919 S/J-200 60343N075A 69-Navy 5796 0 0 0 5796 Batch Due 7-Dec 14-Feb
GU 22-02919 S/J-200 60343N075A 33-Khaki 7613 0 0 0 7613 Batch Due 7-Dec 14-Feb
GU 22-02919 S/J-200 60343N075A 00-White 5644 0 0 0 5644 Batch Due 7-Dec 14-Feb
GU 22-02919 Twil Fab 60343N075A 00-White 0 0 0 4538 4538 Batch Due 7-Dec 14-Feb
GU 22-02919 H/B Tape 60343N075A 00-White 0 0 0 594 594 Batch Due 7-Dec 14-Feb
GU 22-02919 S/J-200 60343N075A 30-Natural 4662 0 0 0 4662 Batch Due 7-Dec 14-Feb
GU 22-02919 S/J-200 60343N075A 17-5730 tcx 3548 0 0 0 3548 Batch Due 7-Dec 14-Feb
GU 22-02920 S/J-220 60343N038B 00-White YD B-8939 33 0 0 0 33 W.F.Dyeing W.F.Dyeing BEACON 8-Dec 14-Feb
GU 22-02920 S/J-220 60343N038B 00-White YD 3721 0 0 0 3721 Batch Due BEACON 8-Dec 14-Feb
GU 22-02920 Collar 60343N038B 00-White YD B-8992 0 0 0 2 2 W.F.Dyeing W.F.Dyeing BEACON 8-Dec 14-Feb
GU 22-02920 Collar 60343N038B 00-White YD 0 0 0 335 335 Batch Due BEACON 8-Dec 14-Feb
GU 22-02920 S/J-220 60343N038B 09-Black YD B-8960 25 0 0 0 25 W.F.Dyeing W.F.Dyeing BEACON 8-Dec 14-Feb
GU 22-02920 S/J-220 60343N038B 09-Black YD 3041 0 0 0 3041 Batch Due BEACON 8-Dec 14-Feb
GU 22-02920 Collar 60343N038B 09-Black YD B-8990 0 0 0 3 3 W.F.Dyeing W.F.Dyeing BEACON 8-Dec 14-Feb
GU 22-02920 Collar 60343N038B 09-Black YD 0 0 0 273 273 Batch Due BEACON 8-Dec 14-Feb
GU 22-02920 S/J-220 60343N038B 59-Dk Green YD B-8959 28 0 0 0 28 W.F.Dyeing W.F.Dyeing BEACON 8-Dec 14-Feb
GU 22-02920 S/J-220 60343N038B 59-Dk Green YD 1743 0 0 0 1743 Batch Due BEACON 8-Dec 14-Feb
GU 22-02920 Collar 60343N038B 59-Dk Green YD B-8991 0 0 0 3 3 W.F.Dyeing W.F.Dyeing BEACON 8-Dec 14-Feb
GU 22-02920 Collar 60343N038B 59-Dk Green YD 0 0 0 155 155 Batch Due BEACON 8-Dec 14-Feb
GU 22-02921 S/J-200 60343N075A 09-Black 3424 0 0 0 3424 Batch Due 12-Dec 28-Mar
GU 22-02921 S/J-200 60343N075A 69-Navy 2179 0 0 0 2179 Batch Due 12-Dec 28-Mar
GU 22-02921 S/J-200 60343N075A 33-Khaki 2841 0 0 0 2841 Batch Due 12-Dec 28-Mar
GU 22-02921 S/J-200 60343N075A 00-White 2096 0 0 0 2096 Batch Due 12-Dec 28-Mar
GU 22-02921 Twil Fab 60343N075A 00-White 0 0 0 1693 1693 Batch Due 12-Dec 28-Mar
GU 22-02921 H/B Tape 60343N075A 00-White 0 0 0 222 222 Batch Due 12-Dec 28-Mar
GU 22-02921 S/J-200 60343N075A 30-Natural 1739 0 0 0 1739 Batch Due 12-Dec 28-Mar
GU 22-02921 S/J-200 60343N075A 17-5730 tcx 1334 0 0 0 1334 Batch Due 12-Dec 28-Mar
GU 22-02926 S/J-220 60243N113B 27-Orange 1213 0 83 0 1296 Batch Due 8-Dec 26-Feb
GU 22-02926 S/J-220 60243N113B 01-Off White 6018 0 437 0 6455 Batch Due 8-Dec 26-Feb
GU 22-02926 S/J-220 60243N113B 09-Black 3209 0 250 0 3459 Batch Due 8-Dec 26-Feb
GU 22-02926 S/J-220 60243N113B 31-Beige 1497 0 104 0 1601 Batch Due 8-Dec 26-Feb
GU 22-02926 S/J-220 60243N113B 07-Grey 1837 0 135 0 1972 Batch Due 8-Dec 26-Feb
GU 22-02927 S/J-220 60343N038B 00-White YD 16185 0 0 0 16185 Batch Due 13-Dec 28-Mar
GU 22-02927 Collar 60343N038B 00-White YD 0 0 0 1425 1425 Batch Due 13-Dec 28-Mar
GU 22-02927 H/B Tape 60343N038B 00-White 0 0 0 112 112 Batch Due 13-Dec 28-Mar
GU 22-02927 S/J-220 60343N038B 09-Black YD 12825 0 0 0 12825 Batch Due 13-Dec 28-Mar
GU 22-02927 Collar 60343N038B 09-Black YD 0 0 0 1121 1121 Batch Due 13-Dec 28-Mar
GU 22-02927 H/B Tape 60343N038B 09-Black 0 0 0 88 88 Batch Due 13-Dec 28-Mar
GU 22-02927 S/J-220 60343N038B 59 Dk Green YD 7435 0 0 0 7435 Batch Due 13-Dec 28-Mar
GU 22-02927 Collar 60343N038B 59 Dk Green YD 0 0 0 650 650 Batch Due 13-Dec 28-Mar
GU 22-02927 H/B Tape 60343N038B 59 Dk Green 0 0 0 51 51 Batch Due 13-Dec 28-Mar
GU 22-02928 S/J-220 60343N038B 00-White YD 9077 0 0 0 9077 Batch Due 13-Dec 28-Mar
GU 22-02928 Collar 60343N038B 00-White YD 0 0 0 796 796 Batch Due 13-Dec 28-Mar
GU 22-02928 H/B Tape 60343N038B 00-White 0 0 0 63 63 Batch Due 13-Dec 28-Mar
GU 22-02928 S/J-220 60343N038B 09-Black YD 7086 0 0 0 7086 Batch Due 13-Dec 28-Mar
GU 22-02928 Collar 60343N038B 09-Black YD 0 0 0 618 618 Batch Due 13-Dec 28-Mar
GU 22-02928 H/B Tape 60343N038B 09-Black 0 0 0 49 49 Batch Due 13-Dec 28-Mar
GU 22-02928 S/J-220 60343N038B 59 Dk Green YD 4051 0 0 0 4051 Batch Due 13-Dec 28-Mar
GU 22-02928 Collar 60343N038B 59 Dk Green YD 0 0 0 354 354 Batch Due 13-Dec 28-Mar
GU 22-02928 H/B Tape 60343N038B 59 Dk Green 0 0 0 28 28 Batch Due 13-Dec 28-Mar
GU 22-02958 Ly5X2Rib-270 60143H004A 01-Off White M1-4982 0 0 200 0 200 0 W.F.Dyeing W.F.Dyeing METRO 11-Dec 10-Jan
GU 22-02958 Ly5X2Rib-270 60143H004A 01-Off White M1-5013 0 0 904 0 903.56 0 W.F.Dyeing W.F.Dyeing METRO 11-Dec 10-Jan
GU 22-02958 Ly5X2Rib-270 60143H004A 01-Off White Metro 0 0 2215 0 2215 0 Batch Due METRO 11-Dec 10-Jan
Tube- C/C & Aging K&D Rcv
Buyer Inst Fab type/GSM Style Color Batch No Body S/j Rib Drw. Batch qty Dye date date Position Area Remarks Floor Unit date Ship Date TnA Start TnA End Gmts C/Date Priroty Pag Submit Aging

GU 22-02961 S/J-180 60343N066A 41-Yellow 359 0 26 0 385 Batch Due 13-Dec 14-Feb
GU 22-02962 I.Lock-230 60243N007A 01-Off White 3341 0 277 0 3618 Batch Due 12-Dec 14-Feb
GU 22-02962 I.Lock-230 60243N007A 12-Pink 3633 0 326 0 3959 Batch Due 12-Dec 14-Feb
GU 22-02962 I.Lock-230 60243N007A 09-Black 2307 0 196 0 2503 Batch Due 12-Dec 14-Feb
GU 22-02962 I.Lock-230 60243N007A 69-Navy 258 0 17 0 275 Batch Due 12-Dec 14-Feb
GU 22-02978 S/J-220 04823N036A 00-White 50 0 5 0 55 0 Batch Due 13-Dec 1-Feb
GU 22-02978 G/Gain Tape 04823N036A 00-White 0 0 0 0 0.4 0 Batch Due 13-Dec 1-Feb
GU 22-02978 S/J-220 04823N036A 09-Black 30 0 3 0 33 0 Batch Due 13-Dec 1-Feb
GU 22-02978 G/Gain Tape 04823N036A 09-Black 0 0 0 0 0.3 0 Batch Due 13-Dec 1-Feb
GU 22-02978 S/J-220 04823N036A 12-Pink 54 0 5 0 59 0 Batch Due 13-Dec 1-Feb
GU 22-02978 G/Gain Tape 04823N036A 12-Pink 0 0 0 0 0.4 0 Batch Due 13-Dec 1-Feb
GU 22-02978 S/J-220 04823N036A 64-Blue 79 0 7 0 86 0 Batch Due 13-Dec 1-Feb
GU 22-02978 G/Gain Tape 04823N036A 64-Blue 0 0 0 1 0.7 0 Batch Due 13-Dec 1-Feb
Dyeing Fabric
Ship Order Fabric Qty Fabric Qty Knitting Fabric
Style KD ins
Date Qty
Body Part Fabrication Color
[ Finish] KG [ Grey] KG complete Qty
Complete Approval
Delivery Qty
Remarks
Qty Status
Image

Spacer
Interlock  09/Black 9179 10087
Outer ( Ctn ,
Part Poly,
Lycra) 340
GSM 30/
4066 4568
11/10/2022
Natural
60142H12
0B[JP+TW BKL-FB- 40,90
1st PO] 22-02053 0 pcs 2X2 CVC 01/Off
Inner part 7194 7906
Lycra Rib , white
[Contrast]
300 GSM
Mint 3187 3580
S/J Lycra 09/Black 3969 4361
Lining
polyester, 30/
part 160 Gsm Natural 1758 1975

Requeste
Knitting d
Total plan was Delivery
fabric 29,353 32,477 confirmed 01/09-
Qty= [25/8- 15/09 by
10/9] CPD. Pls
confirm
Buyer

G.TOTAL Total= 10302.91 0 739.7 0

Buyer Inst Fab type/GSM Style Color Batch No Body Tube-S/j Rib C/C & Drw.

GU 22-02242 I/Lock-200 60343N052B 00-White B-8376 250 0 0 0

GU 22-02242 I/Lock-200 60343N052B 00-White B-8377 442 0 0 0

GU 22-02242 I/Lock-200 60343N052B 00-White B-8419 282 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3428 182 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3757 998.01 0 0 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3757 A 0 0 68 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3761 A 0 0 69 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3762 A 0 0 72 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3763 A 0 0 71 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3764 A 0 0 70 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3765 A 0 0 40 0

GU 22-02242 1x1Rib-250 60343N052B 09-Black M1-3428 A 0 0 16 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3761 1008 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3762 1012 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3763 510 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3763 B 508 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3764 985 0 0 0

GU 22-02242 I/Lock-200 60343N052B 09-Black M1-3765 556 0 0 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4339 189 0 0 0

GU 22-02244 1x1Rib-250 60343N053B 38-Brown B2-4339A 0 0 15 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4474 708 0 0 0

GU 22-02244 1x1Rib-250 60343N053B 38-Brown B2-4474A 0 0 62 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-5474 742 0 0 0

GU 22-02244 1x1Rib-250 60343N053B 38-Brown B2-4574A 0 0 60 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4631 742 0 0 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B2-4631A 0 0 62 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B-8650 738 0 0 0

GU 22-02244 1x1Rib-250 60343N053B 38-Brown B-8650A 0 0 60 0

GU 22-02244 I/Lock-200 60343N053B 38-Brown B-8702 251 0 0 0

GU 22-02244 1x1Rib-250 60343N053B 38-Brown B-8702A 0 0 13 0

GU 22-02244 1x1Rib-250 60343N053B 38-Brown B-8702B 0 0 10 0


GU 22-02244 1x1Rib-250 60343N053B 00-White B-8346A 0 0 52 0

GU 22-02244 I/Lock-200 60343N053B 00-White B-8396 199 0 0 0

Particular= bcon bcon-02 Metro total kgs


A/Comp= 693 0 2804 3497 Kgs
B4Comp= 798 62 2528 3388 Kgs
B4Stenter= 532 0 0 532 Kgs
S/Curr Run= 0 742 0 742 Kgs
S/Not Ok= 0 0 182 182 Kgs
W.F.Dyeing 273.95 1776 651 2701 Kgs
Total= 2296.95 2580 6165 11042 Kgs
Buyer- GU Order wise Summary

11042.61 Kgs

Batch qty Dye date Aging date Position Area

250 15-Dec 4 B4 Stenter On Finishing (A/Dye to B4 Comp)

442 15-Dec 4 A/Compacting QAD (Problematic)

282 15-Dec 4 B4 Stenter On Finishing (A/Dye to B4 Comp)

182 15-Dec 4 Shade not ok-R2D On Finishing (Problematic)

998.01 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

68 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

69.2 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

72 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

71 0 W.F.Dyeing W.F.Dyeing

70 0 W.F.Dyeing W.F.Dyeing

40 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

16 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

1008 15-Dec 4 B4 Compacting On Finishing (Problematic)

1012 15-Dec 4 B4 Compacting On Finishing (A/Dye to B4 Comp)

510 0 W.F.Dyeing W.F.Dyeing

508 15-Dec 4 B4 Compacting On Finishing (A/Dye to B4 Comp)

985 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

556 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

189 0 W.F.Dyeing Dyeing Run

15 0 W.F.Dyeing W.F.Dyeing

708 0 W.F.Dyeing W.F.Dyeing

62 0 W.F.Dyeing W.F.Dyeing

742.03 0 W.F.Dyeing W.F.Dyeing

60 0 W.F.Dyeing W.F.Dyeing

742.42 15-Dec 4 S/C Run Dyeing Run

62 15-Dec 4 B4 Compacting On Finishing (A/Dye to B4 Comp)

738 15-Dec 4 B4 Compacting On Finishing (Problematic)

60 15-Dec 4 B4 Compacting On Finishing (A/Dye to B4 Comp)

251.45 0 W.F.Dyeing W.F.Dyeing

12.5 0 W.F.Dyeing W.F.Dyeing

10 0 W.F.Dyeing W.F.Dyeing
52 15-Dec 4 A/Compacting QAD (A/Comp to B4 Store)

199 15-Dec 4 A/Compacting QAD (Problematic)


Date 19/Dec

Remarks Floor Unit K&D Rcv date Ship Date

METRO 2 11-Sep 3-Jan

Gsm High,R/Shade & Shade Prob) METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

1st batch 2nd time shade not ok from buying house METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

Only Stenter METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

METRO 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

S/Not OK BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

S/Not Ok BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan

BEACON 2 11-Sep 3-Jan


BEACON 2 11-Sep 3-Jan

(S/Not Ok)Partial BEACON 2 11-Sep 3-Jan


Buyer- GU Order wise Summary
G.TOTAL Total= 443.2 29.5 0.64 473.34
C/C &
Buyer Inst Fab type/GSM Style Color Batch No Body Rib Drw. Batch qty Position

GU 22-02894 D/I/Lock-180 04823N226A 00-White B-8651 167 0 0 167 W.F.Dyeing

GU 22-02894 1x1Rib-290 04823N226A 00-White B-8651A 0 13 0 13 W.F.Dyeing

Gu 22-02894 G/Gain Tape 04823N226A 00-White B-8651B 0 0 0 0.1 W.F.Dyeing

GU 22-02894 D/I/Lock-180 04823N226A 68-Blue B-8658 75 0 0 75.46 W.F.Dyeing

GU 22-02894 1x1Rib-290 04823N226A 68-Blue B-8658A 0 4 0 4 W.F.Dyeing

Gu 22-02894 G/Gain Tape 04823N226A 68-Blue B-8658B 0 0 0 0.1 W.F.Dyeing

GU 22-02894 D/I/Lock-180 04823N226A 09-Black M1-4845 145 0 0 145.17 W.F.Dyeing

GU 22-02894 1x1Rib-290 04823N226A 09-Black M1-4845 A 0 10 0 9.67 W.F.Dyeing

GU 22-02894 D/I/Lock-180 04823N226A BLUE 61 B-8654 56 0 0 55.74 W.F.Dyeing

GU 22-02894 1x1Rib-290 04823N226A BLUE 61 B-8654A 0 3 0 3 W.F.Dyeing

GU 22-02894 G/Gain Tape 04823N226A BLUE 61 B-8654B 0 0 0 0.1 W.F.Dyeing


Date 19/Dec

Remarks Floor Unit

BEACON 2

BEACON 2

300 YDS BEACON 2

BEACON 2

BEACON 2

300 YDS BEACON 2

METRO 2

METRO 2

BEACON 2

BEACON 2

300 YDS BEACON 2