WELL NAME: FN 76-2 RIG: GW 43(DQ)
CEMENTING DESIGN
Prepared By :
CEMENTING ENGINEER
Approved By :
DRILLING SUPERVISOR
2、Well Schematic
16"Casing ×16.32m
10 3/4"Casing ×484.09m
14 3/4"×486.0m
3、Mud property
Density(g/cm3) FV(s)
1.09 50
4、Basic data
5、Volume
Item Superposition Sect Casing and Open Hole Sump Hole(m3) Plug(m3) exce Total
(m3) ss (m3)
Lead Slurry 0.06 ×16 = 0.97 0.052 × 222 = 11.5 70% 20.4
Tail Slurry 0.052 × 234.1 = 12.1 0.110 × 1.9 = 0.21 ### × 12 = 0.6 30% 16.6
6、Cement
Lead Slurry
Density: 1.51 g/cm3
Yield: 1.338 m3/t
Cement: 15.28 t
Tail Slurry
Density: 1.89 g/cm3
Yield: 0.760 m3/t
Cement: 21.88 t
Total Cement: 37.16 t
Prepare Cement: 85.0 t
7、Mix water
Lead Slurry
Mix Water 15.7 m3
Access: 0 m3
Total Volume: 15.7 m3
Tail Slurry
8、Chemical
Lead Slurry
Antifoam: SD52 0.30% BWOC 0.30% × ### / 1.06 × 1000 = 45 kg
Tail Slurry
Antifoam: SD52 0.30% BWOC 0.30% × ### / 0.45 × 1000 = 93 kg
DQE International Sudan Branch
CEMENTING
9、Pilot test
Testing T: 40 Deg.C
Testing P: 0.2 Mpa
Intial/Final Setting Time:
Lead Slurry
Intial/Final Setting Time: 3 ~ 4 hrs
Tail Slurry
Intial/Final Setting Time: 1.5 ~ 2 hrs
Free Water Test
Lead slurry : Free Water: ≤ 3.00%
Tail slurry : Free Water: ≤ 1.50%
Remark:
Others: 30 min
11、Pressure of operation
Circulating pressure: 1.1 Mpa
12、Pipe string
Discription unit QTY Length(m) Depth(m)
Displace with mud by rig pump 18.6 m3 ; 1.09 g/cm3;rate: 0.8-1.0 m3/min;
Displace with mud by cement pump 3.0 1.00 g/cm3;rate: 0.5-1.0 m3/min;