Matrix Excelcon Sdn Bhd

Tiara Sendayan Precinct 1


Sewerage Work
225 = 0.27mt/m
Backdrop 300 = 0.32mt/m
(Different 1.2m dia. Sewerage Manhole 1.35m dia. Sewerage Manhole 375 =
Level >1m) 0.44m3/ 0.37mt/m
Date: 20/6/2018 Schedule of Works Straight Pipe Kumbahan 300m/roll m height 450 = 0.45mt/m
1.2m ø Chamber 1.35m ø Chamber Manhole
VCP Pipe (Nos) RCP Pipe (Nos) 6" x 9" T- 9 x (Nos) (Nos) Cover (Nos) Concrete for
Main manhole
Pipe Duration Start End 9" Y- 6" x Juncti 90˚ Outer Outer Sewerage haunching Aggregate Remarks
Length 150ø x 225ø x 450ø x 600ø Juncti 90˚ on Bend 3' x 4' 4' x 4' 5' x 4' Ring 5' x Manhole 3' x 4.5' 4' x 4.5' 5' x 4.5' Ring 5.5' Manhole Detectable (G20)
Item Manhole Block Unit (m) Depth, D 1.50m 1.75m 3m x 3m on Bend 4' (Nos) Top Slab x 4' (Nos) Top Slab Tape (rolls)

1 MH 61-MH 62 ST-1, DT-6 32 100 1.2 4 160 57 - - 32 32 - - 1 1 1 1 0.33 0.53 27

2 MH 62-MH 63 ST-18, DT-7 16 64 1.2 2 80 37 - - 16 16 - - 1 1 1 1 0.21 0.53 17.28

3 MH 69-MH 70 DT-4, DT-5 33 100 1.2 4 21/6 165 57 - - 33 33 - - 1 1 1 1 0.33 0.53 27

4 MH 70-MH 70a DT-8, DT-9 20 68 1.2 2 22/6 23/6 100 39 - - 20 20 - - 1 1 1 1 0.23 0.53 18.36

5 MH 70a-MH 71 DT-8, DT-9 - 12 3 0 22/6 23/6 - 7 - - 0 0 - - 1 1 2 1 1 0.04 1.32 3.24

6 MH 72-MH 73 DT-2, DT-3 34 100 1.2 4 24/6 27/6 170 57 - - 34 34 - - 1 1 1 1 0.33 0.53 27

7 MH 73-MH 74 DT-10, DT-11 22 92 1.2 3 28/6 30/6 110 53 - - 22 22 - - 1 1 1 1 0.31 0.53 24.84

8 MH 58-MH 59 ST-2, ST-3 34 100 1.2 4 1/7 3/7 170 57 - - 34 34 - - 1 1 1 1 0.33 0.53 27

9 MH 59-MH 60 ST-16, ST-17 10 58 1.2 2 4/7 5/7 50 33 - - 10 10 - - 1 1 1 1 0.19 0.53 15.66

10 MH 55-MH 56 ST-4, ST-5 34 100 1.2 4 6/7 9/7 170 57 - - 34 34 - - 1 1 1 1 0.33 0.53 27

11 MH 56-MH 57 ST-14, ST-15 12 58 1.2 2 10/7 11/7 60 33 - - 12 12 - - 1 1 1 1 0.19 0.53 15.66

12 MH 76-MH 77 DT-1 32 100 1.2 4 12/7 14/7 160 57 - - 32 32 - - 1 1 1 1 0.33 0.53 27

13 MH 77-MH 79 DT-12 12 55 1.2 2 15/7 16/7 60 31 - - 12 12 - - 1 1 1 1 0.18 0.53 14.85

14 MH 79 - Precint 2 Main Line - - 3.04 0 16/7 16/7 - - - - 0 0 2 2 1 1 2 1 1 1.34

15 MH 75-MH 79 DT-13 26 89 1.2 3 17/7 19/7 130 51 - - 26 26 - - 1 1 1 1 0.30 0.53 24.03

16 MH 66-MH 67 DT-15, DT-16 30 93 1.2 3 20/7 22/7 150 53 - - 30 30 - - 1 1 1 1 0.31 0.53 25.11

17 MH 64-MH 65 DT-14 15 93 1.2 2 23/7 25/7 75 53 - - 15 15 - - 1 1 1 1 0.31 0.53 25.11

18 MH 44-MH 45 ST-6, ST-7 18 60 1.2 2 26/7 27/7 90 34 - - 18 18 - - 1 1 1 1 0.20 0.53 16.2

19 MH 46-MH 47 ST-8, ST-9 18 60 1.2 2 28/7 29/7 90 34 - - 18 18 - - 1 1 1 1 0.20 0.53 16.2

20 MH 48-MH 49 ST-10, ST-11 18 60 1.2 2 30/7 31/7 90 34 - - 18 18 - - 1 1 1 1 0.20 0.53 16.2

21 MH 52-MH 53 ST-12, ST-13 24 87 1.2 3 1/8 3/8 120 50 - - 24 24 - - 1 1 1 1 0.29 0.53 23.49

22 MH 12-MH 53 Main Line - 37 1.4 1 4/8 4/8 - - 12 - 0 0 - - 1 1 1 1 0.12 0.62 11.84

23 MH 53-MH 54 Main Line - 43 1.55 1 5/8 5/8 - - 14 - 0 0 - - 1 1 1 1 0.14 0.68 13.76

24 MH 54-MH 57 Main Line - 29 2.4 0 5/8 5/8 - - 10 - 0 0 - - 1 1 2 1 1 0.10 1.06 9.28

25 MH 57-MH 60 Main Line - 58 1.7 1 6/8 6/8 - - 19 - 0 0 - - 1 1 1 1 0.19 0.75 18.56

26 MH 60-MH 63 Main Line - 58 1.9 1 7/8 7/8 - - 19 - 0 0 - - 2 1 1 1 0.19 0.84 18.56

27 MH 63-MH 68 Main Line - 36 2.55 1 8/8 8/8 - - 12 - 0 0 - - 1 1 2 1 1 0.12 1.12 11.52

28 MH 68-MH 71 Main Line - 23 2.7 0 8/8 8/8 - - 8 - 0 0 - - 1 1 2 1 1 0.08 1.19 7.36

29 MH 71-MH 74 Main Line - 58 2.8 1 9/8 9/8 - - - 19 0 0 - - 1 1 2 1 1 0.19 1.23 21.46

30 MH 74-MH 79 Main Line - 58 2.92 1 10/8 10/8 - - - 19 0 0 - - 1 1 2 1 1 0.19 1.28 21.46

31 MH 45-MH 47 Main Line - 60 2.2 1 11/8 11/8 - 34 - - 0 0 - - 2 1 1 1 0.20 0.97 16.2

32 MH 47-MH 49 Main Line - 58 1.7 1 12/8 12/8 - 33 - - 0 0 - - 1 1 1 1 0.19 0.75 15.66

33 MH 49-MH 54 Main Line - 32 2.1 1 13/8 13/8 - 18 - - 0 0 - - 2 1 1 1 0.11 0.92 8.64

34 MH 65-MH 67 Main Line - 65 1.2 1 14/8 14/8 - 37 - - 0 0 - - 1 1 1 1 0.22 0.53 17.55

35 MH 67-MH 68 Main Line - 34 2.2 1 15/8 15/8 - 19 - - 0 0 - - 2 2 1 1 0.11 0.97 9.18

Minus 0.5m Y-Junction 440 (220) - - - - (126) - - - - - -


440 429 2200 902 95 39 440 440 2 2 26 2 3 29 26 6 5 4 14 9 35.00 7.33 25.59 619.26

Note:
(1) 1 Unit house needs 5 nos VCP 150ø with 1.50m length per nos.
(2) 1 Unit house needs 1 nos. 90 degree bend 150ø VCP pipe.
(3) 1 Unit house needs 1 nos. Y-Joint 150ø to 225ø.