You are on page 1of 1

WELL SCHEMATIC DIAGRAM

FIELD :
WELL NO : wel 27
Update : 21-Jun-07
###

Tubing and Pump Data


DEPTH LENGTH ID OD
ITEM JTS DESCRIPTION
(m) (m) (inch) (inch)

1 188.00 9.40 20 2.441 2.875 Tubing 2-7/8"


2 188.61 0.61 1 2.441 2.875 Extention Nipple
3 193.49 4.88 1 2.441 2.500 TLE 2-1/2"
4 194.10 0.61 1 2.441 2.875 Extention Nipple
5 194.31 0.21 1 2.441 2.875 PSN
9-5/8" surface casing
@ 193 m 6 203.71 9.40 1 2.441 2.875 Tubing 2-7/8"

Rod Data with Pump + Accessories Information


ROD LENGTH OD
ITEM JTS LENGTH (ft) DESCRIPTION
GRADE (ft/jt) (inch)

1 D 30.02 1 30.020 1.250 Polished Rod 1 1/4"


2 D 0.000 0.750 Pony Rod 3/4"
2 D 25.00 44 1,100.000 0.750 Sucker Rod 7/8"
Sucker rod 3/4" 3 D 25.00 28 700 0.750 Sucker Rod 3/4"
4 16.00 1 16.000 2.000 Plunger TLE 2-1/2"

1,846.020 feet
562.639 meter

Initial Test
Date test Gross Oil WC Remarks
Aug '88 NF 77 m3/d 73 m3/d 5% 903.5 - 906.5 (E1 layer)

Jul '88 Plugged layer8 @ 945 m. Open layer10 925.5 - 927 m; 930.5 - 933 m

Aug '88 Drilling accomplished. Plugged layer 10@ 920 m; perforate 903.5 - 906.5 m (layer5)
Initial test: gross 77 m3/d, WC 5%

Oct '88 add perforation @ 830 - 832 m; 834 - 837 m (layer2).


Commingle production w/layer5. Initial test: Gross 15.6 m3/d; WC 50%

2.5" THM
tubing pump Sep '91 Plug 4& 2 layer. Perforate 807 - 810.5 m ( layer1)
Initial test: gross 10.5 m3/d, WC 80%

Jul '93 add perforation 813 - 814.5 m (layer2); *816 - 824 m (layer2).
Initial test: gross 16.1 m3/d, WC 50%

Oct '96 Plug 914 m. Squeeze 2, layer 2 (816 - 817.5 m) & 1


Katub isap
194.55 m

U.R 2-7/8" tubing @


Lap 1 : 807 - 810.5 m 205 m

Lap 1 : 813 814.5 m

Lap 2: 816 - 817.5 m

Lap 2 : 820 - 824 m

Lap 2: 830 - 832 m

Lap 2: 834 - 837 m

Lap 5:903.5 - 906.5 m

Plug 914 m
Well Status
Plug 920 m Status Last prod. Test Gross Oil WC DFL (m) Date
Pumping 7-Jun-07 145 blpd 3.1 bopd 98% 388.28 19-Jun-07
Lap 10 925.5 - 927 m

Lap 10: 930.5 - 933 m

Plug 945 m
Lap 8: 954 - 956 m
7" prod. casing @
989 m
TD @ 1000 m