VEHICULAR RAMP (1:8)

OUT

VEHICULAR RAMP (1:8)


(3500mm WIDE)
IN

SS JALI (450MM WIDE, 50MM THICK)


30000MM

RCC WALL (150MM THICK)


CLEAR HEIGHT

5000 20000 5000

30000
450 450
40000MM
150

KEY PLAN
(BASEMENT) TRANSITION SLOPE
3500
(1:16) VEHICULAR RAMP (1:8)
X

PATH DIVIDER (300MM WIDE) 300 7600

TRANSITION SLOPE TRANSITION SLOPE


3500 VEHICULAR RAMP (1:8)
(1:16) (1:16)

150
RCC WALL (150MM THICK)

PLAN

GROUND FLOOR SLAB FLOORING (10MM THICK)


12000
150
RCC SLAB (150MM THICK)

CLEAR HEIGHT PCC FILLING


3000 ROAD LEVEL
DETAIL A
90 250 100

TRANSITION RAMP ( 1"16 ) 450


8)
MP (SLOPE 1:
VEHICULAR RA 450

2500
DETAIL B SS JALI (50MM THICK) 1600 STORE ROOM RCC COLUMN
100
450
250 100
EARTH FILLING
RAMP ( 1"16 ) EARTH FILLING 4700
RAFT FOUNDATION TRANSITION
M25 CONCRETE 1:1½":2

DRAINAGE PIPE (100MM DIA)


10MM THICK WATERPROOFING
100MM THICK P.C.C
PCC COVER (100MM THICK)
SECTION XX'

EARTH FILLING
10MM THICK MS JAALI 10MM THICK MS JAALI
TRANSITION SLOPE 1:16 TRANSITION SLOPE 1:16
WITH P.C.C FILLING 450 300 450MM WIDE
DRAIN CHANNEL JAALI P.C.C FILLING

10MM THICK WATERPROOFING M25 GRADE R.C.C

100 150
10MM THICK WATERPROOFING
300

100
M25 GRADE R.C.C 100 300 450
100MM DIA PIPE
100

DRAIN CHANNEL

TOE BEAM AT BASE


100MM DIA PIPE DOWN BEAM AT BASE REINFORCEMENT

DRAIN CHANNEL REINFORCEMENT BAR


TRANSITIONAL SLOPE 1:16
DETAIL AT A DETAIL AT B
SCALE 1:5 SCALE 1:20

SUBMITTED BY :
BUILDING STUDIO INCHARGE :
REMARKS : SCALE :
NAME: SALONI KARAK SHEET NO. :
CONSTRUCTION-V TOPIC : RAMP AND DETAILS Ar. PREETI NAIR
1 : 100
YEAR : 3RD YEAR/A
AP-303 DATE : ROLL NO:-03618001620 1
DELHI TECHNICAL CAMPUS