Incombustible material, including ii) any material


where appropriate the remains of
burning, shall be disposed of in a - consisting of highly
safe and tidy manner at solid organic clay and silt;
waste dumps outside the Site,
unless otherwise approved or - which is clay having a
directed by the S.O. The liquid limit exceeding
Contractor shall be solely 80% and/or a plasticity
responsible for making the index exceeding 55%;
necessary agreements, and paying
expenses and claims arising from - which is susceptible to
the use of such solid waste spontaneous combustion;
dumps whether on Government
or private land. - which has a loss of weight
greater than 2.5% on
ignition;
2.2 EARTHWORKS
- containing large amounts
2.2.1 Definitions of roots, grass and other
vegetable matter.
(a) Formation Level
Materials that are soft or unstable
Formation level means the top merely because they are too wet
surface of the subgrade. or too dry for effective
compaction are not to be
(b) Subgrade classified as unsuitable, unless
otherwise classified by the S.O.
Subgrade means that part of the
embankment or existing ground (e) Suitable Materials
in cutting which is immediately
below the subbase or lower Suitable materials shall mean
subbase of the road pavement those materials other than the
and shoulders. unsuitable materials defined in
Sub-Section 2.2.1 (d) above.
(c) Common Excavation
(f) Rock
Common excavation shall mean
excavation in any materials Rock shall mean material found
which are not rock or artificial in ledges or masses in its original
hard materials as defined in position which would normally
Sub-Sections 2.2.1 (f) and (g). have to be loosened either by
blasting or by pneumatic tools or,
(d) Unsuitable Materials if excavated by hand, by wedges
and sledge hammers. It shall not
Unsuitable materials shall include material which can be
include :- loosened with a track-type tractor
with mounted and drawn ripper
i) running silt, peat, logs, of the following descriptions :-
stumps, perishable or toxic
material, slurry or mud, or

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 38


FOR INTERNAL USE ONLY Standard Specification For Road Works

i) Tractor Unit : Equipment with a The Contractor shall provide where


minimum weight of 20 tonnes necessary temporary water courses,
and nett horse power rating of ditches, drains, pumping or other means of
200 brake horse power or more. maintaining the earthworks free from
The tractor unit is to be in good water. Such provision shall include
condition and operated by carrying out the work of forming the
experienced personnel skilled in cuttings and embankments in such a
the use of ripping equipment; manner that their surfaces have at all times
a sufficient gradient to enable them to shed
ii) Ripping Unit : The ripper to be water and prevent ponding.
attached to the tractor shall be the
most efficient parallelogram type In pumping out excavations and in the
recommended by the tractor or lowering of water tables the Contractor
ripper manufacturer. The ripper shall pay due regard to the stability of all
shall have a single shank in good structures.
working condition with
sharpened cutting point. Adequate means for trapping silt shall be
provided on all temporary drainage
Boulders or detached pieces shall only be systems. Similar arrangements shall be
regarded as rock if they individually made for all earthworks including
exceed 0.5 cubic metre. excavations whether for pile trenches,
foundations or cuttings.
(g) Artificial Hard Material
Should the surface of completed areas be
This shall mean any hard artificial damaged by erosion or by any other cause
material which would require the use the Contractor shall at his own cost make
of blasting or approved pneumatic good such areas to the satisfaction of the
tools for its removal but shall S.O.
exclude individual masses less than
0.5 cubic metre. The Contractor shall exercise care in
preventing wastage of suitable material
2.2.2 General Requirements needed for embankment or fill
construction.
The work shall include the
excavation of all types of material, 2.2.3 Roadway Excavation
backfilling, compaction, forming
embankments and slopes, etc., as is 2.2.3.1 Dimensional Tolerances
necessary for the completion of the
Works up to the formation levels, in Slopes in cutting shall be
accordance with the lines, grades, trimmed mechanically to neat
dimensions, shapes and typical and even surfaces which shall
cross- sections shown on the have gradients not steeper than
Drawings and to the approval of the that shown on the Drawings.
S.O. Widths of excavations shall not
exceed the dimensions shown on
the Drawings by more than 300
mm, unless otherwise approved
by the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 39


FOR INTERNAL USE ONLY Standard Specification For Road Works

2.2.3.2 Separation and Stockpiling of 2.2.3.4 Removal of Unsuitable Material


Suitable Material
Unsuitable material shall be
Where excavation reveals a excavated to such depth and over
combination of suitable and such area as directed by the S.O.
unsuitable materials, the and be transported and disposed
Contractor shall, wherever the of in an approved manner. Unless
S.O. considers it practicable, approval of the S.O. to dump and
carry out the excavation in such a spread the unsuitable materials
manner that the suitable materials within the Site is obtained, the
are excavated separately for use Contractor shall be responsible
in the Works without for providing his own dump site
contamination by the unsuitable for such unsuitable materials.
materials. The Contractor shall The Contractor shall comply with
stockpile separately material for statutory requirements such as
subgrade as specified in Sub- payment of royalties,
Section 2.2.7. environmental protection, etc.
Voids created due to removal of
2.2.3.3 Removal of Excavated Material unsuitable material shall be
From Site backfilled with suitable material
compacted to a dry density not
No excavated material shall be less than that of the surrounding
removed from the Site except on material or that specified for the
the direction or with the approval respective part of the earthworks
of the S.O. Should the or as directed by the S.O.
Contractor be permitted to
remove suitable materials from 2.2.3.5 Replacement of Unsuitable
the Site to suit his operational Material Under Standing Water
procedure, then he shall make
good any consequent deficit of Where it is decided by the S.O.
fill material arising there from, at that replacement of unsuitable
his own expense. Unless material shall be done under
designated dump sites have been standing water, voids created due
shown on the Drawings, the to removal of unsuitable material
Contractor shall dispose of shall be backfilled with hard
surplus suitable material at his clean crushed rock, natural gravel
own dump areas outside the Site or sand having grading within the
as approved by the S.O. In doing respective limits specified in
so, the Contractor shall comply Table 2.1.
with statutory requirements such
as payment of royalties, environ 2.2.3.6 Widening Cuts
mental protection, etc.
The S.O. may instruct the
Contractor or the Contractor
himself may elect to obtain
material for the Works by
widening cuts. In the latter case,
the Contractor shall first request
permission in writing from the
S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 40


FOR INTERNAL USE ONLY Standard Specification For Road Works

TABLE 2.1 - GRADING LIMITS OF Where the rock is of satisfactory


MATERIALS FOR quality, the Contractor may elect to
REPLACEMENT OF crush and screen it to produce
UNSUITABLE MATERIAL aggregates required for concrete,
roadbase, subbase, or other purposes.
Excavated rock needed for earth
B.S. Sieve Size % Passing By work construction which the
Weight Contractor elects so to use for
producing select materials shall be
Crushed Rock or
replaced at the Contractor's own
Gravel expense by borrow of satisfactory
100 quality approved by the S.O.
63.0 mm 85 - 100
37.5 mm 0 - 20 Otherwise, excavated rock shall be
20.0 mm 0-5
used in the construction of
10.0 mm
embankment and fill, to the fullest
Sand practical extent, in either of the two
following ways :-
10.0 mm 100
5.0 mm 90 - 100
1.18 mm 45 - 80
300 um 10 - 30 i) excavated rock shall be broken
150 um 2 - 10 down to a maximum particle size
of 400 mm and used as rock fill
as described in Sub-Section 2.2.5;
2.2.3.7 Excavation of Rock ii) excavated rock shall be broken
down to a maximum particle size
Rock excavation shall be carried of 150 mm, blended with suitable
out by methods appropriate to earth fill material in a proportion
Site requirements as approved by not exceeding 1 rock to 1 earth,
the S.O. Where explosives shall and used as common fill.
be used, the relevant security
regulations dealing with The Contractor may only waste
purchase, transport, handling, excavated rock with the approval of the
storage and usage of explosives S.O. Excavated rock needed for
shall be complied with. earthwork construction which the
Contractor elects to waste shall be
All material from rock replaced at the Contractor's own expense
excavations shall be used as far by borrow of satisfactory quality
as is practicable in the Works. approved by the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 41


FOR INTERNAL USE ONLY Standard Specification For Road Works

2.2.3.8 Storage and Handling of All necessary precautions shall be


Explosives taken to preserve in the soundest
possible condition the materials
Proper buildings or below and beyond the lines of all
magazines, with separate excavations. Delayed blasting to
compartments for detonators, reduce shock waves shall be used
in suitable positions for the to avoid damage to concrete and
storage of explosives in other works already completed.
manner and quantities to be As the excavation approaches its
approved shall be provided. final lines, blasting shall be
The prevention of any carried out by means of parallel
unauthorised issue or drill holes perpendicular to the
improper use of any explosive toe of the excavation and parallel
brought on the Works shall be to the finally required face.
the responsibility of the
Contractor and only 2.2.3.10 Safety Measures
experienced and responsible
men shall be employed to When blasting is carried out close
handle explosives for the to properties or roads, appropriate
purpose of the Works. safety rules shall be strictly
adhered to. Where necessary or
2.2.3.9 Blasting as directed by the S.O., the use of
heavy mesh blasting mats shall
Explosives shall be used in be used to ensure that no damage
the quantities and manner is caused to persons or property
recommended by the on or off Site. Special care shall
manufacturers. Blasting shall be taken in wet ground to ensure
be restricted to such periods that individual explosions are
as the S.O. may prescribe. If, reduced to such size as to
in the opinion of the S.O., preclude damage to any buildings
blasting would be dangerous or structures. Plaster shooting
to persons or property or to will not be permitted within 400
any finished work, or is being metres of any building or
carried on in a reckless structure. If traffic on any road
manner, he may prohibit it, or railway has to be interrupted
and order the rock to be for blasting operations, the
excavated by other means. Contractor shall obtain approval
The use of explosives in large of his schedule for such
blasts, i.e. exceeding 9 kg of interruption from the appropriate
explosive, as in seams, drifts, authorities and shall prove to the
shafts, pits, or large holes, is S.O. that he has obtained it, prior
prohibited unless authorised to the interruption.
in writing by the S.O. Such
authorisation shall not in any
way relieve the Contractor of
his liabilities under the
Conditions of Contract.