You are on page 1of 417
CAWANGAN PEMBINAAN DAN PEMANTAUAN SEKTOR PROJEK LEBUHRAYA PAN BORNEO Pejabat Tapak JKR (abss Kone 04 (WPO04) Telefon 088-910 787 g. Lanas Kimanis Laman Web SRNR man Web: www.jkr.sabah.gov.my Sabah, Malaysia Your Ref. Our Ref. : JKR.PPR.600-31/1/60/COR/JLD.5/55 Date 224 April 2021 KETUA PENOLONG PENGARAH Cawangan Kontrak dan Ukur Bahan, Sektor Projek Lebuhraya Pan Borneo, Jalan JKR Putatan, 89500 Kota Kinabalu, SABAH (Attn.: Mr. Yusri Nordin) Dear Sir, Contract No.: KKR/BPP/24/2019 PERLAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH - WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR - Extension of Time (EOT) No.2 Above mentioned subject, letter from WPC letter ref. no: PKM/PB/JKR85- 28/1/1/1.2(529)Vol.6 dated 28.01.2021, letter ref. no: PKM/PB/JKR85- 28/1/1/1.2(582) Vol. 5 dated 27 February 2021 and Site Memorandum from Consultant ref. no. WP04/RE/MEMO/373 dated 5" March 2021 are referred. Attached herewith nine (9) copies of EOT Certificate and the supporting documents for your kind perusal. Thank you Saya yang menjalankan amanah, Assistanf Director Superitending Officer Representative (SOR. Work Package 04 (WP04) sM “SABAH MAJU JAYA” ce: 2 Our Ref. JKR.PPR.600-31/1/60/COR/JLD.5/55 Date 224 April 2021 KETUA PENOLONG PENGARAH ‘Cawangan Pembinaan dan Pemantauan ‘Sektor Proek Lebuhraya Pan Borneo (wre attachment) EXCEL CONSULT SDN. BHD. ‘Shop Lot No. 15, Block H, Ground & 1 Floor, Ruang Ridgeview 2, Phase 10A, Sri Kepayan Commercial Centre, (88200 KOTA KINABALU SABAH (Attn. : Residen Engineer WPO4— I lan Wong — wo attachment) PROKOSMAN KONSULTANT (Alin: Mr: Andersen Wong ~ wo attactrment) PEMBINAAN KEKAL MEWAH Sute 1.01-1.04, 1 Foor, Lot 9810, ‘Sedeo industrial Estate, Kolombong, (Of Jalan Litas, {88450 Kota Kinabalu, Sabah (Attn: Me. Tang Yiew Kok - wo attachment) “SABAH MAJU JAYA” IKR.Q5394 GOVERNMENTOF SABAH JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.S/55___ CERTIFICATE OF DELAY AND EXTENSION OF TIME NO: 2 (TWé To: Sedco Industrial Estate, Kolombong, Off Jalan Lintas 88450 Kota Kinabalu, Sabah (Contractor) CONTRACT NO. _KKR/BPP/24/2019 CONTRACT FORTHE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- _WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR Thereby certify that the progress and completion of the Works/Seetien-ef the Werks* as mentioned likely to be/has-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-of Contract er-beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time i.” S.675 instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub-contractor, 257 days 2. _ of the Conditions of Contract, Thereby grant you an extension of time of 236 days ___ for completion of the Works/Seetion-of the Werks* under this Contract 3. The Date for Completion which was the __ is now the 19.05.2023 * Delete whichever not applicable # Explanatory notes to be given overleaf Notes for Departmental Records 1. Guarantees/Policies Reference Expiry Date (Performance Bond ___GBINM003370 03/07/2026 (ii) Contractor's All Risks __DECRKK0506471800 i) Workmen’s Compensation __DLWCKK0608641800 (iv) SOCSO 96000079108 2. Percentage of Completion of the Works : 40.05% as of 25" March 2021 3. Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended 4) S.O.’s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 — 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 — 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 — 1/2/2021) Compulsory Attachments 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref PKM/PBUKRB5-28/1/1/1.2(529)Vol5. dated 28.01.2021 4. Application of EOT No. 2 from contractor ref PKM/PBUKR85-28/1/1/1.2(582)Vol.5. dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WPO4/RE/MEMO/373 dated 5" March 2021 Certificate prepared by: Penolong Pengarah S.O/P.D.’s Representative Certified checked by: sovesac (YUSRI NORDIN) Ketua Penolong Pengarah ‘Cawangan Kontrak dan Ukur Bahan Distributions: (9 copies) Original to: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) soR* PK, 3318(1)-95 KR. QS 394 GOVERNMENTOF __ SABAH JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.5/55 CERTIFICATE OF DELAY AND EXTENSION OF TIME NO: 2 (TWO) To: BED Sedco Industrial Fstate, Kolombong, Off Jalan Lintas 88450 Kota Kinabalu, Sabah (Contractor) Date: 224 APRIL 2021 CONTRACT NO. KKR/BPP/24/2019 CONTRACT FOR THE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- ‘WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR T hereby certify that the progress and completion of the Works/Seetion-ef the Werks* as mentioned above is likely to be/has-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-of Contract or beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time i. $.0.’s instructions issued under clause 5 hereof, 43.1(e) 257 days PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub-contractor, nominated or otherwise Si days 20 days = _MCO2 (12 January 2021 — 31/1/2021) 2. In accordance with Clause 38.4 an an extension of time of 236 days under this Contract (a,b) _ of the Conditions of Contract, I hereby grant you __ for completion of the Works/Seetion-of the Works* is now the 19.08.2023 3. The Date for Completion which was the * Delete whichever not applicable 4# Explanatory notes to be given overlear Notes for Departmental Records 1 Guarantees/Policies Reference Expiry Date () Performance Bond ____GBINM003370_ 03/07/2026 _ Gi) Contractor’s All Risks ___ DECRKK0506471800 __1mnone24 (iii) Workmen’s Compensation DLWCKK0608641800 __17horno24 (iv) SOCSO ________F9600007910B, 2. Percentage of Completion of the Works : 40.05% as of 25" March 2021 Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not sued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020 - 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 — 31/1/2021) a Therefore, total net effective delays recommended = 236 days (10/6/2021 ~ 1/2/2021) Compulsory Atachmer 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref PKM/PBUKR85-28/1/1/1.2(529)Vol.5. dated 28.01.2021 4. Application of EOT No. 2 from contractor ref PKM/PBJIKR85-28/1/1/1.2(582)Vol5 dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WP04/RE/MEMOV373 dated 5! March 2021 Certificate prepared by: Penolong Pengarah S.OJP.D.’s Representative Certified checked by: 2 (YUSRI NORDIN) Ketua Penolong Pengarah Cawangan Kontrak dan Ukur Bahan Distributions: (9 copies) Original: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) soR* PK. 3318 (L)-95, IKR. QS 394 GOVERNMENT OF SABAH __ JABATAN KERJA RAYA, SABAH REF.NO. —_JKR.PPR.600-31/1/60/COR/JLD.5/55 CERTIFICATE OF DELAY AND EXTENSION OF TIMENO: 2(TWO) __ To: Date: CONTRACT NO. _KKR/BPP/24/2019 _ CONTRACT FOR THE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR Thereby certify that the progress and completion of the Works/Seetion-of the Werkst as mentioned above is likely to be/hes-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-of Contract ef beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time 257 days i, $.0.'s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this, Contract by the Contractor or any sub-contractor, nominated or otherwise 2. Inaccordance with Clause a4: __ of the Conditions of Contract, I hereby grant you an extension of time of 236 days___ for completion of the Works/Seetion-of the Works* under this Contract, 3. The Date for Completion which was the __isnowthe 19.05.2023 * Delete whichever not applicable 4# Explanatory notes to be given overleaf Notes for Departmental Records Guarantees/Policies Reference Expiry Date (Performance Bond ___GBINM003370_ (ii) Contractor's All Risks _____DECRKK0506471800____—_1 7/10/2024 iii) Workmen’s Compensation DLWCKK0608641800 (iv), SOCSO Percentage of Completion of the Works : 40.05% as of 25" March 2021 Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended @ S.0.’s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 - 22/2/2021) b) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia ‘#Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020 — 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 — 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 ~ 1/2/2021) Compulsory Attachments 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref PKM/PBUKR85-28/1/1/1.2(529)Vol.5. dated 28.01.2021 4. Application of EOT No. 2 from contractor ref. PKM/PBUKR85-28/1/1/1,2(582)Vol.5. dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WP0d/RE/MEMOV/373 dated 5* March 2021 Certificate prepared by: Certified checked by: Distributi Original Copy to: PK 3318, S.0./P.D.’s Representative (YUSRI NORDIN) Ketua Penolong Pengarah Cawangan Kontrak dan Ukur Bahan ions: (9 copies) to; Main Contractor Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance ‘Accountant General D.P.W. KPP/KUB (2 copies) soR/** 1-95 03/07/2026 JKR. Q8394 GOVERNMENT OF ____ SABAH. JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.5/55 CERTIFICATE OF DELAY AND EXTENSION OF TIMENO: 2(TWO) To: Sedeo Industrial Estate, Kolombong, Off Jalan Lintas ‘88450 Kota Kinabalu, Sabah (Contractor) Date: 22" APRIL CONTRACT NO. _KKR/BPP/24/2019 - CONTRACT FORTHE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR T hereby certify that the progress and completion of the Works/Section-of the Werks* as mentioned above is likely to belhas-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-of Contract oF beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time .0.°S instructions issued under clause 5 hereof, BIO 357 days PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this, Contract by the Contractor or any sub-contractor, nominated or otherwise under this Contract 3. The Date for Completion which was the 22____isnowthe __19.05.2023 * Delete whichever not applicable 4 Explanatory notes to be given overleaf Notes for Departmental Records 1, Guarantees/Policies Reference (@ Performance Bond ___GBINM003370_ 03/07/2026 (ii) Contractor's All Risks ____DECRKK0506471800_ ___17n0/2024 i) Workmen’s Compensation DLWCKK0608641800_ 17/0/2024 (iv) socso 96000079 10B 2 Percentage of Completion of the Works : 40.05% as of 25" March 2021 3. Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended 4) 8.0.'s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 — 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia +#Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 — 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 — 1/2/2021) Compulsory Attachments 1. Original Works Programme 2. Approved Revised Works Progranme No.1 3. Application of EOT No. 2 from contractor ref PKM/PBIJKRS5-28/1/1/1.2(529)Vol.5. dated 28.01.2021 4. Application of EOT No. 2 from contractor ref PKM/PBUKR85-28/1/1/1.2(582)Vol.5. dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WPO4/RE/MEMO/373 date Certificate prepared by: Penofong Pengarah S.O.JP.D.’s Representative Certified checked by: (YUSRI NORDIN) Ketua Penolong Pengarah Cawangan Kontrak dan Ukur Bahan Distributions: (9 copies) Original to: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) sOR/* PK, 3318(1)-95, IKR. QS394 GOVERNMENT OF JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.5/S5 CERTIFICATE OF DELAY AND EXTENSION OF TIME NO: 2 (TWO) To: 88450 Kota Kinabalu, Sabah Date: __ 22" APRIL 2021 CONTRACT NO. KKR/BPP/24/2019 CONTRACT FOR THE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR _ I hereby certify that the progress and completion of the Works/Seetion-of the Werks* as mentioned above is likely to be/hes-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-ef Contract er beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time j. 5.0.’s instructions issued under clai reok, B.A) 237 days PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub-contractor, nominated or otherwise a Exceptionally inclement weather “Delay due to force majeure ___=_MCO 2 (12 January 2021 — 31/1/2021) 2. In accordance with Clause 38.4 and 4: an extension of time of _~ of the Conditions of Contract, Thereby grant you _ for completion of the Works/Seetion-of the Werks* under this Contract 3. The Date for Completion which was the __ isnow the 19.05.2023 (RAH KERJA RAYA + Delete whichever not applicable 4 Explanatory noes tobe given overeat Notes for Departmental Records 1. Guarantees/Policies Reference Expiry Date (i) Performance Bond _______GBINM003370_ 03/07/2026 ii) Contractor's All Risks DECRKK0506471800_ = _17/10/2024. (iii) Workmen’s Compensation _ DLWCKK0608641800_ 17/10/2024 | (iv) Socso ___F9600007910B. 2, Percentage of Completion of the Works : 40.05% as of 25 March 2021 3. Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended 4) S.0’s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwi Period of delay (10 June 2020 - 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020- 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, ete. Period of delay (12 January 2021 ~ 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 - 1/2/2021) Compulsory Attachments: 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref, PKM/PBUKR85-28/1/1/1.2(529)VoLS dated 28.01.2021 4. Application of EOT No. 2 from contractor ref PKM/PBUIKR85-28/1/1/1,2(582)Vol.5 dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WP04/RE/MEMO/373 dated.5" March 2021 Certificate prepared by: S.OJP.D.’s Representative Certified checked by: sesso (YUSRI NORDIN) Ketua Penolong Pengarah Cawangan Kontrak dan Ukur Bahan Distributions: (9 copies) Original to: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance ‘Accountant General D.P.W. KPP/KUB @ copies) sori** PK. 3318 (L)-95 KR, QS.394 GOVERNMENT OF SABAH JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.5/55 CERTIFICATE OF DELAY AND EXTENSION OF TIME NO: 2 (TWO) To: 22" APRIL 2021 CONTRACT NO. _KKR/BPP/24/2019 CONTRACT FORTHE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR 1 hereby certify that the progress and completion of the Works/Seetion-of-the-Works* as mentioned above is likely to be/hes-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-of- Contract er beyond the extended Date for Completion previously approved due to the following reasons : ‘Reason/Reasons # Clause Period of Delay and Extension of Time i. $.0.’s instructions issued under clause Shereof, ——43.1(@ PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this, Contract by the Contractor or any sub-contractor, nominated or otherwise ‘inclement 43.100) 51 days. Delay due to force majeure B1@) _ 20 days a = _MCO 2 (12 January 2021 —31/1/2021) __ 2. In accordance with Clause (a,b) _~ of the Conditions of Contract, I hereby grant you an extension of time of 236 days for completion of the Works/Section-of the Works" under this Contract 3. The Date for Completion which was the 022 isnowthe * Delete whichever not applicable ‘4 Explanatory notes to be given overlea Notes for Departmental Records 1 Guarantees/Policies Reference (i) Performance Bond GBINM003370__ 03/07/2026 (ii) Contractor’s All Risks DECRKK0S06471800_ = __=AT/N0/2024 (iii) Workmen’s Compensation __ DLWCKK0608641800_ 171072024 (iv) SOCSO ___F9600007910B 2. Percentage of Completion of the Works : 40.05% ay of 25% March 2021 Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended @ S.0”s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 ~ 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020— 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1" MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 ~ 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 — 1/2/2021) Compulsory Attachments: 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref. PKM/PBIIKR85-28/1/1/1.2(529)Vol.5. dated 28.01.2021 4 5 Application of EOT No. 2 from contractor ref. PKM/PBUKR8S-28/1/1/1.2(582)Vol.5 dated 27.02.2021 Comment by Excel Consult via Site Memorandum ref. no.: WP04/RE/MEMO/373 dated 5% March 2021 Certificate prepared by: Penolong Pengarah S.0./P.D.’s Representative Certified checked by: sn See (YUSRI NORDIN) Ketua Penolong Pengarah Cawangan Kontrak dan Ukur Bahan ibutions: (9 copies) Original to: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) SOR PK. 3318 (L)-95 JER. 98394 GOVERNMENTOF SABAH JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/ILD.5/55 CERTIFICATE OF DELAY AND EXTENSION OF TIME NO To: 2 (TWO) _ PEMBINAAN KEKAL MEWAH SDN BHD 88450 Kota Kinabalu, Sabah (Contractor) Date: APRIL 2021 CONTRACT NO. _KKR/BPP/24/2019 CONTRACT FORTHE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR | hereby certify that the progress and completion of the Works/Seetion-of the Werks* as mentioned above is likely to be/hes-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-oF Contract er beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time i. S.0.°s instructions issued under cla , ~257days SS PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this, Contract by the Contractor or any sub-contractor, 43.10) ‘Si days _ im ai i _ 4B. @)_ "20 days = MCO2(12 J 2. Inaccordance with Clause an extension of time of under this Contract __ of the Conditions of Contract, Thereby grant you __ for completion of the Works/Seetion-of the Works* 3. The Date for Completion which was the __ 25.09.2022 isnowthe ___ 19.05.2023 PENGARAH KERJA RAYA * Delete whichever not applicable 4 Explanatory notes to be given overleat Notes for Departmental Records Guarantees/Policies Reference Expiry Date (i) Performance Bond ____GBINM003370. 03/07/2026 Gi) Contractor's All Risks DECRKK0506471800 __In072024 ii) Workmen’s Compensation DLWCKK0608641: 17/10/2024 (iv). Socso __F9600007910B Percentage of Completion of the Works : 40.05% as of 25 March 2021 Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended 4) S.0.s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 — 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020— 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 - 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 ~ 1/2/2021) Compulsory Attachments: 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref. PKM/PB/IKR85-28/1/1/1.2(529)Vol.5 dated 28.01.2021 4. Application of EOT No. 2 from contractor ref PKM/PBlIKR85-28/1/1/1.2(582)Vol.S dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WP04/RE/MEMO/373 dated 5 March 2021 Certificate prepared by: Certified checked by: Penolong Pengarah S.0./P.D.’s Representative (YUSRI NORDIN) Ketua Penolong Pengarah Cawangan Kontrak dan Ukur Bahan Distributions: (9 copies) Original Copy to: to: Main Contractor Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) SOR PK 3218 ()-95 IKR.Q8394 GOVERNMENTOF ___ SABAH. JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.S/55 CERTIFICATE OF DELAY AND EXTENSION OF TIME NO 2 (TWO) __ To: PEMBINAAN KEKAL MEWAH SDN BHD Lot Sedco Industrial Estate, Kolombong, Off Jalan Lintas 88450 Kota Kinabalu, Sabah (Contractor) CONTRACT NO. CONTRACT FOR THE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- _WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR T hereby certify that the progress and completion of the Works/Seetion-of the Werks* as mentioned above is likely to be/has-been* delayed beyond the Date for Completion stated in the Appendix to the ‘Conditions-of Contrast er beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time §.07% instructions issued under clause 5 hereof, BAIS 257 days PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub-contractor, nominated or otherwise Es ally inclement weather BiG) Sidays BCE ad oe 2 days MCO2 (12 January 2021 2. In accordance with Clause _ 38.4 of the Conditions of Contract, [hereby grant you an extension of time of ____ 236 day for completion of the Works/Seetion-of the Werks* under this Contract 3. The Date for Completion which was the __25.09,2022 is now the 19.05.2023 PENGARAH KERJA RAYA. a * Delete whichever not applicable ‘Explanatory notes obe given overeat Notes for Departmental Records 1 Guarantees/Policies (Performance Bond (i) Contractor's All Risks Workmen’s Compensation (iv) SOcsO F9600007910B 2. Percentage of Completion of the Works : 40.05% as of 25" March 2021 Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended 4) S.0.’s instructions issued under clause 5 hereof, PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 — 22/2/2021) 4) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020 — 1/2/2021) ©) Delay due to force majeure. This include the impacts and effects after the 1” MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 — 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 — 1/2/2021) »mpulsory Attachments 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref PKM/PB/JKR85-28/1/1/1.2(529)Vol.5 dated 28.01.2021 4. Application of EOT No. 2 from contractor ref. PKM/PBIIKR85-28/1/1/1.2(582)Vol5 dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WP04/RE/MEMO/373 dated 5" March 2021 Certificate prepared by: + (HALIZARISUAN) Penolong Pengarah S.O,P.D.’s Representative Certified checked bys aaa (YUSRI NORDIN) Ketua Penolong Pengarah ‘Cawangan Kontrak dan Ukur Bahan Distributions: (9 copies) Original to: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) sOR/** PK. 3318(L)-95 JKR. QS 394 GOVERNMENT OF __ SABAH __ JABATAN KERJA RAYA, SABAH REF.NO. _JKR.PPR.600-31/1/60/COR/JLD.5/55__ CERTIFICATE OF DELAY AND EXTENSION OF TIME NO 2 (TWO) To: _PEMBINAAN KEKAL MEWAH SDN BHD 88450 Kota Kinabalu, Sabah (Contractor) CONTRACT NO. _KKR/BPP/24/2019 CONTRACT FORTHE PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH- WP04: MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR I hereby certify that the progress and completion of the Works/Seetion-ef the Werks* as mentioned above is likely to be/hes-been* delayed beyond the Date for Completion stated in the Appendix to the Conditions-of Contract or beyond the extended Date for Completion previously approved due to the following reasons : Reason/Reasons # Clause Period of Delay and Extension of Time (07s instructions issued under clause 5 PROVIDED THAT such instructions are not issued due to any act, negligence, default or breach of this, Contract by the Contractor or any sub-contractor, nominated or otherwise Exceptionally inclement iii, Delay due to force maj 43.1) i 257 days = _MCO2.(12 January 2021 — 31/1/2021) 2. Inaceordance with Clause 38.4 and 43.1 an extension of time of 236 day under this Contract __ of the Conditions of Contract, I hereby grant you _ __ for completion of the Works/Seetien-ofthe Works* 3. The Date for Completion which was the __25.09,2022__isnowthe __19.05.2023 PENGARAH KERJA RAYA * Delete whichever not applicable # Explanatory notes to be given overleaf Notes for Departmental Records 1. Guarantees/Policies Reference Expiry Date (Performance Bond _GBINM003370 03/07/2026 (ii) Contractor’s All Risks _______ DECRKK0506471800 ___ 17072024 Workmen's Compensation _ DLWCKK06 300 _ 70024 (iv) Socso 96000079108 2. Percentage of Completion of the Works : 40.05% as of 25 March 2021 3. Explanatory Notes for Reason/Reasons of Delay and Extension of Time Recommended @ 8.0.'s instructions issued under clause $ hereof, PROVIDED THAT such instructions are not ssued due to any act, negligence, default or breach of this Contract by the Contractor or any sub- contractor, nominated or otherwise Period of delay (10 June 2020 — 22/2/2021) 8) Exceptionally inclement weather. Asper recorded data by Jabatan Meterologi Malaysia #Bongawan Station, it confirmed that the total raining days between month June 2020 — December 2020 is about 150 raining days and the average of raining days from Year 2012- Year 2019 is 99 days. So the 51 days delay is due to exceptionally inclement weather at Year 2020. Period of delay (10 June 2020 — 1/2/2021) ©) Delay due to force majeure. ude the impacts and effects after the 1* MCO as Work Package Contractor is required to comply strictly with the Standards Operating Procedure (SOP) set by respective local autgorities as well as time lost due to limited working time and resources, covid-19 test, quarantine, reorganizing to mobilize, etc. Period of delay (12 January 2021 - 31/1/2021) Therefore, total net effective delays recommended = 236 days (10/6/2021 — 1/2/2021) Compulsory Auachments: 1. Original Works Programme 2. Approved Revised Works Programme No.1 3. Application of EOT No. 2 from contractor ref PKM/PB/JKRSS-28/1/1/1.2(529)Vol.S. dated 28.01.2021 4. Application of EOT No. 2 from contractor ref PKM/PB/JKR8S-28/1/1/1.2(582)Vol.5. dated 27.02.2021 5. Comment by Excel Consult via Site Memorandum ref. no.: WP04/RE/MEMO/373 dated 5* March 2021 Certificate prepared by: Penoldng Pengarah S.O.P.D.’s Representative Certified checked by: (YUSRI NORDIN) Ketua Penolong Pengarah CCawangan Kontrak dan Ukur Bahan Original: Main Contractor Copy to: Chief Accountant Director of Audit Permanent Secretary, Ministry of Finance Accountant General D.P.W. KPP/KUB (2 copies) SOR* PK 3318 (L)-95 Excel Consult SITE MEMORANDUM CConeuling Engineers. neuters Penning Our Ref. WP04/RE/MEMO/373 Date 5" March 2021 To PENOLONG PENGARAH, SOR WPO4, CAWANGAN PEMBINAAN DAN PEMANTAUAN SEKTOR PAN BORNEO, Pejabat Tapak JKR Pakej Kerja 04, Kimanis Papar, Sabah. Attention Pn, Haliza Rijuan Project PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR (WPO4) Subject Additional Information and Documents for the Application of Extension of Time No. 2(EoT2) Dear Madam, Reference is made to PEMBINAAN KEKAL MEWAH SDN BHD’s letter ref. PKM/ PB/JKR 85-28/1/1/1.2. (582) Vol. 5 dated 27" February 2021 pertaining to the above subject matter. We have reviewed the said application of EoT2 submitted by the Work Package Contractor and would like to suggest 236 days are to be granted as per the findings shown in Attachment A. Thank you. Yours faithfully, ee Ir. lan Wong Chung Yen RESIDENT ENGINEER (WPO4) cc. SEKTOR PAN BORNEO, JURUTERA PROJEK WPO4 Attn Ta, Suhaibun Matusin cc, EXCEL CONSULT, LC Attn.: Ir. lan Ma/Ir. Jonathan Wong ce. PERUNDING PUNCAK ANUGERAH SDN BHD, DEDC Attn Liau Fung Kiong cc. PEMBINAAN KEKAL MEWAH SDN BHD Attn. Mr. Kok Nye Liang/Mr. Tang View Kok cc. PROKOSMAN KONSULTANT, CaS ‘tn. Sr Peter Chang/Mir. Anderson Wong Lot 6, Block C1 Floor (C-1-6), Lorong Pusat Komersi 8/2, ‘88 Marketplace, Phase 104, 88200 Kota Kinabalu, Sabah, Malaysia TEL: (46) 088-204020 FAX: (+6) 089-210802 Email: pnborneo@excelconsultcom.my Attachment A Projek Lebuhraya Pan Borneo Sal Analisa P 12 Untuk Pake| Ker ‘may20 | _Jun-20 quia [| Avg20 [| Sep-20[ Oet20 | Nov20 | bec) Jena | reba TeNFOH aR Norma | SEBENAR Bi| KRONOLOGI PERMOHONAN: KEMUKAAN, KONTRAK | M/BLS- 7 v4 a1 si 7 14 21 30] 7 16 20 aif 7 v4 a an] 7 a4 at 30] 7 14 20 31) 7 14 20 30] 7 14 21 17 14 21 anf 7 14 21 20) “Ham | xonTEaK nea Gren has) armay2d to 1 1 I 1 1 1 1 1 i ee RSS SESS STE STS ET SD | 1 : I I i I ron 2A TT TS re 1 i | 1 ney ea a ee ee eet 1 1 a I 355 wi ‘NOTA: Jadual asal mengikut "Master Work Programme’ JUMLAH TEMPOH PERMOHONAN E.0.1 = 236 -Melioaikon ulason dari Jab. Teknikal Dolaman dan Luoran, “* Melbotken viesan dori Jab, Tetnikal Dolaman sahaja, = Peiohonan Asal ° ° 0 TH Penyerohon/temotonar/Cadangon jadvel bat dat pinak Kontoktor ferdosarkan Timeline Kejeero Memindahkon Ui 285 8 HI omen/tioson dar pinot sk den Peruncing ‘Moa Tamsahan Unive Kea Pembingan ° ° o Keseluuhon ° #1 26 FE=} nersion E=>) cP P.O, Box 22477, 88784 Luyang, Kota Kinabalu, Sabah “Tek: 088-439 381, 430 378 Fax: 088-439:376, 435 660 PEMBINAAN KEKAL MEWAH SDN. BHD. «sn TA cm ober Se erm ne Our Ref. PKM/ PBIJKR 85-28/1/1/1.2 (582) Vol. 5 Date 27th February 2021 SUPERINTENDING OFFICER REPRESENTATIVE [SOR WPO04] Jabatan Kerja Raya Sabah WP04 Site Office, Papar Sabah Attentior juan Haliza Binti an Dear Mdm, PROJECT PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH - _WP04 : Menaiktaraf Jalan Dari Bongawan Ke Papar CONTRACT No : KKR/BPP/24/2019 SUBJECT : ADDITIONAL INFORMATIONS AND DOCUMENTS FOR EXTENSION OF TIME (2°) Reference is made to our earlier application of EOT No. 2 with our letter ref PKM/ PB/JKR 85-28/1/1/1.2 (529) Vol. 5 dated on 28" January 2021 and our zoom meeting with JKR and Consultant on 2™ February 2021 for the mentioned matters. We had received the comment given by our Resident Engineer, Ir. lan Wong with his memo WPO4/RE/MEMO/347 dated on 3" February 2021 We wish to confirm that = The application of EOT 2 was prepared in accordance with the “Critical Path Method” [CPM] + The cut-off date for our application of EOT no. 2 should be on 31% January 2021. "Attached herewith the approved Master Work Program Rev. 4 after EOT No. 1 being approved showing the critical path activities and highlighted the delay due to the Outstanding and New Land Acquisition, Demolition of Existing Structure and Delay in relocation of existing utilities line. [Attachment A, B, C] * Attached herewith the brief summary on the Computation of Estimated Days of Delay with activities 1D, original start date or expiry of original completion date, no of day delayed, delay issue, relevant clauses in the Contract as listed below:- [Attachment D] 4. Clause 43 (d) Delay in giving possession of the Site as provided under Clause 38 (d) where involving in * Delay due to Outstanding and New Land Acquisition * Delay in Demolition of Existing Structure * Delay in relocation of existing utilities (SESB, Jabatan Air, Telekom, Celcom & Petronas) Page 1of 4 Our Ref. PKM/ PB/JKR 85-28/1/1/1.2 (582) Vol. 5 Date 27th February 2021 PROJECT : PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH - _WP04 : Menaiktaraf Jalan Dari Bongawan Ke Papar CONTRACT No : KKR/BPP/24/2019 SUBJECT : ADDITIONAL INFORMATIONS AND DOCUMENTS FOR EXTENSION OF TIME (2°) _ As we highlighted in our earlier letters and correspondence records, due to outstanding and new land acquisition, demolition of existing structure within the work limit and delay in relocation of existing utilities line which also caused by the land and existing structure issue, we could not enter fully the Site since 3° December 2019. Total estimated current number of days delay is 2412 days delay (minimum) due to late site posses: 2. Clause 43 (b) Delay due to exceptionally inclement weather As per recorded by Jabatan Meteorologi Malaysia # Bongawan Station, it confirmed that the total raining days between month June 2020 - December 2020 after cease of MCO 1.0 (18th March 2020 - 9th June 2020) is about 150 raining days. - [A] Compared to Year 2012 - June - Dec # 83 raining days Year 2013 - June - Dec # 98 raining days Year 2014 - June - Dec # 94 raining days Year 2015 - June - Dec # 96 raining days Year 2016 - June - Dec # 106 raining days Year 2017 - June - Dec # 110 raining days Year 2018 - June - Dec # 85 raining days Year 2019 - June - Dec # 121 raining days Average of Raining Days (Yr 2012 - Yr 2019) = 793 days / 8 years = 99.125 days Say =99 days -[B] The different between Year 2020 (June-Dec) vs Average Past 8 years, the estimated number of days delay is 51 days delay due to exceptionally inclement weather at Year 2020 (June -December 2020) with the computation of [A]- [B] = 51 days. 3. Clause 43 (j) Delay by the Contractor's inability for reason beyond his control and which he could not reasonably have foreseen at the date of closing of tender of this Contract to seoure such goods and/or materials as are essential to the proper carrying out of the Work; and Clause 43 (k) Delay on the part of Nominated Subcontractor and/or Nominated Supplier (known as SESB, TM, JA, CTSB, Petronas) in relocation of their existing utilities ‘As we highlighted in our earlier letters and correspondence records, due to outstanding and new land acquisition and also demolition of existing structure within the work limit, it had also delayed the preparation of New Utilities Platform for the relocation works required in the contract. With the recent instruction to proceed the critical work under additional variation order work (within contract limit), there is a major issue of SESB cable material which required 4 months to order and deliver on site prior fully relocation work can be done at the existing highway or proposed widening section at CH85+125 — Page 2 of 4 Our Ref. : PKM/ PB/JKR 85-28/1/1/1.2 (582) Vol. 5 Date : 27th February 2021 PROJECT : PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH - WP04 : Menaiktaraf Jalan Dari Bongawan Ke Papar CONTRACT No : KKR/BPP/24/2019. SUBJECT : ADDITIONAL INFORMATIONS AND DOCUMENTS FOR EXTENSION OF TIME (2°) CH92+000 and CH105+800 - CH107+720. If not relocated on time, it will affect the earthwork and geotechnical work especially surcharge area which require longer time to complete. Therefore additional 120 days should be considered and added on to the current days of delay as reported in item (1) delay in late site possession or at later application of EOTs. 4. Clause 43 (a) Delay due to force majeure. At year 2020, our country faced serious issue on the outbreak of Pandemic Covid 19 throughout entire Malaysia. We have instructed to stop work from 18" March 2020 until 9! June 2020 under MCO 1.0. Although we had been granted 84days under first approved EOT No. 1 but the said EOT No. 1, it doesn't include the impacts and effects after the 1" MCO to the construction industry inclusive our work package which required us to comply strictly with the Standard Operating Procedure set by respective local authorities as well as time lost due to limited working time and resources, covid test, quarantine, reorganising to mobilize etc. ‘On 9" October 2020, PKPB at Papar has been enforced by Government until 12" January 2021 prior issuance of MCO 2.0. Although the construction industry can continue to proceed during MCO 2.0, but the production and achievements have been gradually reduced due to limited working time and resources with 50% beside the raining season. For record, the MCO 2.0 is ending on 18" February 2021 With the recent meeting with Tuan KPP, the assessment of number of days delay due to MCO J CMCO, we should continue to discuss with consultant CQS, SOP and JKR HQ QS Department. . Without taking consideration on the additional SESB cable material as per recent approval to proceed and other outstanding matters related to new land acquisitions, demolition of existing structures, surcharge requirement on existing highway and additional works, we are anticipating the project now to be delay in completion until 27% May 2023 based on earlier approved Work Program Rev.1 with critical path activities and current delay issues. Last and not least, we would like to seek your kind approval for our application of EOT No.2 with the total proposed additional days i.e. 257 days until 9"* June 2023 from 25" September 2022 which approved under EOT NO. 1. (Once approved with our application of EOT No.2, we should propose to reschedule the work activities based on the availability of the site and the current site condition for your further comment and approval. Thank you Page 3 of 4 Our Ref. : PKM/ PB/JKR 85-28/1/1/1.2 (582) Vol. 5 Date : 27th February 2021 PROJECT : PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH. - _WP04 : Menaiktaraf Jalan Dari Bongawan Ke Papar CONTRACT No : KKR/BPP/24/2019 SUBJECT ADDITIONAL INFORMATIONS AND DOCUMENTS FOR, EXTENSION OF TIME (2"°) Yours sincerely) PEMBINAAN KEKAL MEWAH SDN BHD. DATUK ROBERT TAN CHIEF EXECUTIVE OFFICER Iya Ce Project Director - Mr. Kok Nye Liang Pengarah Kerja Raya, Sabah, Ketua Penolong Pengarah, Cawangan Projek Pan Borneo — Tuan. Mohd Shamsul Nizam Bin Hj. Abdul Wahid durutera Projek WP4, Jabatan Kerja Raya, (Tuan Suhaibun Bin Matusin) Rijuan Resident Engineer, Exes! Consult - Ir. lan Wong Chung Yen Prokosman Konsultant- Sr. Peter Chang / Sr Francis Tan/ Mr.Anderson Perunding Puncak Anugerah — Ir Liu Fung Kiong Excel Consult — /r. lan Ma/Ir. Jonathan Wong Power Poject Consuttant Sdn Bhd — Ir. Chua Goeh Kin Page 4 of 4 SS eee eee ee Attachment A Original Critical Path Activities based on Approved Work Program Rev. 1 after 1* EOT 84days granted to 25" September 2022 errr rere — ae aoa aaa a9. a (0 wes Task Name Duration 2020) a1 | aw2 ges | gra | owes non avi | aw2 | ows | area Lene of acceptance Days Twe0R/i2/i9_ Tue03/12/18 ‘Sg. Bongawan Bridge 626days Tue 11/08/20 sun 25/09/22 ‘Sg. Bongawan Bridge(CH85+250) : Finish Odays Sun 25/09/22 Sun 25/08/22 ‘Sg. Nyaris-Nyaris Bridge 617 days Sat 22/08/20 Sun 25/09/22 we a1e22 Sg. Myers Byars BrigelCH86+475):insh Odays_sun25/09/22_Sun25/05/22 is tae 5 Minans Bridge 204days Tue 18/08/20 un 25/09/22 | i atea2 Sp. Kimans Brégl196+373): Fish days 5un25/09/22_ Sun 25/08/22 3 2 ans2 Benonl interchange 2 40 days Fri24/07/20 sun25/09/22 BL a1s22 enon Interchange (107/300): Fash days sun25/09/22_Sun 25/08/22 3 a7 4372 Section 1 (CHB5+125-CH86:526): Fish ‘days $un25/09/22.Sun725/05/22 e178 Seaton 4 (H92s000 -CH84%200); Fish ays Sun25/00/22. Sun 25/05/22 “$5 1..7.20 Section 10 (CH103+794 - CH105+800) : Finish ‘Odays ‘Sun 25/09/22 Sun 25/09/22 5711722 Seaton 11 (H105+800 -cH107+728): Fish days sun25/09/22_Sun25/08/22 6 o Toe 61 | | @ @ ; & aaaaia Commencement of tities Relocation Works D7Bdays Tue 03/12/19 Thu 28/01/21 1 1311122 Upgrading Old Alignment. AS7days Sat 18/07/20 Thu 28/01/21 | asaiia.a Section [CH85e125 -CH861526) 30days Tue 15/12/20 We 20/01/21 [praia Section 2 (CHB64526-CH88:500) 60days Thu 01/10/20 Non 34/12/20 wo gaaai223 Section 3(CH884900-€H82+000) G0days Sat 18/07/20 Wee 30/08/20 i tgiai224 Section 1 (CH10S¢800 = 1076728) 150 Prosress Baseline Cites A spit teat MEE roject Summary © Manual Progress ————— Page 3 of 4 Prepared by: Pembinaan Kekal Mewah Sdn Bhd MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR (wpoa) REVISION 1 (for Critical Path Activities Only) yA 2022 cr 4 io was Task Name Duration | Sank Finish a8 3020 moa Seer ass — v3 awa | ge | qu? as | ows wi | qw2 ows | awa qvi_| qu2 ava) avs 577 144109 Completion of Section 10 Odays sun 25/09/22 Sun 25/03/22 + 378 En EERE 98 144i Ste Clearing and Grubing 42 days F03/07720. Sat 2/08/20 — | se 14.4112 Demolition and Removal of Structure a2 days Sat 11/07/20 Tue 01/09/20 — | ser 1.44113 Embankment Fill 137 days Fri28/08/20 Mon 15/02/21 i —T | se Aree emer eal eee | [Se netted Remove and Replace a2 days Fri03/07/20 Sat 22/08/20 ye) | | | (see veatna2 Prefabricated Vertical Drains 24days Sat 15/08/20 Mon 14/09/20 | ee 5851441143 Surcharge Fill 120days_ Tue 27/10/20 Mon 22/03/21 CSE 585 1441144 Resting Period 215 days Tue 03/11/20 Mon 26/07/21 387 1441145 Remove of Surcharge S4days —Tue27/07/21_ thu 30/09/21 589 581 1441162 ‘ross Culvert (PC39/PC40/°CA1/BC23/0C42/ 2B6days Sat 26/12/20 Thu 14/10/21 43/1C29/8C24/PC44/ABCB) 52 1aaa.7 ROADS AND PAVINGS 575days Tue03/12/19 Mon 31/01/22 597 1441175 Laying and Paving Works 4149 days Mon 02/08/21 Mon 31/01/22 03 144119 Existing Carriage Way 3isdaysThu02/09/21 Sun 25/09/22 604 1.44.11.10 pletion of Section 11, Odays Sun 25/09/22_sun 25/ 2aseine Task VEN Task MEE Milestone # summary $$ Progress 2aseine Critical TI split critical ME Po ject Summary a Manual Progress ————— Pages of 4 Prepared by : Pembinasn Kekal Mewah Sdn Bhd aS aa a ca a a a a — we rr il Attachment B Changes of Critical Path Activities after consider the current delay issues on site with cut-off date on 31% January 2021 based on Approved Work Program Rev. 1 etl ae chee sie ae ee a a Pero oe oe hoe eee MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR (WP04) REVISION 1 with Delay until 31.01.2021 owas Task Name Duration Baseline Start Stat BaselineFnsh | Finish 9 2020 200 22 2033 93 im TT Ze Ee TERT OREO) Pen ESR OE OOS NE EE) GENERAL ITEMS & PRELIMINARIES Fe ae Om ee ONO ee Eee 766 days Tue 03/12/19) Twe 03/12/39. Sun25/03/22_ sun 25/09/22 “434441 FAT Visit, Material Purchase & Material On Site 45 days Tue 03/12/19 Tue 03/12/19 Fri24/01/20 Fri 24/01/20 6 13aaa2 Commencement of Utilities Relocation Works 437 days Tue 03/12/19 Tue 03/12/19 Thu 28/01/24 Sat 14/08/21, 66 ant ‘New Alignment 367 days Tue 03/12/19 Tue 03/12/19 Mon 07/12/20 Wed 19/05/21 67 13aaa244 Kimanis interchanges Odays Tue 03/12/19 Tue 03/12/19 Tue 03/12/19 Tue 03/12/19 68 13144242 Kelatuan Bridge Odays Tue 03/12/19 Tue 03/12/19 Tue 03/12/19 Tue 03/12/19 6813111213 Kimanis Bridge 30 days Mon 02/11/20 Mon 12/04/21 Mon 07/12/20 Wed 19/05/21 1341122 Upgrading Old Alignment 187 days Sat 18/07/20 Mon 01/02/21 Thu 28/01/21 Sat 14/08/21 13444224 Section 1 [CH8S#125 - CH86+526) 30days Tue 15/12/20 Thu01/07/21 Wed 20/01/21 Thu 05/08/21 m2 13411222 Section 2 (CH86+526 - CH88+900) GO days Thu01/10/20. Thu 15/04/21 Mon 14/12/20 Wed 30/06/21, 713111223 Section 3(CH88+900- CH92+000) 60 days 5at 28/07/20 Wed 30/09/20 Wed 14/04/21 1341.12.24 Section 11 (CH105+800 -cH107728) 4150 days sat 18/07/20 ‘Wed 20/01/21 Thu 05/08/21 7513411225 ESB Substation 120days Tue 25/08/20 Wed 10/03/21 Wee 20/01/21. Thy 05/08/21 7% 13111226 TESTING & COMMISSIONING 7 days Thu 21/01/21 __ Fri 06/08/21 Thu 28/01/21 Sat 14/08/21 7" 30 302 ne 134454 Confirmation on Detail Design & BC from IKR/PETRONAS SOdaysTve03/12/19. Twed3/12/19 Thu 11/06/20 Thy 11/06/20, ne 134152 Appoinment of Contractor 45 days Wed 29/07/20|MOROH/OR/AA Wed 23/09/20 Fri26/03/24 119131153 Proposed Protection Work 180days Thu 24/09/20. sat 27/03/21 Mon 03/05/23 Mon 08/11/21 701312 aus sto 359 days Thv.08/07/21 Tmv08/07/21. Sat 24/09/22 Sat 24/09/22 1211313 ROAD SIGNAGE 399 days Thu 08/07/21 Thu0s/07/21 Sat 24/09/22 Sat 24/09/22 24314 ROAD MARKING 359 days Thu 08/07/21 Thu0s/07/21 Sat 24/09/22 Sat 24/09/22 131.345 GUARDRAIL 359 days Thu 08/07/21 Thu0s/07/21 Sat 24/09/22 Sat 24/09/22 1413.16 Routine Maintenance day Sun 25/09/22, Sun 25/09/22, Sun 25/09/22, Sun 25/09/22 ws daa. Bored Pile Test (MLT / PDA / CSL / PIT) Stdays Tue 11/08/20) ‘Wed 02/12/20 Mon 24/05/21 130141112 Bore Remaining Piles (9n0s) 40 days Fri 18/09/20 Wed 10/03/21 Fri 06/11/20 Mon 26/08/21 1B 1aata3 RC Abutment /Pier Structure Works 205 days Thu 22/10/20 Tue 13/04/21 Mon 01/03/21 Sat 21/08/21, 12 1aai14 Retaining Wall & River Protection 42 days Tue 02/03/21 Mon 23/08/21. Tue 20/04/21 Wed 13/10/21 3 14a115 Precast Post Tension Beam [LHS] 394 days Wed 26/02/20 Wed 26/02/20 Thu25/03/21_Fri 17/09/21 [432 1aaiasa Precast Beam Fabrication 438 days Wed 26/02/20 Wed 26/02/20 Tue 17/03/20 Tue 17/03/20 1351411152 Installation of | Beams 21days Tue 02/03/21 Mon 23/08/21 Thu 25/03/21 Fri 17/03/21 136 141.116 Bridge Deck (LHS) 69 days Fri 26/03/21 Sat 18/09/21 Tue 22/06/21 Fri 10/12/21 (137 144.4.4.7 Pile Embankment [LHS] 472 days Wed 10/06/20 Wed 10/06/20 Sat 24/07/21 Thu 13/01/22 138 14ad.47.4 Batch 1 Materials Deliver (RC Square Piles) 117 days Wed 10/06/20 Wed 10/06/20 Sat 31/10/20 Sat 31/10/20 339 14a..a72 Piling Works 131 days Thu 11/02/21 Thu0S/08/21 Sat 24/07/21. Thu 13/01/22 Mo 14.118 Pavement & Bridge Furniture 27 days Mon 26/07/21 Fri14/01/22 Thu 26/08/21 Wed 16/02/22 cerereer) Completion of Bridge [LHS] days Thu 26/08/21 Wed 16/02/22 Thu 26/08/21 Wed 16/02/22, 342 1.4.4.1.1.10 Traffic Diversion to LHS Bridge 7 days Fri 27/08/21 Thu 17/02/22 Sat 04/09/21 Thu 24/02/22 [sana Demolition of Existing Bridge 30 days Mon 06/09/21 _ Fri 25/02/22 Tue 12/10/21. Thu 31/03/22 | La Progress — | srscine Cites A spit creat WE Project Summary — 2 Manual Progress: —————— Poge of 6 Prepared by: Pembinaan Kekal Mewah Sdn Bhd Pgh ec ge ete ee ele ane eae se it ee ee MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR (WP04) REVISION 1 with Delay until 31.01.2021 iD was Task Name Duration Baseline Sart Start Baseline Fin | Fin aadt2a Site Clearance / Temporary Works 29 days Mon 06/09/21 Fri 25/02/22 Mon 11/10/21 Wed 30/03/22 141.122 Bore Remaining Piles (1200s) 80 days _Fri24/09/21 Tue 15/03/22 Thu 30/12/21 Thu 23/06/22 141123 Bored Pile Test (PDA / CSL / PIT) 47 days Thu 25/11/21 Tue 17/05/22 Thu 20/01/22 Thu 14/07/22 aaa.24 RC Abutment / Pier Structure Works 100 days Mon 29/11/21 Fri 20/05/22 Tue 29/03/22 Wed 21/09/22 aa1125 Retaining Wall & River Protection 58 days Wed 30/03/22 Thu 22/09/22 Mon 13/06/22 Tue 29/11/22 14.11.26 Precast Post Tension Beam [RHS] 305 days Tue 13/04/21 Wed 06/10/21. Sat 23/04/22 Mon 17/10/22 1.411.261 Precast Beam Fabrication 88 days Tue 13/04/21 Wed 06/10/21 Sat 31/07/21 Thu 20/01/22 1.41.1.2.6.2 Installation of | Beams 21 days Wed 30/03/22 Thu 22/09/22 Sat 23/04/22 Mon 17/10/22 141.127 Bridge Deck [RHS] Bi days Mon 25/04/22 Tue 18/10/22 Fri0s/o8/22 Fri 20/01/23 14.11.28 Pile Embankment [RHS} 634 days Sat26/12/20 Sat 26/12/20 Mon 29/08/22 Mon 13/02/23, “144.1284 Batch 1 Materials Deliver (RC Square Piles) 230 days Sat 26/12/20 Sat 26/12/20 Thu07/10/21 Thu 07/10/21 1.411.282 Piling Works 146 days Wed 02/03/22 Tue 23/08/22 Mon 29/08/22 Mon 13/02/23 141.129 Pavement & Bridge Furniture 23 days Mon 29/08/22 Mon 13/02/23 Sun 25/09/22 Fri 10/03/23 1.4.1.1.2.10 Completion of Bridge [RHS] Odays Sun 25/09/22 Fri 10/03/23 sun 25/09/22 _ Fri 10/03/23, 162 141242 | [ier iaaaa3 [sara fie tarzas [ae naa2152 [ier iarzas2 [ee tai2is (se .anzaz [mo tarzaza [432372 [ia aaiis [as aaiaie ae 14.2330 vs haan 6 arr 443324 18 141222 141223 0 141224 ai 141225 a 141226 3 4412261 [Hee 4.2.26.2 8141227 Ws 141228 187 1a 1a 190 141.2281 14.1.2.2.8.2 14.1.2.29 1.4.1.22.10 ae ea Bored Pile Test (MLT / PDA / CSL / PIT) 1100 days Wed 23/12/20 Sat 05/06/21 Bore Remaining Piles (9n0s) 42 days Wed 21/10/20 Wed 31/03/21 Fri11/12/20 Sat 22/05/21 RC Abutment / Pier Structure Works 300 days Thu 26/11/20 Wed 05/05/21 Fri 26/03/21. Tue 07/09/21 Retaining Wall & River Protection 42 days Sat 27/03/21 Wed 08/09/21 Wed 19/05/21 Fri 29/10/21 Precast Post Tension Beam [LHS] 457 days Thu26/12/19 Thu 26/12/19 Wed 21/04/21 Mon 04/10/21. Precast Beam Fabrication 28 days Thu 26/12/19 Thu 26/12/19 Thu 30/01/20 Thu 30/01/20, Installation of | Beams ‘21 days Sat 27/03/21 Wed 08/09/21 Wed 21/04/21 Mon 04/10/21 Bridge Deck {LHS} 58 days Thu22/04/21 Tue 0/10/21 Mon 05/07/21 Mon 13/12/21 Pile Embankment [LHS] 462 days Wed 10/06/20 Wed 10/06/20 Fri23/07/21 Fri 31/12/21 Batch 1 Materials Deliver (RC Square Piles) 112 days Wed 10/06/20 Wed 10/06/20 Fri23/10/20 Fri 23/10/20 Piling Works 138 days Tue 02/02/21 Thurs/o7/21 _Fri23/07/21_ Fri 31/12/21 Pavement & Bridge Furniture 37 days Sat 24/07/21 Mon 03/01/22. Tue 07/09/21 Wed 16/02/22 Completion of Bridge [LHS] Odays Tue 07/09/21 Wed 16/02/22 Tue 07/09/21 Wed 16/02/22, Traffic Diversion to LHS Bridge 7 days — Wed 08/09/21 Thu 17/02/22 Wed 15/09/21. Thu 24/02/22 Demolition of Existing Bridge 30 days Fri37/09/21_Fri2s/02/22_ Sat 23/10/21. Thu 31/03/22 Site Clearance / Temporary Works Ba days ——Fri17/09/21Fri25/02/22 Thu 28/10/21 Tue 05/04/22 Bore Remaining Piles (12n0s) 82days Thu 21/10/21 Tue 29/03/22 Thu 10/02/22 Fri 22/07/22 Bored Pile Test (PDA / CSL, PIT) 48 days Wed 05/01/22 _Fri17/06/22 Thu 03/03/22 Sat 13/08/22 RC Abutment / Pier Structure Works 101 days Sat 08/01/22 Tue 21/06/22 Wed 11/05/22 Fri 21/10/22 Retaining Wall & River Protection 60 days Thu 12/05/22 Sat 22/10/22 Tue 26/07/22 Sat 31/12/22 Precast Post Tension Beam [RHS] 331 days Thu 22/04/21 Tue 05/10/21 Thu 09/06/22 Tue 15/11/22 Precast Beam Fabrication 66 days Thu 22/08/21 Tue 05/10/21 Wed 14/07/21 Wed 22/12/21 Installation of | Beams 2idays Thu 12/05/22 Sat 22/10/22 Thu 09/06/22 Tue 15/11/22 Bridge Deck [RHS) @5days Fri 10/06/22 Wed 16/11/22 Fri26/08/22 Tue 31/01/23 Pile Embankment [RHS] 628 days Thu 03/12/20 Thu 03/12/20 Wed 10/08/22. Sat 14/01/23 Batch 1 Materials Deliver (RC Square Piles) 290days Thu 03/12/20 Thu03/12/20 Fri26/11/21 Fri 26/11/21 Piling Works 132 days Mon 28/02/22 Wed 10/08/22 Wed 10/08/22 Sat 14/01/23 Pavement & Bridge Furniture 37 days Fri 12/08/22 Tue 17/01/23 Sun 25/09/22 Tue 28/02/23 Completion of Bridge {RHS) days sun 25/09/22 Tue 28/02/23 Sun 25/09/22 Tue 28/02/23 ite Clearance/ Temporary Works Ssselne Task VV Task Bascine Critical TTR split a as Tue 18/08/20 Thu 19/11/20 sat 22/05/21 ect: EEE Milestone critical . summary ME Froject Summary Page? of 6 > Prowiess ‘Manual Progress: ———__— Prepared by: Pembinaan Kekal Mewah Sdn Bhd

You might also like