You are on page 1of 1

KEY:

SITE LOCATION

240
DTVC LOT-240 H
KKA
PCRC BUILDING MA

NOTES:
• FOR FIREFIGHTING LIST OF DRAWINGS, REFER TO GENERAL
DRAWING CONTROL LOG No. GN001.

4 . CLEAN AGENT SYSTEMS (BMS ROOM IN BASEMENT AND TER ROOM IN GROUND)
1. FIRE FIGHTING SYMBOLS/ABBREVIATIONS 2. FIRE FIGHTING GENERAL NOTES 3. GENERAL NOTES

ABBREVIATIONS DESCRIPTION SYMBOLS


AAV AUTOMATIC AIR VENT 1.DO NOT SCALE THESE DRAWINGS TO DETERMINE DIMENSIONS. 1 . THE CONSTRUCTION CONTRACTOR SHALL PREPARE DURING CONSTRUCTION SHOP DRAWINGS SHOWING THE LOCATIONS AND SIZES OF ALL
1. FOR ALL GASEOUS FIRE SUPPRESSION SYSTEMS THE SPECIALIST CONTRACTOR SHALL REFER TO
CV CHECK VALVE ACCESS PANELS IN FALSE CEILING THAT ARE REQUIRED FOR MAINTENANCE, ADJUSTMENT OR REPLACEMENT OF MECHANICAL NFPA,2001-2018, THE SPECIFICATION & SHALL INSTALL THE SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS
DN DOWN - 2.ALL WORK SHALL BE DONE IN ACCORDANCE WITH CODES AND STANDARDS MENTIONED IN THE BASIS OF DESIGN DOCUMENT. ITEMS. THESE SHOP DRAWINGS SHALL BE DONE IN COORDINATION WITH ALL CONCERNED PARTIES INCLUDING THE INTERIOR & REGULATIONS OF THE LOCAL AUTHORITY HAVING JURISDICTION.
DP DRY PIPE - DESIGNER AND SHALL BE SUBMITTED FOR REVIEW & APPROVAL OF THE ENGINEER.
EJ EXPANSION JOINT 2. THE SPECIALIST CONTRACTOR SHALL ISSUE THE FOLLOWING INFORMATION TO THE ENGINEER FOR
3. CONTRACTOR SHALL REFER TO PROJECT SPECIFICATIONS FOR CONSTRUCTION OF FIRE PROTECTION SYSTEM. 2. THE CONSTRUCTION CONTRACTOR SHALL SUBMIT COMPOSITE COORDINATED DRAWINGS SHOWING ALL SERVICES (A/C, FIRE FIGHTING, FIRE ALARM,
DR DRY RISER - WATER SUPPLY, LIGHTING.......) FOR REVIEW AND APPROVAL OF ENGINEER.
APPROVAL PRIOR TO SUBMISSION TO THE LOCAL AUTHORITY HAVING JURISDICTION.
FA FROM ABOVE - a) TYPE OF CLEAN AGENT USED.
FB FROM BELOW - 4.DRAWINGS INDICATE GENERAL ROUTING OF FIRE PIPING. CONTRACTOR SHALL BE RESPONSIBLE 3 . ALL EQUIPMENT INSTALLED ON ROOF OR EXPOSED TO AMBIENT CONDITION SHALL BE COATED AND WEATHER PROOF.
b) CALCULATION OF CYLINDER CAPACITY.
FBL FIRE BLANKET FOR ADDITIONAL SPRINKLERS OFFSETS, FITTINGS, ETC. TO COORDINATE PIPING LAYOUT WITH STRUCTURAL, DUCTWORK, PIPING, 4. OPENINGS IN ROOF STRUCTURE AROUND PIPES OR OTHER EQUIPMENT SHALL BE CLOSED AND SEALED IN A SOLID NEAT
c) CALCULATION OF PIPE WORK SIZING.
FDC FIRE DEPARTMENT CONNECTION CONDUIT ETC. APPROVED MANNER, AND MADE WEATHER PROOF.
d) FULL DETAILS OF NOZZLE SELECTION
FDR ZONE CONTROL STATION DRAIN PIPE - 5 . THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL NECESSARY SUPPORTS AND HANGERS FOR PIPING. THE LOCATION OF SUPPORTS AND
FE-1 FIRE EXTINGUISHER-10 LBS CO2 HANGERS SHALL BE INCORPORATED ON THE RELEVANT SHOP DRAWINGS FOR REVIEW AND APPROVAL OF THE ENGINEER. e) INTERFACES WITH THE FIRE ALARM SYSTEM & OTHER ASSOCIATED SYSTEMS.
FE-2 FIRE EXTINGUISHER-10 LBS DRY POWDER 5.CONTRACTOR SHALL COORDINATE WITH OTHER TRADES, VERIFY DIMENSIONS, CONDITIONS AND LAYOUT AT JOB SITE PRIOR TO FABRICATION f) EXTRACT SYSTEM / PRESSURE RELIEF REQUIRED.
6. DESIGN PARAMETERS.
FE-3 FIRE EXTINGUISHER-25 LBS DRY POWDER OF MATERIAL AND PROVIDE ANY ADDITIONAL MATERIAL OR MODIFICATIONS TO FURNISH A COMPLETE AND OPERABLE FIRE PROTECTION SYSTEM
a) DESIGN STANDARD - NFPA 13 & NFPA 14
FFL FINISHED FLOOR LEVEL - TO MEET THE REQUIRED CODES. b) HAZARD CLASSIFICATIONS:
3. THE CONTRACTOR SHALL ENSURE ALL FIRE/SMOKE/FIRE & SMOKE DAMPERS ARE UNIQUELY NUMBERED &
FHC FIRE HOSE CABINET OCCUPANCY / AREA HAZARD CLASSIFICATION SPRINKLER TYPE
REFERENCED, AS SPECIFIED. THE CONTRACTOR SHALL ALSO CLEARLY IDENTIFY ON THE CAUSE & EFFECT
FLOOR
FHP FIRE HOSE REEL PIPE - 6.FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE WALLS. FIRE STOPPING SHALL BE OF A UL LISTED OR FM APPROVED ASSEMBLY. FIRE STOP SHALL MATRIX WHICH MOTORIZED FIRE/SMOKE DAMPERS WILL OPEN & CLOSE IN THE EVENT OF FIRE. THESE
- FM 200 CYLINDER BASEMENT MULTIPURPOSE, PRAYER AREA LIGHT HAZARD QUICK RESPONSE PENDENT DETAILS SHALL BE DEVELOPED BY THE CONTRACTOR FROM THE SPECIFIED CAUSE & EFFECT STRATEGY.
- FM 200 NOZZLE C ALSO MEET ASTM E814. THE CAUSE AND EFFECT MATRIX SHALL BE ISSUED TO THE ENGINEER FOR APPROVAL PRIOR TO
PARKING AREA, MECH. ROOM ORDINARY HAZARD GR-1 QUICK RESPONSE UPRIGHT SUBMISSION TO THE LOCAL AUTHORITY HAVING JURISDICTION.
FS FLOW SWITCH
7.WHERE THE INSTALLATION OF DUCTS IN WALLS, FLOORS OR PARTITIONS NECESSITATE REMOVAL OF ANY FIRE STOPPING, THE SPACES AROUND WORKSHOP EXTRA HAZARD GR-1 STANDARD UPRIGHT
G.S
HL
GALVANIZED STEEL
HIGH LEVEL
-
- THE DUCT AT SUCH POINT WHERE FIRE STOPPING WAS REMOVED SHALL BE SEALED WITH NON-COMBUSTIBLE INSULATING MATERIAL. EXTRA HAZARD GR-2 STANDARD UPRIGHT
4. THE CONTRACTOR SHALL PROVIDE TWO TROLLEY MOUNTED EXTINGUISHER SYSTEMS, SUITABLE FOR USE ON
11 KV TRANSFORMERS, AS INSTALLED BY THE LOCAL ELECTRICITY AUTHORITY. THE TROLLEY MOUNTED
LEGENDS:
FIRE PUMPS & DIESEL TANK ROOM
IL INVERT LEVEL - EXTINGUISHERS SHALL BE AS SPECIFIED & IN ACCORDANCE WITH THE REQUIREMENTS & REGULATIONS OF
LBS POUNDS - GROUND FLOOR LAB AREAS & PILOT PLANT ORDINARY HAZARD GR-2 QUICK RESPONSE UPRIGHT THE LOCAL AUTHORITY HAVING JURISDICTION. FULL DETAILS SHALL BE ISSUED TO THE ENGINEER FOR
8.ALL FIRE FIGHTING SYSTEM COMPONENTS SHALL BE UL LISTED AND/OR FM APPROVED AND ALL WORK SHALL BE EXECUTED AS PER NFPA AND APPROVAL PRIOR TO SUBMISSION TO THE LOCAL AUTHORITY HAVING JURISDICTION.
LV LANDING VALVE LOBBY AND OFFICES LIGHT HAZARD QUICK RESPONSE PENDENT
NTS NOT TO SCALE - INTERNATIONAL REGULATIONS . THE CONTRACTOR IS RESPONSIBLE TO OBTAIN THE APPROVALS FROM THE ENGINEER.
OS & Y OUTSIDE SCREW & YOKE FIRST FLOOR OFFICES AND WORKSTATION AREA LIGHT HAZARD QUICK RESPONSE PENDENT
PG PRESSURE GAUGE 9.CONTRACTOR SHALL SUBMIT FOR APPROVAL SHOP DRAWINGS/WORKING PLANS IN STRICT COMPLIANCE WITH SECTION 27.1 OF NFPA-13-2019. WATER HEATER ROOM & STORAGE ORDINARY HAZARD GR-1 QUICK RESPONSE UPRIGHT
PRV PRESSURE RELIEF VALVE
PVA PREACTION VALVE ASSEMBLY 10.CONTRACTOR SHALL PROVIDE MAINTENANCE ACCESS PANELS TO ALL VALVES AND WHEREVER REQUIRED. LOCATIONS OF PANELS SHALL BE
c) INSTALLATION TYPE - WET PIPE SYSTEM FOR ALL BUILIDING EXCEPT FOR LABORATORIES AND PILOT PLANT. 5. FM200 SYSTEMS CONTROL SEQUENCE
SPR SPRINKLER PIPE -
COORDINATED WITH FIRE PROTECTION DESIGNER.
- PREACTION SYSTEM FOR LABORATORIES AND PILOT PLANT
TA TO ABOVE -
TB TO BELOW - 11. SPRINKLER SYSTEM SHALL BE DESIGNED FOR A MAXIMUM WORKING PRESSURE OF 175 PSI.
TYP TYPICAL - d) DESIGN COVERAGE AREA OF SPRINKLER HEADS LIGHT HAZARD - 20.0m2
WP WET PIPE - ORDINARY HAZARD GR-1 -12 m2
12. ALL SPRINKLER PIPE AND FITTINGS SHALL BE INSTALLED SO THAT THE SYSTEM CAN BE DRAINED. a. FM200 SYSTEMS SHALL BE ENERGIZED FROM THE RESPECTIVE CONTROL PANELS.
WR WET RISER - ORDINARY HAZARD GR-2 -12 m2
ZCS ZONE CONTROL STATION - EXTRA HAZARD GR-1 - 9 m2
13.ALL CONTROL, DRAIN AND TEST CONNECTION VALVES SHALL BE PROVIDED WITH PERMANENTLY MARKED WEATHERPROOF METAL OR RIGID b. IN CASE OF LEVEL-1 FIRE DETECTION (ONE SMOKE DETECTOR ACTIVATED), THE NOVEC CONTROL PANEL SHALL INITIATE A FIRE ALARM AND
EXTRA HAZARD GR-2 - 9 m2
PLASTIC IDENTIFICATION SIGNS. THE SIGN SHALL BE SECURED WITH CORROSION-RESISTANT WIRE, CHAIN OR OTHER APPROVED MEANS. TRANSMIT A FIRE SIGNAL TO THE MAIN FIRE ALARM CONTROL PANEL IN THE BUILDING.
e) SPRINKLER TYPE IN ALL LOCATIONS - QUICK RESPONSE
EXCEPT FOR EXTRA HAZARD SPACES (WORKSHOP & PUMP ROOM) -STANDARD RESPONSE
14. CONTRACTOR SHALL ROUTE PIPING AROUND ALL OBSTRUCTIONS AND PROVIDE SPRINKLER PROTECTION UNDER OBSTRUCTIONS, AS PER NFPA c. THE OPERATORS SHALL CHECK THE SITUATION. IN CASE OF FALSE ALARM OR SMALL FIRE THAT CAN BE HANDLED MANUALLY, THE
13 AS PART OF THE FIELD COORDINATION AT NO ADDITIONAL COST. 7. THE SPRINKLER SYSTEM SHALL BE COMPLETE WITH ALL NECESSARY ACCESSORIES, IN NECESSARY ACTION SHALL BE TAKEN AND THE CONTROL PANEL SHALL BE RESET TO NORMAL SITUATION.
ACCORDANCE WITH NFPA 13 & 14; BUT SHALL NOT BE LIMITED TO THE FOLLOWING
15. ALL SUPERVISORY CONTROL VALVES SHALL BE OS&Y RISING STEM TYPE WITH TAMPER SWITCH AND ONNECTED TO BUILDING FIRE PANEL AND ACCESSORIES : d. IN CASE OF LEVEL-2 FIRE DETECTION (AT LEAST 2 SMOKE DETECTORS ACTIVATED), ALL PERSONNEL SHALL EVACUATE THE ROOM PRIOR TO
SHALL BE PROVIDED FOR ALL NORMALLY OPEN VALVES. - WATER ALARM GONG NOVEC GAS AUTOMATICALLY DISCHARGE.
- SPRINKLER TEST METER
- LOW LEVEL AUDIBLE ALARM
16.ALL PORTABLE FIRE EXTINGUISHERS SHALL BE INSTALLED AND DISTRIBUTED IN ACCORDANCE WITH THE LATEST EFITION OF NFPA 10-2018. - HIGH PRESSURE ALARM VALVE
- SUPERVISED ISOLATING VALVE ( BUTTERFLY TYPE ) WITH "OPEN & CLOSED"
INDICATIONS WIRED TO THE NEAREST FIRE ALARM PANEL.
17.CONTRACTOR SHALL PROVIDE & INSTALL AUTOMATIC AIR VENTS AT ALL HIGH POINTS & DRAIN VALVES AT ALL LOW POINTS. - FLOOR CONTROL VALVES WITH DRAIN AS PER NFPA-13
FOR EACH FLOOR BRANCH CONNECTION.
18. COLOR CODING FOR PIPING AND EQUIPMENT SHALL BE COMPLETED AS PER REQUIREMENTS OF NFPA & INTERNATIONAL STANDARDS. 8. THE CONSTRUCTION CONTRACTOR TO ENSURE SPRINKLERS ARE PROVIDED ADDITIONALLY
WITHIN:-
a) CONCEALED SPACES OF NONCOMBUSTIBLE AND LIMITED COMBUSTIBLE
19. CONTRACTOR SHALL SUBMIT MANUFACTURER DATA SHEETS AND CATALOG CUT TO THE RESPONSIBLE STANDARDIZATION AGENT OF THE CONSTRUCTION WITH LIMITED ACCESS AND NOT PERMITTING OCCUPANCY
CLIENT FOR REVIEW AND APPROVAL PRIOR TO PURCHASE. OR STORAGE OF COMBUSTIBLES SHALL NOT REQUIRE SPRINKLER PROTECTION .
b) SERVICE FLOORS/PLANT ROOMS TO ENSURE ADEQUATE COVERAGE TO ALL
20. CONTRACTOR SHALL PROVIDE COVER TO ALL EXTERIOR PORTABLE FIRE EXTINGUISHERS AS PER THE RECOMMENDATION OF MANUFACTURER AREAS ONCE THE SYSTEM LAYOUT HAS BEEN FULLY COORDINATED WITH
AND SHALL BE APPROVED PRIOR TO INSTALLATION BY SAUDI ARAMCO REPRESENTATIVE. OTHER SERVICES.

21. ALL SIDE WALL SPRINKLER SPACING SHALL COMPLY WITH NFPA,13-2019 WITH REGARDS TO ALL POSSIBLE OBSTRUCTIONS. 6. PIPE SIZES FOR SPRINKLERS AS PER NFPA,13-2019
22. FIRE HOSE CABINET SHALL BE PROVIDED IN ACCORDANCE WITH LOCAL CIVIL DEFENSE AUTHORITY RULES & REGULATIONS AND NFPA,14-2018.

23. FIRE WATER TANKS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA,22-2018. TABLE 27.5.2.2.1 LIGHT HAZARD PIPE SCHEDULE (STEEL PIPE) TABLE 27.5.3.4 ORDINARY HAZARD PIPE SCHEDULE (STEEL PIPE)
NO. OF SPRINKLERS PIPE SIZE NO. OF SPRINKLERS PIPE SIZE
24. CONTRACTOR SHALL PROVIDE SIGNAGE ON FIRE HOSE CABINET (FHC) VISIBLE FOR OCCUPANTS INDICATING THAT " FIRE HOSE CABINET (FHC)
SHALL BE OPERATED OR FUNCTIONED BY AUTHORIZED TRAINED PROFESSIONAL PERSON ONLY". UPTO 2 SPRINKLERS 25∅ UPTO 2 SPRINKLERS 25∅
UPTO 3 SPRINKLERS 32∅ UPTO 3 SPRINKLERS 32∅
UPTO 5 SPRINKLERS 40∅ UPTO 5 SPRINKLERS 40∅
25. ANTI-VORTEX PLATE SHALL BE PROVIDED AT THE FIRE PUMP SUCTION LINE TO CONTROL VORTEX FLOW IN ACCORDANCE WITH NFPA,22-2018.
6 - 10 SPRINKLERS 50∅ 6 - 10 SPRINKLERS 50∅
11 - 30 SPRINKLERS 65∅ 11 - 20 SPRINKLERS 65∅
26. UPRIGHT SPRINKLER HEADS IN AREAS WITHOUT FALSE CEILING SHALL BE POSITIONED AT A MAXIMUM DISTANCE OF 30 cm FROM CEILING AS 30 - 60 SPRINKLERS 80∅ 21 - 40 SPRINKLERS 80∅
PER NFPA CODE. ALL CLEARANCES REQUIRED IN NFPA CODE REGARDING OBSTRUCTIONS TO SPRINKLER DISCHARGE SHALL BE RESPECTED. 61 - 100 SPRINKLERS 100∅ 41 - 100 SPRINKLERS 100∅
101 - 275 SPRINKLERS 150∅
27. ALL LOW POINTS OF THE FIRE WATER PIPING SHALL BE PROVIDED WITH DRAIN VALVES & PLUGS.

28. THE CONTRACTOR SHALL SUBMIT DURING CONSTRUCTION CALCULATIONS FOR EACH PRESSURE REDUCING VALVE INDICATING THE REQUIRED
RATINGS FOR THE VALVE.
* OTHERWAISE, SIZES ARE HYDRAULICALLY CALCULATED
(REFER TO CALCULATION DOCUMENT NO. GN011 )
29. ALL PIPES CROSSING CONCRETE EXPANSION JOINTS SHALL HAVE PIPE EXPANSION JOINTS.

30. PIPE MATERIAL :OTHERWISE SPECIFIED ON DRAWINGS FIRE PROTECTION PIPES TO BE BLACK STEEL SCH.(40).
:FIRE DEPARTEMNT CONNECTION FEED PIPE UP TO THE CHECK VALVE SHALL BE GALVANIZED STEEL SCH.(40).
:FIRE PIPES DOWNSTREAM PREACTION VALVE SHALL BE GALVANIZED STEEL SCH.(40).

31. FOR ROOMS PROTECTED BY FM200 , CONTRACTOR SHALL PREPARE A COMPLETE LAYOUT OF THE SYSTEM INCLUDING PIPING, NOZZLES,
VALVES, CONTROLS, ACCESSORIES, ...ETC. ALL IN ACCORDANCE WITH THE REQUIRMENTS OF NFPA-2001 TO PROVIDE A SAFE, COMPLETE AND
FUNCTIONAL SYSTEM AND SHALL SUBMIT FOR ENGINEER'S APPROVAL.

32.SPRINKLERS UNDER SKYLIGHTS EXPOSED TO THE DIRECT SUN RAYS SHALL BE OF THE INTERMEDIATE TEMPERATURE CALSSIFICATION AS PER
NFPA 2013-2019 9.4.2.5)

33.ACCORDING TO NFPA-13. 2019 SECTION 9.2.6 SPRINKLER SHALL NOT BE REQUIRED IN ELECTRICAL ROOMS BECOUSE ALL THE FOLLOWING ARE
MET:
a) THE ROOM IS DEDICATED TO ELECTRICAL EQUIPMENT ONLY.
b) ONLY DRY TYPE ELECTRICAL EQUIPMENT IS USED.
c)EEQUIPMENT IS INSTALLED IN 2-HOURS FIRE RATED ENCLOSURE INCLUDING PROTECTION OF PENETRATION.
d) NO COMBUSTIBLE STORAGE IS PERMITTED TO BE STORED IN THE ROOM.

7. SPRINKLERS TEMPERATURE RATINGS SHALL BE AS PER NFPA,13-2019:

0C 100% DETAILED DESIGN KA NOV.2022


0B 90% DETAILED DESIGN KA SEPT.2022
0A 60% DETAILED DESIGN KA MAY 2022
00 30% DETAILED DESIGN KA DEC.2021
No. REVISION APP'D DATE

CLIENT:

CLIENT:

CONSULTANT:

DESIGNER:

8. MAXIMUM DISTANCE BETWEEN HANGERS AS PER NFPA,13-2019:

CONTRACTOR:
KABBANI GENERAL CONTRACTING

KABBANI ARCHITECTURAL CONCEPTS

PROJECT TITLE
PETROLEUM CONVERSION
RESEARCH CENTER- DTVC
DRAWING TITLE

FIRE FIGHTING LEGEND AND GENERAL


NOTES
DESIGNED KA PROJECT No.
REVIEWED KA
VERIFIED KA KH21029

FILE NAME: ENTER FILE NAME


APPROVED KA SHEET SIZE A0
DATE NOV.2022 SCALE N.T.S.
ISSUED FOR 100% DETAILED DESIGN
PROJECT ZONE BLDG. STAGE SERIAL NUMBER REVISION

KH21029 00 GN DD FG001 0C

You might also like