You are on page 1of 4

200'

Designed Appurtenance Loading

C
2.375 OD X .154 Elev Description Tx-Line
200 Lights & Lightning Rod (1) 1"

706
NONE 196 11.9 sq. ft. EPA (6) DC + Fiber Bundle
196 3V-Boom - 10ft Face - 3ft Standoff
180' 196 (6) 4.5' x 1' x 1' Panel (6) 7/8"
C
2.375 OD X .218

23 Leg Dish Mount


790 23 (1) 6' H.P. Dish (1) 7/8"
NONE

Design Criteria - EIA/TIA-222-F


Wind Speed 90 mph
160' 0 in concurrent
5'

Ice Thickness
C
2.875 OD X .276

Base Reactions
L 2 X 2 X 1/8

20 @ 5'
964

Total Foundation Individual Footing


NONE

Shear (kips) 27.83 Shear (kips) 16.88


Axial (kips) 19.55 Compression (kips) 169
140' Moment (ft-kips) 2669 Uplift (kips) 142
C

Material List
(1) 5/8"

1155

Display Value
3.500 OD X .300

A L 3 1/2 X 3 1/2 X 1/4


B L 2 1/2 X 2 1/2 X 3/16
120'
SIZES ARE PRELIMINARY AND MAY CHANGE UPON FINAL DESIGN

C L 2 X 2 X 1/8

Notes
1256
7'

1) All legs are A500 (50 ksi Min. Yield).


2) All braces are A572 Grade 50.
3) All brace bolts are A325-X.
100'
4) The tower model is S3TL Series HD1.
4.000 OD X .318

5) Transmission lines are to be attached to 6-over-10 waveguide


L 2 X 2 X 3/16

ladders.
1596
9'

6) Azimuths are relative (not based on true north).


7) Foundation loads shown are maximums.
8) (6) 1" dia. x 51"-long F1554 grade 105 anchor bolts per leg.
80'
9) All unequal angles are oriented with the short leg vertical.
10) Weights shown are estimates. Final weights may vary.
9 @ 6.6667'
1910
11'
B
NONE
5.563 OD X .258

60'
2188
13'
L 3 X 3 X 3/16

40'
(1) 3/4"

2373
15'
5.563 OD X .375

4 @ 10'

20'
2958
17'
A

0'
Panel Count/Height

19' - 0"
Top Face Width

Section Weight
Brace Bolts
Horizontals
Diagonals
Legs

Quote:
Sabre Industries 21-3971-CLA
7101 Southbridge Drive
P.O. Box 658 Customer: SPONSOR TELECOM
Sioux City, IA 51102-0658
Phone: (712) 258-6690
Site Name: Nicaragua El Payon 60mts
Fax: (712) 279-0814
Description: 200' S3TL
Information contained herein is the sole property of Sabre Communications Corporation, constitutes a trade
secret as defined by Iowa Code Ch. 550 and shall not be reproduced, copied or used in whole or part for
any purpose whatsoever without the prior written consent of Sabre Communications Corporation. Date: 1/13/2021 By: KJL Page: 1
No.: 21-3971

Date: 1/13/21
By:

Customer: SPONSOR TELECOM


Site: Nicaragua El Payon 60mts

200 ft. Model S3TL Self Supporting Tower At


90 mph Wind + 0 in. Ice (concurrent) per ANSI/TIA/EIA-222-F-1996.
Antenna Loading per Page 1
PRELIMINARY -NOT FOR CONSTRUCTION-

0'-6"
3'-0"
Grade Dia. Notes:
1). Concrete shall have a minimum
28-day compressive strength of
3000 PSI, in accordance with
Two (2) #4 ties ACI 318-05.
within top 5" of
concrete 2). Rebars to conform to ASTM specification
A615 Grade 60.

3). All rebar to have a minimum of 3"


concrete cover.

4). All exposed concrete corners to be


35'-6"
35'-0"

chamfered 3/4".

5). The foundation design is based on


"Normal Soils" as defined in ANSI/TIA/EIA-
222-F. It is recommended that a soil
analysis of the site be performed to verify
the soil parameters used in the design.

7). This is a design drawing only. Please


see final construction drawings for all
ELEVATION VIEW installation details.
(9.29 Cu. Yds. each) Rebar Schedule per Pier
(3 REQUIRED; NOT TO SCALE)
(12) #7 vertical rebar w/#4 ties, two (2)
Pier
within top 5" of pier then 12" C/C

Information contained herein is the sole property of Sabre Industries, constitutes a trade secret as defined by Iowa Code Ch. 550 and shall not be
reproduced, copied or used in whole or part for any purpose whatsoever without the prior written consent of Sabre Industries.

7101 Southbridge Drive - P.O. Box 658 - Sioux City, IA 51102-0658 - Phone 712.258.6690 - Fax 712.279.0814
No.: 21-3971

Date: 1/13/21
By:

Customer: SPONSOR TELECOM


Site: Nicaragua El Payon 60mts

200 ft. Model S3TL Self Supporting Tower At


90 mph Wind + 0 in. Ice (concurrent) per ANSI/TIA/EIA-222-F-1996.
Antenna Loading per Page 1
PRELIMINARY -NOT FOR CONSTRUCTION-

Center of Tower
and Foundation

Notes:
1). Concrete shall have a minimum

13'-9"
28-day compressive strength of
3000 PSI, in accordance with
ACI 318-05.

27'-6"
2). Rebar to conform to ASTM specification
A615 Grade 60.
13'-9"

3). All rebar to have a minimum of 3"


concrete cover.

4). All exposed concrete corners to be


13'-9" 13'-9" chamfered 3/4".

5). The foundation design is based on


27'-6"
"Normal Soils" as defined in ANSI/TIA/EIA-
PLAN VIEW 222-F. It is recommended that a soil
analysis of the site be performed to verify the
Two(2) #4 ties soil parameters used in the design.
2'-6" within top 5" of
0'-6"

(Typical) Grade concrete


4'-0"

5'-6"
5'-0"
1'-6"

7). This is a design drawing only. Please


see final construction drawings for all
27'-6" installation details.
ELEVATION VIEW Rebar Schedule per Mat and per Pier
(10) #8 vertical rebar w/hooks at bottom
(44.2 Cu. Yds.)
Pier w/#4 Rebar ties, two (2) within top 5" of pier
(1 REQUIRED; NOT TO SCALE)
then 12" C/C
(28) #8 horizontal rebar evenly spaced each
Mat
way top and bottom. (112 total)

Information contained herein is the sole property of Sabre Industries, constitutes a trade secret as defined by Iowa Code Ch. 550 and shall not be
reproduced, copied or used in whole or part for any purpose whatsoever without the prior written consent of Sabre Industries.

7101 Southbridge Drive - P.O. Box 658 - Sioux City, IA 51102-0658 - Phone 712.258.6690 - Fax 712.279.0814
No.: 21-3971

Date: 1/13/21
By:

Customer: SPONSOR TELECOM


Site: Nicaragua El Payon 60mts

200 ft. Model S3TL Self Supporting Tower At


90 mph Wind + 0 in. Ice (concurrent) per ANSI/TIA/EIA-222-F-1996.
Antenna Loading per Page 1
PRELIMINARY -NOT FOR CONSTRUCTION-

0'-6"
2'-6"
Grade Dia. Notes:
1). Concrete shall have a minimum
28-day compressive strength of
3000 PSI, in accordance with
Two (2) #4 ties ACI 318-05.
within top 5" of
concrete 2). Rebar to conform to ASTM specification
A615 Grade 60.

3). All rebar to have a minimum of 3"


8'-6"
10'-0" concrete cover.

4). All exposed concrete corners to be


chamfered 3/4".

5). The foundation design is based on


"Normal Soils" as defined in ANSI/TIA/EIA-
222-F. It is recommended that a soil
analysis of the site be performed to verify the
soil parameters used in the design.
1'-6"

11'-6"
7). This is a design drawing only. Please
see final construction drawings for all
ELEVATION VIEW installation details.
(8.98 Cu. Yds. each) Rebar Schedule per Pad and Pier
(3 REQUIRED; NOT TO SCALE) (10) #8 vertical rebar w/hooks at bottom
Pier w/#4 ties, two (2) within top 5" of pier then
12" C/C
(12) #7 horizontal rebar evenly spaced each
Pad
way top and bottom (48 Total)

Information contained herein is the sole property of Sabre Industries, constitutes a trade secret as defined by Iowa Code Ch. 550 and shall not be
reproduced, copied or used in whole or part for any purpose whatsoever without the prior written consent of Sabre Industries.

7101 Southbridge Drive - P.O. Box 658 - Sioux City, IA 51102-0658 - Phone 712.258.6690 - Fax 712.279.0814

You might also like