You are on page 1of 16

PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL

LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan

SCHEDULE OF BID RATES


ITEM NO. Description Unit Quantity
I. GENERAL REQUIREMENTS
A Mobilization/Demobilization lot 7
Provision of transporting equipment from contractor's depot to the
project site and vice versa.
B TEMFACIL( Including electrical and water consumption) lot 7
Supply materials and labor for the erection and dismantling of plant/
backyard and NHA field office, installation of power and water system.
C Personal Protective Equipment(NHA staff, workers & contractor) lot 7
Supply all materials for personal and protective equipment for safety
and health of personnel.
D Permit and Licences ps 7
Provisional sum for the application of building permits and other
licences necessary for the construction of the building
SUB-TOTAL
II. GENERAL EARTHWORKS
A Clearing and Grubbing sq.m 1,050.00
Supply all labor, equipments and tools needed for the clearing
of the site, cleared rubbish, roots and other perishable and
objectionable matters to suitable subgrade.
B Excavation cu.m 101.25
Supply all labor, equipment and tools needed for the excavation
of column footing, wall footing, tie beam to the specified lines and
grades and other incidentals necessary as specified/shown in plans.
C Gravel Bedding (Supply, Place and Compact) cu.m 65.43
Supply all materials, labor, equipment and tools needed for the
spreading and compaction of gravel bedding materials to the
specified lines and grades as shown in plans.
D Backfill and Compact Trenches with Excavated Materials cu.m 69.89
Supply all labor, equipment and tools needed for the
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan

SCHEDULE OF BID RATES


ITEM NO. Description Unit Quantity
backfilling and compaction of selected excavated materials
to the specified lines and grades prior to placement of gravel
bedding and concrete pouring.
E Soil Poisoning sq.m 178.04
Supply all materials, labor and tools needed for the soil poisoning of
foundation.
SUB-TOTAL
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan

SCHEDULE OF BID RATES


ITEM NO. Description Unit Quantity
III. CONCRETE WORKS
Supply all materials, labor, equipments and tools needed for
the installation of Reinforcing steel bars and placing of concrete
on column footing, wall footing, slab on fill, column, pedestal,
tie beam, beam, tie wires, spacers, formworks and other
incidentals necessary as specified/shown in plans.
A Concreting Including Formworks
1 Column Footing and Wall Footing cu.m 22.18
2 Slab on Fill cu.m 19.29
3 Column/Pedestal cu.m 12.71
4 Tie Beam cu.m 4.48
5 Beams cu.m 3.58
B Reinforcing Steel Bar
1 Column Footing and Wall Footing kg. 387.73
2 Slab on Fill kg. 774.13
3 Columns/Pedestal kg. 3,319.19
4 Beams kg. 563.64
SUB-TOTAL
IV. MASONRY WORKS
Supply all materials, labor, equipment and tools needed for
CHB masonry walls, reinforcing bars, tie wires, mortars, batter
board, scaffolding, plain cement plastered finish and other
incidentals necessary as specified/shown in plans.
A 6" CHB Wall incl. Plastering sq.m 117.6
SUB-TOTAL
V. STRUCTURAL STEEL WORKS
Supply all materials, labor, equipment and tools needed for the
fabrication and installation of structural steel works for trusses,
column, purlins, rafters, roofing sheets and other incidentals
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan

SCHEDULE OF BID RATES


ITEM NO. Description Unit Quantity
necessary as specified/shown in plans.
A Structural Steel-Column pc. 28
B Structural Steel-Purlins/Rafters kg. 969.08
C Roofing Sheets sq.m 209.79
SUB-TOTAL
VI. ARCHITECTURAL WORKS
Supply all materials, labor and tools needed for installation
of doors, windows, floor tiles and other incidentals necessary as
specified/shown in plans.
A Doors set 7
B Windows set 7
C Floor Tiles-Ceramic Unglazed Tiles sq.m 26.74
SUB-TOTAL
VII. PLUMBING WORKS
Supply all materials, labor, equipment and tools needed for the
installation of sanitary sewer line, water line, plumbing fixtures,
A Sanitary Sewer Line
1 100mm PVC pipes l.m. 22.54
2 50mm PVC pipes l.m. 41.23
B Water line
1 20mm uPvc Pipes l.m. 39.2
C Plumbing Fixtures
1 Water Closet (elongated) incl. fittings set 7
2 Lavatory including fittings set 7
3 Faucet pc. 14
4 Floor Drain pc. 7
5 Soap Holder pc. 7
6 Tissue Holder pc. 7
D Septic Tank (PPST) unit 7
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan

SCHEDULE OF BID RATES


ITEM NO. Description Unit Quantity
SUB-TOTAL
VIII. ELECTRICAL WORKS
Supply all materials, labor, equipment and tools needed for the
installation of electrical roughing-ins, wires, cables,wiring devices,
lighting fixtures, panel board, circuit breaker, miscellaneous,
consumables, and other incidentials necessary as specified/shown in plans.
A Roughing-ins lot 7
B Wires and Cables lot 7
C Wiring Devices and Lighting Fixtures lot 7
D Panel board and Circuit breaker lot 7
E Miscellaneous and Consumables lot 7
SUB-TOTAL
GRAND TOTAL

In words: Four Million One Hundred Twenty Three Thousand Seven Hundred Thirty Five Pesos Only
In Figure : ₱4,123,735.00

Submitted by:

CHRISTOPHER M. ESTRELLA
President/Owner
CSE Builders
Date: January 10, 2018
Unit Cost Total Cost

48,398.00 338,786.00

40,977.00 286,839.00

24,737.00 173,159.00

15, 000.00 105,000.00

903,784.00

135.00 141,750.00

1,875.00 189,843.75

2,532.00 165,668.76

1,687.00 117,904.43
Unit Cost Total Cost

706.00 125,696.24

740,863.18
Unit Cost Total Cost

10,406.00 230,805.08
10,378.00 200,191.62
10,090.00 128,243.90
10,829.00 48,513.92
10,954.00 39,215.32

118.00 45,752.14
119.00 92,121.47
119.00 394,983.61
119.00 67,073.16
1,246,900.22

1,516.00 178,281.60
178,281.60
Unit Cost Total Cost

4,464.00 124,992.00
173.00 167,650.84
547.00 114,755.13
407,397.97

5,539.00 38,773.00
5,701.00 39,907.00
1,090.00 29,146.60
107,826.60

1,058.00 23,847.32
457.00 18,842.11

405.00 15,876.00

3,119.00 21,833.00
3,012.00 21,084.00
326.00 4,564.00
552.00 3,864.00
216.00 1,512.00
162.00 1,134.00
11,723.00 82,061.00
Unit Cost Total Cost
194,617.43

8,927.00 62,489.00
11,616.00 81,312.00
11,616.00 81,312.00
6,238.00 43,666.00
10,755.00 75,285.00
344,064.00
₱4,123,735.00
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan 5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan 6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan 7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan 0
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan

CONSTRUCTION SCHEDULE / S CURVE


00 30 60 90
Item
Description Amount %WT. 1st MONTH 2nd MONTH 3rd MONTH
No.
5.98% 2.24%
I. MOB/DEMOB 338,786.00 8.22%
###
###
###
###
###
###
###
### ###
###
###

11.59% 2.11%
II. GEN. REQMNTS 564,998.00 13.70%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

2.67% 0.38%
III. TERMITE CONTROL 125,696.24 3.05%
###
###
###
###
###
###
###
###

14.27% 0.65%
GENERAL
1V. 615,166.94 14.92%
EARTHWORKS ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

25.79% 4.45%
V. CONCRETE WORKS 1,246,900.22 30.24%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

4.16% 0.16%
VI. MASONRY WORKS 178,281.60 4.32%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

9.88%
STRUCTURAL STEEL
VII 407,397.97 9.88%
WORKS ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

2.61%
ARCHITECTURAL
VIII. 107,826.60 2.61%
WORKS ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

2.79% 1.93%
IX. PLUMBING WORKS 194,617.43 4.72%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

4.37% 3.97%
X. ELECTRICAL WORKS 344,064.00 8.34%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

TOTAL COST 4,123,735.00 100%

ACCOMPLISHMENT % PER MONTH 34.51% 40.25% 25.24%


ACCUMULATIVE % ACCOMPLISHMENT 34.51% 74.76% 100.00%
CASH FLOW 1,423,198.35 1,659,911.38 1,040,625.27
CUMMULATIVE CASH FLOW 1,423,198.35 3,083,109.73 4,123,735.00

Prepared by: Reviewed by: Recommending Approval: Approved by:

CHRISTOPHER M. ESTRELLA RAMON S. PARAGAS ROMUEL P. ALIMBOYAO MARCELINO P. ESCALADA JR.


General Manager Manager Department Manager General Manager
CSE Builders Bulacan District NCL - Central Luzon
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan 5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan 6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan 7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
PERT/CPM

90 CALENDAR DAYS
FIRST QUARTER SECOND QUARTER THIRD QUARTER FOURTH QUARTER
4 8 12 15 19 23 27 31 34 38 42 46 50 53 57 61 65 69 72 76 80 84 87 90

ELECTRICAL WORKS
42
TERMITE
CONTROL PLUMBING WORKS

S 8 49
T
A E
MOB GENERAL EARTHWORKS CONCRETE WORKS STRUCTURAL STEEL WORKS DEMOB
R N
8 23 34 22 3
T D

GENERAL REQUIREMENTS MASONRY WORKS ARCHITECTURAL WORKS


26 27 26

Prepared by: Reviewed by: Recommending Approval: Approved by:

CHRISTOPHER M. ESTRELLA RAMON S. PARAGAS ROMUEL P. ALIMBOYAO MARCELINO P. ESCALADA JR.


General Manager Manager Department Manager General Manager
CSE Builders Bulacan District NCL - Central Luzon
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan 5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan 6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan 7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan

MANPOWER UTILIZATION SCHEDULE

MONTH 1 MONTH 2 MONTH 3


DESCRIPTION 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90

PROJECT ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

SAFETY OFFICER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

CONSTRUCTION FOREMAN 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

Prepared by: Reviewed by: Recommending Approval: Approved by:

CHRISTOPHER M. ESTRELLA RAMON S. PARAGAS ROMUEL P. ALIMBOYAO MARCELINO P. ESCALADA JR.


General Manager Manager Department Manager General Manager
CSE Builders Bulacan District NCL - Central Luzon
PROJECT: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION:
1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan 5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan 6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan 7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan

EQUIPMENT UTILIZATION SCHEDULE

MONTH 1 MONTH 2 MONTH 3 MONTH 4


EQUIPMENT 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105

CONCRETE MIXER 1 BAGGER 7 7 7 7 7 7 7


BAR CUTTER 7 7 7 7 7 7
BAR BENDER 7 7 7 7 7 7
WELDING MACHINE (400 Amps) 7 7 7

Prepared by: Reviewed by: Recommending Approval: Approved by:

CHRISTOPHER M. ESTRELLA RAMON S. PARAGAS ROMUEL P. ALIMBOYAO MARCELINO P. ESCALADA JR.


General Manager Manager Department Manager General Manager
CSE Builders Bulacan District NCL - Central Luzon
PROJECT : CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL
LOCATION: 1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan
PROPONENT: CSE BUILDERS

NARRATIVE DESCRIPTION OF CONSTRUCTION METHODS


I. INTRODUCTION
BIDS AND AWARDS COMMITTEE CHAIRMAN HAS INVITED POTENTIAL BIDDERS TO APPLY FOR ELIGIBILITY
TO BID FOR THE PROJECT CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL AT THE PROVINCES OF
BULACAN

II. MOBILIZATION
AFTER WINNING THE BID AND COMPLIYING THE NECESSARY DOCUMENTS FOR THE RELEASE OF NOTICE OF
AWARD AND NOTICE TO PROCEED, MOBILIZATION COMES, ALL NECESSARY EQUIPMENTS AND INITIAL
MANPOWER WILL BE MOBILIZED TO THE SITE, PREPARES BUNKHOUSE AND OTHER NECESSARY FACILITIES.

III. GENERAL EARTHWORKS


THE DEVELOPER'S WORKERS START BY CLEARING THE PROJECT SITE, START EXCAVATION PUT NECESSARY
GRAVEL FILL THEN FULLY COMPACT. THEN SOIL POISON THE GROUND.

IV. CONCRETE WORKS


AFTER PREPARING THE GROUND, CONCRETE WORKS COMES NEXT, WORKERS PREPARED AND INSTALL
NECESSARY FORMWORKS, SOME FABRICATE THE NECESSARY STEEL REBARS FOR ERECTION/INSTALLATION,
AFTER REINFORCEMENT AND FORMWORKS, CONCRETE POURING WILL COMMENCE.

V. MASONRY WORKS
AFTER CONCRETING NECESSARY STRUCTURES, MASONRY OR INSTALLATION OF CHB COMMENCE.

VI. STRUCTURAL STEEL WORKS


INSTALLATION OF STRUCTURAL STEELS AND ALL NECESSARY ACCESSORIES, ALL WILL BE INSTALLED
ACCORDING TO SPECS AND PLANS.
VII. ARCHITECTURAL FINISHES
INSTALLATION OF ALL NECESSARY ARCHITECTURAL ACCESSORIES AND FIXTURES , ALL WILL BE
INSTALLED ACCORDING TO PLANS AND SPECIFICATION

VIII. ELECTRICAL
INSTALLATION OF ALL NECESSARY ROUGH INS, WIRES, AND ACCESSORIES, OUTLETS AND LIGHTING
FIXTURES FOR ELECTRICAL, ALL WILL BE INSTALLED ACCORDING TO PLANS AND SPECIFICATION

IX. PLUMBING
INSTALLATION OF ALL NECESSARY ROUGH INS, ACCESSORIES AND FIXTURES, ALL WILL BE INSTALLED
ACCORDING TO PLANS AND SPECIFICATION
X. DEMOBILIZATION
CLEARING AND REMOVING ALL DEBRIS AND CONSTRUCTION ITEMS ON THE PROJECT.
Submitted by:

CHRISTOPHER M. ESTRELLA
General Manager
CSE Builders

15 of 16
NATIONAL HOUSING AUTHORITY

Standard Form Number: SF-INFR-56


Revised on: August 11, 2004

Contract Name: CONSTRUCTION OF 7 UNITS TRANSPORTATION TERMINAL

Location: 1. Pandi Village 1 Resettlement Project, Brgy. Siling Bata, Pandi , Bulacan
2. Pandi Residences 1 Resettlement Project, Brgy. Mapulang Lupa, Pandi, Bulacan
3. Pandi Residences 2 Resettlement Project, Brgy. Bagong Barrio, Pandi, Bulacan
4. Logia ng Kakarong Resettlement Project, Brgy. Real De Cacarong, Pandi, Bulacan
5. St. Martha Estate Homes Brgy. Batia, Bocaue, Bulacan
6. Norzagaray Heights, Brgy. Bitungol, Norzagaray, Bulacan
7. Balagtas Heights, Brgy. Santol, Balagtas, Bulacan

CASH FLOW BY QUARTER AND PAYMENT SCHEDULE

PARTICULAR 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER


ACCOMPLISHMENT 25.00% 25.00% 25.00% 25.00%
CASH FLOW ₱ 1,030,933.75 ₱ 1,030,933.75 ₱ 1,030,933.75 ₱ 1,030,933.75
CUMULATIVE ACCOMPLISHMENT 25.00% 50.00% 75.00% 100.00%
CUMULATIVE CASH FLOW ₱ 1,030,933.75 ₱ 2,061,867.50 ₱ 3,092,801.25 ₱ 4,123,735.00

Prepared by:

CHRISTOPHER M. ESTRELLA
President/Owner
CSE Builders