Boiler, Compressor & Generator Fitness & Performance Test
Boiler, Compressor & Generator Fitness & Performance Test
2. Inspection & Fitness Test of Feed Water Pump, Water Level Control, 15,000
Pressure Switch & Other Control System for Safe Operation
4. Review and Recommendation of Feed Water System for Safe & 10,000
Energy Efficient Operation
5. Visual Check of Internal Condition of Shell Plate, Furnace Plate, Tube 8000
Plate, End Plate & Tube.
* These checking are only applicable to reachable portion.
* Detail Check and/or Thickness Gauging are not feasible.
6. Flue Gas Analysis by flue gas analyzer & Burner Tuning for Energy 25000
Efficient & Environment Friendly Operation
Total 98,000
AIT 10% 9,800
Total 107,800
** This price is applicable for one boiler of capacity up to 2 ton/hr.
** Vat excluded.
Generator Fitness & Performance Test
Cooling water, Lube oil, Fuel and Air system pressure, temperature
and level sensor check. Note: All sensors will be activated from relay
only.
Excitor inspection.
** Vat excluded.
Compressor Fitness & Performance Test
Megger test.
2. Compressor: