Building Management

SCHEDULE OPERASI ALAT & FASILITAS

No. Jenis Sistim / Peralatan Waktu Operasi Keterangan Pelaksanaan

I Sistim Kelistrikan
Periksa Kebersihan, Isolasi ruangan dan
1.1. Trafo TM 24 jam Maintenance Mesin
tingkat / kebocaran oli

Catat Meter Pemakaian, Periksa Tingkat


1.1. Panel TM & Distribusi Pembagi 24 Jam Pembebanan : KWh, A, V, COS &, Hz. Maintenance Mesin
Agar dicatat dalam buku pemakaian harian

Periksa tangki bahan bakar & pemakaian,


1.2. Genset & peralatannya Stand By accu, air radiator, Panel dan pemanasan 2 Maintenance Mesin
x seminggu
Koneksi Breaker / ACB / MCB, Periksa
1.3. Panel-panel LV Gedung 24 Jam Maintenance Building
Meter A, Kebersihan
Pastikan lampu yang dinyalakan sesuai
1.4. Penerangan Luar 18.00 - 06.00 Satpam, Maintenance Building
keperluan
Departemen Ybs, Office Boy,
1.5. Penerangan Koridor dan Lobby Stand By Sesuai keperluan
Satpam
Lampu harus dimatikan apabila Departemen Ybs, Office Boy,
1.6. Penerangan Ruangan Kerja 07.00 - 18.00
meninggalkan ruangan kerja Satpam
1.7. UPS & peralatan lainnya 24 Jam Tingkat Pembebanan, Kebersihan Maintenance Building

Tingkat Pendidinginan, Kebersihan.


Departmen Ybs, Maintenance
II Sistim Tata Udara / AC 07.00 - 18.00 Khusus untuk AC diruangan Server dan
Building, Satpam
HRD beroperasi 24 Jam

III Sistim Plumbing

2.1. Supply PAM Stand By Manual Operation Maintenance Building, Satpam

2.2. Pompa Deep Wheel / Jet Pump Stand By Manual Operation Maintenance Building, Satpam

2.3. Pompa Distribusi / Transfer 06.00 - 20.00 Manual Operation Maintenance Building, Satpam

2.4. Tangki Hidrofoor 06.00 - 20.00 Manual Operation Maintenance Building, Satpam

2.5. Panel-panel Pompa 06.00 - 200 Manual Operation Maintenance Building, Satpam

Kebersihan & Kebocoran, Periksa Tingkat


2.6. Bak Penampung Air Bersih 24 Jam Maintenance Building, Satpam
Permukaan Air = Minimun 1/2 terisi

Office Boy, Maintenance


2.7. Keran-keran kamar mandi Stand By Pengawasan Pemakaian
Building, Satpam

IV Sistim Alarm Kebakaran

3.1. Panel / Sentral Fire Alarm 24 Jam Automatic Operation Building Maintenance, Satpam

3.2. Bel Utama / Lampu Indikator 24 Jam Automatic Operation Building Maintenance, Satpam

3.3. Detector 24 Jam Automatic Operation Building Maintenance, Satpam

1/2
SCHEDULE OPERASI ALAT & FASILITAS

No. Jenis Sistim / Peralatan Waktu Operasi Keterangan Pelaksanaan

V Sistim Hydrant

4.1. Pompa Jockey Stand By Manual Operation Building Maintenance, Satpam

4.2. Pompa Utama Stand By Manual Operation Building Maintenance, Satpam

4.3. Pompa Utama Diesel Stand By Manual Operation Building Maintenance, Satpam

4.4. Hydrant Box Stand By Manual Operation Building Maintenance, Satpam

4.5. Pilar Hydrant & Siamese Cont. Stand By Manual Operation Building Maintenance, Satpam

VI Sistim Telekomunikasi
5.1. Pesawat PABX 24 Jam Automatic Operation Building Maintenance
5.2. Faximile 24 Jam Automatic Operation Building Maintenance
5.3. Box MDF 24 Jam Automatic Operation Building Maintenance

VII Sistim Tata Suara


6.1. Paging Sistim 07.30 - 18.00 Manual Operation Building Maintenance
6.2. Back Ground Music u/ PABX 07.30 - 18.00 Manual Operation Building Maintenance

Building Maintenance, Office


VIII. Lift 06.00 - 18.00 Manual Operation
Boy
2/2