Upgradation of Existing Substation into a Smart Substation

Article  in  Advances in Research · March 2020


DOI: 10.9734/air/2020/v21i130181

CITATION READS
1 979

2 authors, including:

Veena Kumari
Punjab Agricultural University
2 PUBLICATIONS   1 CITATION   

SEE PROFILE

All content following this page was uploaded by Veena Kumari on 12 March 2020.

The user has requested enhancement of the downloaded file.


Advances in Research

21(1): 50-66, 2020; Article no.AIR.54992


ISSN: 2348-0394, NLM ID: 101666096

Upgradation of Existing Substation into a


Smart Substation
Veena Kumari1* and Preetinder Singh2
1
Punjab Agricultural University, Ludhiana, India.
2
Guru Nanak Dev Engineering College, Ludhiana, India.

Authors’ contributions

This work was carried out in collaboration between both authors. Author VK proposed, designed the
study, managed the literature searches, performed the simulation, analysis and wrote the first draft of
manuscript. Author PS supervised every stage of the work. Both authors read and approved the final
manuscript.

Article Information

DOI: 10.9734/AIR/2020/v21i130181
Editor(s):
(1) Dr. Carlos Humberto Martins, Professor, Department of Civil Engineering, The State University of Maringa, Brazil.
Reviewers:
(1) Bruno Miguel Gonçalves Mataloto, Portugal.
(2) Okure, Inimfon – Abasi George, University of Uyo, Nigeria.
Complete Peer review History: http://www.sdiarticle4.com/review-history/54992

Received 18 December 2019


Accepted 25 February 2020
Original Research Article
Published 05 March 2020

ABSTRACT

The evolution of existing grids to smart grids for power supply is technologically the most prominent
research area. It is one of the hot projects considered to contribute in national economy, also at the
top priority for the country and involves hefty investments, although the entire research and
development area is still immature. The work in this paper describes smart substation and its
components which is fully in compliance with IEC61850 standard. It demonstrates a functional
architectural framework of smart substation with its three layers. This work compares both systems
and proposes a new system in single line diagram. The way to the establishment of smart fully
digitized substation is although just in the initial stage in India, but work on improvement must carry
on to keep up in pace with the fast growing technology especially integration of information
technology for the communication between different entities. This paper presents a model of power
system in case of fault how a merging unit can send information with high speed Ethernet in the
form of sampled value messages. Intelligent substation can consist of various smart equipments
capable of functioning instantaneously replacing the huge web of copper wires with fibre optic
cables. Hence Smart substation is the first step in the implementation of smart grid.

_____________________________________________________________________________________________________

*Corresponding author: E-mail: er.veena11@gmail.com;


Kumari and Singh; AIR, 21(1): 50-66, 2020;; Article no.AIR.54992

Keywords: Grid; IEC61850; smart grid; smart substation; process layer; bay layer; station layer;
merging unit; intelligent terminal; modelling.

1. INTRODUCTION Though Conventional electrical grid system is


efficient, reliable and has good control system,
1.1 Existing Conventional Power Grid but as it is a well-known
known fact that technology
(Fig. 1) needs to be updated to help it to be in pace with
everyday modern scientific advancements.
An electrical grid is a large interconnected
network which carries a huge amount of 1.2 Concept of Smart Grid
electrical energy and distributes it from the
generating stations to the potential customers. It Simply, Smart Grid = Digitization + Power Grid
incorporates generating stations capable of
producing electricity. Power stations are This implies that Smart Grid is the integration of
generallyy located far from the massively IT (Information Technology) with existing grid to
populated areas. The generated power is then get better flexibility, reliability, resiliency,
stepped up by transformers for transmission. It is efficiency and also in order to provide the bebest
stepped down to a low voltage at a substation. services to consumers.
Power grid can be categorized into main three
parts: generating station, transmission
ssion line and Smart
mart substation is the significant component of
distribution system. A distribution system Smart Grid. So, this is the main focus of this
distributes the energy to all the end consumers paper. New generation substation employs hi- hi
from the transmission line. Generating stations tech communication technology to minimize the
and Distribution System are linked by the construction and administrative costs. For the
Transmission lines. Step up and step down said purpose, IEC 61850 standard has been
transformers are installed
nstalled in the transmission line introduced [2].
for the purpose of decreasing and increasing the
voltage up to the desired level. In order to 1.3 IEC 61850 Standard
minimize the transmission losses, voltage is
magnified to a higher level by step-up step In the legacy systems, protocol for substation
transformer. At the end spot of transmission line, automation and its layout equipped the
a step-down
down transformer decreases the voltage power system automation with elementary
up to a possible level. This lowered voltage is operation and were introduced to take into
then given out to the distribution system account the technical limitation of the
coupled by feeders, sub-stations,
stations, distribution complex communication
on technology. Networking
transformers, lightning arrestor, utility lines etc. technology has advanced dramatically recently.
[1].

Fig. 1.. Existing conventional power grid architecture

51
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

Fig. 2. IEC 61850 standard sections

To take benefits from the modern advancements  A set of encoding rules: When the
in networking, IEC’s (The International transfer of messages occurs, then
Electrotechnical Commission) technical mapping of these data to bits and bytes is
committee released a universal standard IEC done by virtue of the encoding guidelines
61850 for substation automation. Mapping of [4].
protocols to MMS (Manufacturing Message
Specification), GOOSE (Generic Object Oriented GOOSE (Generic Object-Oriented Substation
Substation Event), SMV (Sampled Measured Event): On the authority of IEC 61850 standard,
Values) and to Web Services can be done with a control model GSE (Generic Substation
standard IEC 61850. The documentation in IEC Events) produces high-speed, reliable and
61850 describes the networking of secure mechanism for the transfer of messages
communication in 10 sections out of which over the whole electrical substation. GOOSE
primary part have been shown in grey fill (Fig. 2). (Generic Object-Oriented Substation Event) and
Switched Ethernet is used to get the response GSSE (Generic Substation State Events) are the
time over the internet networks [3]. two sub-divisions of GSE. GOOSE has the
capability to exchange the instructions within 4
MMS (Manufacturing Message Specification): milliseconds. GOOSE data is straight integrated
It is a global standard ISO 9506 which deals with into Ethernet. It has enhanced communication
the messaging system in the interest of structure. IED’s (Intelligent electronic devices)
exchanging the information between the are being installed in the substation that is
networked equipments. MMS describes the completely embraced by IEC 61850 without
following set of standards: having demand of particular cables or algorithms
[5].
 A set of standard objects: It must be in
each and every element so that the events 2. SMART SUBSTATION SYSTEM
like read, write or signalling etc. can be
effectively performed. IEC 61850 standard embodies three layers in
 A set of standard messages: Includes smart substation architecture (Fig. 3) called
transfer of a set of information in order to process layer, Bay layer and Station layer.
serve the motive of monitoring or Transformers, circuit breakers, isolators, primary
controlling the objects between the clients equipments and associated intelligent elements
and the server station. are included in the process layer. In the process

52
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

bus, the conventional wires are replaced with decision making all are involved in the station
optic fibres that transmits GOOSE messages and layer.
optical fibre sends sampled values. Optical fibre
is made up of silica capable of transmitting at 2.1 Process Bus Layer
higher data rates over large distances. Moreover,
just like in case of wires, fibre optics cables are In the Process Level of Smart Substation, the
not affected by the electromagnetic interference. data is carried in the form of a cycle from the
The Process Layer consists of merging unit (MU) master (main) switchyard (SW) to the HMI
and intelligent terminal (IT). Data acquisition and (Human Machine Interface) and vice-versa. The
execution of command is performed by IT. Digital high voltage components of the master
fortification, processing, and conversion function switchyard surrounds bus-bars, circuit breakers,
of protocols are operated by MU. The second isolators, power transformers, current and
layer is the bay layer which is mainly for the voltage transformers (CT’s and VT’s) which are
protection, control, fault recording, monitoring, confined to merging unit and intelligent terminal
data collection, calculation and other services. in smart substation. The output obtained by CT’s
This layer has many IED’s (Intelligent electronic and VT’s are collected (from digital system) and
device). Now comes MMS which is the main sampled (from analogue system) by means of
integration to the third layer station layer. Time Merging Unit IED by the way of Sampled Value
synchronization, communication, proof-locking of (SV) messages. The Intelligent Terminal Unit
disoperation, real time monitoring and immediate takes up the commands and executes them.

Remote Dispatch Centre

Human Machine
Operator Operator Engineering Network
Interface / Gateway GPS
SCADA Workstation Workstation station Printer
MMS + GPS

Station Ethernet (100mbps)

Station Control Layer

Intelligent Intelligent Intelligent Intelligent Intelligent Intelligent Intelligent Intelligent


Bay Level
Electronic Electronic Electronic Electronic Electronic Electronic Electronic Electronic
Devices Devices Devices Devices Devices Devices Devices Devices
Protection + Control

Ethernet

Fibre optic cable


Sampled Value + GOOSE

Process Level

Intelligent Intelligent Intelligent


Merging Unit Merging Unit Merging Unit
Terminal Terminal Terminal

Intelligent Intelligent Smart Smart Intelligent Intelligent Smart Smart Intelligent Intelligent Smart Smart
CT PT CBR SW CT PT CBR SW CT PT CBR SW

Integrated Intelligent Terminal Integrated Intelligent Terminal Integrated Intelligent Terminal

Fig. 3. Smart substation architecture

53
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

The transfer of these instructions is followed in protection of station level, monitoring,


the shape of GOOSE (Generic Object-oriented supervising, controlling, instant fault recording,
substation events) messages. Thus, the giving quality power, real time invigilation, and
communication technology used in this level are more auxiliary operations.
SV (Sampled Value) and GOOSE messages.
The GOOSE messages involve the functions like IED consists of protective relays, fault recorders,
indications, tripping signals and alarms etc. On event recorders, integrated sensors,
the contrary, SV messages transmits communication technologies, control and
instantaneous current and voltage samples from measurement automation systems. The bay
CT’s and VT’s to HMI. [6]. The Process layer level is accounted to have five fundamental
functional architecture is shown in Fig. 4. functional parameters (MMCPC): Monitoring,
Measurement, Communication, Protection and
2.2 Bay Layer Control. The first function is essential to
get the real time status of different associated
Historically defined devices known as secondary components in the system for example
equipment are connected between the process switches, transformers etc. Precise measure-
layer and station layer. This mid-layer is called ment of electrical parameters comes under the
bay layer (Fig. 5). The smart substation measurement function. Furthermore, the
constitutes IED’s (Intelligent Electronic devices) recorded information is to be shared then with
in this level in order to serve the purpose of Network Control Center that is the

HMI
CB tripping
Human Machine
closing commands etc. Interface

Process Bus

CB status etc.
Information flow
Master Switchyard
Transformer temperature
(HV components) V/I Samples

Process Layer
Intelligent Terminal Unit
Merging Unit IED

CT's VT's Busbars Circuit Isolators Power


Breakers Transformers

Collects (DS) or Breaker IED


samples (AS) in
the form of SV

Opening/Closing State/condition receives trip and close


Control monitor command from P&C IED's

Exchange of these instructions --> GOOSE messages

Fig. 4. Functional architecture of process layer

54
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

communication part. In case of outages or faults, accurate. The control function is entailed so
protection is the most critical function that a as to get the switches performed instantaneously
smart substation must have. This operation when in need. These have to be
makes it compulsory to have the mensuration of automated via suitable communication channels
the electrical parameters very precise and [7].

Station Bus

Intelligent Intelligent Intelligent Intelligent Intelligent


Electronic Electronic Electronic Electronic Electronic
Device Device Device Device Device

Protection + Control
Bay Layer

Monitoring Measurement Communication Protection Control

Status of various elements

Precise measuring of electrical parameters

Information sharing with NCC (Network Control Centre)

Safeguard the network in case of fault

Automated functioning in need

Process Bus

Fig. 5. Functional architecture of bay layer

Remote Dispatch Centre

Human Machine
Operator Operator Engineering Network
Interface / Gateway GPS
SCADA Workstation Workstation station Printer
MMS + GPS

Station Ethernet (100mbps)

Station Control Layer

IED's IED's

Fig. 6. Functional architecture of station layer

55
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

2.3 Station Control Layer samples and if any fault is spotted by it, then it
signals the breaker via trip GOOSE
Station Layer (Fig. 6) accommodates the message. P&C (Protection and Control) IED’s
automation system assisted with hi-tech in the bay layer functions in the form of logic
communication system. This layer uses IEC nodes.
61850 protocol based MMS service for
communicating with other devices. Logical devices in IED’s in Fig. 7 are TCTR,
TVTR, PDIF, PTRC and XCBR. The first letter
Substation control bus utilizes Ethernet switches indicates the logical nodes. The smallest part of
for message transfer which is contrary to process a function that exchanges data is called logical
level that uses GOOSE/SV messaging node (LN) in IEC 61850. Logical node is a
incorporating two-way communication. Station container that holds data objects and each data
Layer consists of unicast method. Unlike process object has a data attribute. Logical node C is
layer, it does not employ fiber optic cables, used for Supervisory Control, likewise G for
mostly double stranded wires have been adopted Generic Functions, I for Interfacing and archiving,
for interconnection in control level. However, L for System logical nodes, P for Protection, R
network analyser including additional cutting- for Protection Related, S for Sensors and
edge applications are prefixed to this layer monitoring, T for Instrument Transformers, X for
extending data scrutiny functionality to tackle any Switchgear, Y for Power Transformers, and Z for
kind of fault occurring [8]. further Power System equipment. TVTR node
connects to voltage transformer. TCTR node
3. DATA TRANSFER METHOD links to current transformer. PDIF is a logical
node for differential protection and is used to
In IEC 61850, voltage and current samples are analyze the samples received. PTRC stands for
transmitted to protection IED by making use of protection trip conditioning; this logical node
Merging Unit in the process layer. This data is in carries the trip information to XCBR. XCBR
the form of SV messages. The protection and signifies circuit breaker which performs the action
control equipments analyses the received to control the received commands [9].

Protection IED
GOOSE Tripping (Ethernet)

PTRC PDIF
SV (Ethernet)
SV (Ethernet)

Merging Unit
SCADA

XCBR TVTR TCTR

V I

VT CT
Smart Breaker

Fig. 7. Data transfer method

56
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

4. DESCRIPTION OF MAIN INTELLIGENT fundamental equipments which are essential for


COMPONENTS measurement, control and giving protection to
the energy network because a precise
Merging Unit: Merging Unit (Shown in pilot modification of secondary components is
installation - Fig. 8) is mainly constituted crucial to deliver to Intelligent Electronic
of non-conventional instrument transformers Devices (IED’s) and digitated relays. Digital
(NCIT’s) capable of measuring current and interface is a necessity to communicate
voltage. NCIT’s are well trusted with the with digital relays and IED’s and NCIT’s
objective to facilitate and close-pack the only support the measurement of high
primary components. To facilitate relays, meters transmission analogue current and voltage
and bay devices, NCIT’s are the basic signals.

Fig. 8. Merging unit


(Courtesy: ABB)

Fig. 9. Integrated smart terminal

57
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

Fig. 10. Pilot installation Laufenburg (Germany)


[Courtesy: ABB]

Fig. 11. Protection panel with IED


[Courtesy: ABB]

However, IEC 61850 necessitates digital Merging Unit can be described as an interface
interface in the form of smart devices. Therefore, IED that receives multiple sampled values from

58
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

CT’s/VT’s (Optical / Conventional) and delivers drawing. Further, blue dotted lines are used to
multiple digital point to point unidirectional time- indicate the smart devices in the attached
synchronized output. The use of Electronic CT’s drawing (Fig. 12).
and VT’s is highly recommended because of no
saturation effect, no effect of electromagnetic The existing 220 kV substation can be made
interference and no flammable insulation material more efficient by converting it into smart fully
such as oil, etc [10]. digitized substation to be completely in pace with
the latest technology. The single line diagram of
Smart Terminal (Intelligent Terminal): the proposed system is Fig. 13.
Conforming with IEC 61850, Intelligent Terminal
features an interface which acts as a nexus 6. SIMULATION MODELLING OF POWER
between process level bus and bay layer devices SYSTEM
for data exchange. Synchronous sampling is
obtained through input interface for protection The single line diagram of a simple power
and measurement equipments. The design of system to be modelled is as given in Fig. 14.
intelligent terminal supports further update and
can be configured as per need. GOOSE 6.1 Complete Power System Modelled in
messages and MMS are received in milliseconds Matlab/Simulink
through optical fiber linked to smart terminal
(Figs. 9 and 10) [11]. The modelled power system is composed of
220kV programmable voltage source, 4 buses,
Intelligent Electronic Device: Monitoring, safety one 220/66kV step down transformer, 10 km
and supervision control are the most important transmission line, three phase fault exerted
functions to facilitate the automation of between bus 2 and bus 3 and load. The
substation. Each function has specific tasks and complete modelling of power system is shown in
is called as logical node as according to IEC Fig. 15.
61850 standard. IED is formed of many such
nodes. These nodes are further parted into Simulation results of three-phase fault has been
naming structures, data objects, data attributes, briefed in result section for the fault current
services, and commands etc. Interoperability is between bus 2 and bus 3. But in order to test the
the most profitable characteristic of IEC 61850 Merging Unit whether Sampled Value message
standard, so IED supports it for further is sent to process bus by MU, further signal
integration and reconfiguration with latest arrangement has to be done with MU.
communication systems.
The power system with MU’s attached is
5. PROPOSED UPGRADATION presented in Fig. 16.

The existing 220 kV Ferozepur Road substation RT-Lab Real Time Simulator software has been
located in Ludhiana city opposite Milk Plant on used to integrate IEC61850 Merging Unit with the
Ferozepur Road under PSTCL (Punjab State MATLAB/Simulink. This software allows to
Transmission Corporation Limited) was taken as integrate its RT library with Simulink library for
reference to purpose upgradation for the modern the development with real-time simulation. It
electricity scenario by advanced smart devices. consists of IEC61850 library. Opal IEC61850
Merging Unit block illustrates an MU in the
The smart equipments to be used as IEC61850 architecture. The MU comprise of
replacement or to be integrated have been TVTR and TCTR logical nodes. It amalgamates
discussed above. The architecture followed in the voltage and current values in one dataset in
accordance with IEC 61850 standard have also the form of SV message for transmission to
been produced in this paper. IED’s. In OpIEC61850 Merging Unit block; V, I,
QA and Stop represents four input vectors used
For the upgradation purpose, the key diagram of to specify the SVs. Clock appears only in case of
existing 220 kV Ferozepur Road substation has selection of external clock. The vectors V [Va,
been divided into 4 parts just for the sake of Vb, Vc, Vn] and I [Ia, Ib, Ic, In] signifies three-
convenience. In the single line diagram, the phase V/I and neutral V/I. Quality Attributes
proposed technique in order to upgrade the symbolized by QA is an 8-element vector of V/I
substation into a smart substation was drawn dataset [QVa, QVb, QVc, QVn, QIa, QIb, QIc,
with the help of AUTOCAD software. The four QIn]. Each element is a 16-bit value. The
parts are shown with red dotted lines in the output Err gives the error status.

59
KEY DIAGRAM OF 220K.V. S/S FEROZPUR ROAD LUDHIANA

MODEL TOWN
DUGRI

25 06 017 021

SOUTH CITY
01

SAPRE
29 025 025

S / NGR - DC COMPLEX

HUMBRAN
HAIBOWAL -1
HAIBOWAL -2
PAU- FOUNTAIN CHOWK
220 KV LALTON 220 KV HUMBRAN 26 30 02 05 018
2 022 026 026
0.4Sq. Inch 0.4Sq. Inch
400-200/ 800-400/ 800-400/ 800-400/ 800-400/ 800-400/ 800-400/ 800-400/ 800-400/
1/1/1 1/1/1 1/1/1 1/1/1 1/1/1 2x 0.4Sq. Inch 1/1/1 1/1/1 1/1/1 1/1/1
2x 0.4Sq. Inch GAS CIRCUIT C-7 C-8 C-1 C-2 BUS BAR NO C-3 C-5 C-6 C-15
SF-6 SF-6
1 BUS BAR NO BREAKER
ALSTOM ALSTOM ABB
SF-6 SF-6
CGL
1 SF6
CGL
SF6
CGL
MOCB
ALIND ALSTOM
SF6
ABB
1
800-400/ 800-400/
1/1/1 1/1/1 031 039 03 07 019 023 027 027
SF6 BREAKER SF6 BREAKER
CGL A2 CGL A3 LA
032 040 04 08 020 024 028 028
PT
2x 0.4Sq. Inch 2x 0.4Sq. Inch 2x 0.4Sq. Inch 2x 0.4Sq. Inch
BUS BAR NO BUS BAR NO BUS BAR NO
2 2 LA 66 KV PT
2
LA
2x 0.4Sq. Inch 2x 0.4Sq. Inch
600-300 /.577-1-1-1-1-1A 300-150 /.577-1-1-1-1-1A BUS BAR NO BUS BAR NO
2 1
SF-6 SF-6 20 MVA
SIEMENS A-4 CGL A-3 66 KV SF-6
LA 66/11 KV T/F ALSTOM C-13

LA
LA 3 T-3 ECE 038 037 CAP. CAP. CAP.
160 MVA 100 MVA 400-200-100/.577/1/1 BANK BANK BANK
20 MVA NO -1 NO -2 NO -3
220/66 KV T/F 220/66 KV T/F 66 KV SF6
66/11 KV T/F ABB C-11 364x36 364x36

LA
T-5 BHEL T-4 BHARAT BIJLI 364x36
T-1 TA 040 039 =13.104 =13.104 =13.104
MVAR

4x 0.4Sq. Inch
MVAR MVAR
LA 200-100/.577/1/1
16/20 MVA
2000-1000/.577-1-1-1-1-1A 66 KV SF6
C-14
2x 0.4Sq. Inch

66/11 KV T/F ABB C-12


LA

1000-500/.577-1-1-1-1-1A

60
T-2 APEX 041 042 SF-6
SF-6 SF-6 CGL
ABB C-10 ABB C-9 200-100/.577/1/1

800-400/ CAP. CAP.


PT 1/1/1
4x 0.4Sq. Inch 4x 0.4Sq. Inch BANK BANK
NO -5 NO -4
400-200/ 364x36
1/1/1 364x36
2x 0.4Sq. Inch

=13.104 =13.104
LA MVAR MVAR

[Divided into 4 sections]


C-4
SF-6
SIEMENS

2 2
3X 11 KV XLPE CABLE 300 MM 3X 11 KV XLPE CABLE 300 MM

Fig. 12. SLD of 220kV substation


2
3X 11 KV XLPE CABLE 300 MM
CGL
CGL

CGL
A. BOND

AREVA
ALSTOM
ALSTOM
ALSTOM
ALSTOM
ALSTOM
ALSTOM
ABB

BHEL
SIEMENS
STEL MEC

MAGAWIN
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM
GEC ALSTOM

LT
PANNEL
SPARE 200-100/5/5A

GURDEV HOSPITAL 400-200/5/5A

FMI 400-200/5/5A

INCOMING-3 1200-600/5/5/1/.577

SPARE 400-200/5/5A
AARTI 400-200/5/5A
BUS COUPLER 1200-600/5/5A
CAP BANK 300-150/5/5A

COUNTRY HOME 400-200/5/5A


GURDEV NAGAR 400-200/5/5A
SBS NAGAR 400-200/5/5A
CAP BANK 400-200/5/5A
SANCHAR COLONY 400-200/5/5A
INCOMING -1 1200-600/5/5A
BHARAT NAGAR 400-200/5/5A
MILK PLANT 200-100/5/5A
VISHAL TOWER 200 - 100/5/5A
BUS COUPLER 1200 - 600/5/5A
MANDIR WALA 400 - 200/5/5A
PAKHOWAL RD. 400 - 200/5/5A
MODEL GRAM 400 - 200/5/5A
B.R.S. NAGAR 400 - 200/5/5A
INCOMING -3 1200 - 600/5/5A

GADVASU 200 - 100/5/5A


CFC SCHOOL 200 - 100/5/5A
T.P SCHOOL 400 - 200/5/5A
COLONY 200 - 100/5/5A
CAP BANK 400 - 200/5/5A

AGAR NAGAR 400-200/5/5A


SUNET 400 - 200/5/5A
SAB SATATION 200 - 100/5/5A
SARABHA NAGAR 400 - 200/5/5A
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992
61
Fig. 13. Complete SLD of system
LA

MU
ST
MU
ST
MU
ST
220 KV LALTON

SPARE 400-200/5/5A
BHEL
MU
ST

INCOMING-3 1200-600/ 5/5/1/.577


MAGAWIN
FMI 400-200/5/5A
Fibre Optic Cables
220 KV HUMBRAN

4x 0.4Sq. Inch

AREVA
COUNTRY HOME 400-200/5/5A
ALSTOM
2x 0.4Sq. Inch

GURDEV NAGAR 400-200/5/5A


ALSTOM
MU
ST
MU
ST

SBS NAGAR 400-200/5/5A


ALSTOM
LA

AARTI 400-200/5/5A
ALSTOM
MU

GURDEV HOSPITAL 400-200/ 5/5A


ALSTOM
CAP BANK 400-200/ 5/5A ALSTOM
4x 0.4Sq. Inch

BUS COUPLER 1200-600/5/5A


ABB
SIEMENS
3X 11 KV XLPE CABLE 300 MM

CAP BANK 300-150/5/5A


2
MU

3X 11 KV XLPE CABLE 300 MM


2

SANCHAR COLONY 400-200/ 5/5A CGL


2
1

4x 0.4Sq. Inch
SPARE 200-100/5/5A
2x 0.4Sq. Inch
2x 0.4Sq. Inch

BUS BAR NO

GEC ALSTOM
BUS BAR NO

ST

INCOMING -1 1200-600/ 5/5A


GEC ALSTOM
SAPRE
ST

MU

BHARAT NAGAR 400-200/5/5A GEC ALSTOM


ST

MILK PLANT 200-100/5/5A GEC ALSTOM


GADVASU 200 - 100/5/5A GEC ALSTOM
ST

MU

AGAR NAGAR 400-200/5/5A GEC ALSTOM


ST

VISHAL TOWER 200 - 100/5/5A GEC ALSTOM


HUMBRAN
ST

MU

To Feeders
CFC SCHOOL 200 - 100 /5/5A GEC ALSTOM
2
ST

SUNET 400 - 200/5/5A GEC ALSTOM


2x 0.4Sq. Inch
BUS BAR NO

T.P SCHOOL 400 - 200 /5/5A GEC ALSTOM


HAIBOWAL -1
ST

MU

T-1 TA
20 MVA
20 MVA

T-3 ECE

T-2 APEX

SAB SATATION 200 - 100/5/5A


16/20 MVA

A. BOND
ST

66/11 KV T/F
66/11 KV T/F
66/11 KV T/F

BUS COUPLER 1200 - 600/5/5A GEC ALSTOM


LA LA LA
HAIBOWAL -2
ST

MU

MANDIR WALA 400 - 200/5/5A GEC ALSTOM


MU
MU
MU
ST

2
LA

ST
ST
ST

PAKHOWAL RD. 400 - 200 /5/5A GEC ALSTOM

3X 11 KV XLPE CABLE 300 MM


2x 0.4Sq. Inch
BUS BAR NO

2
2x 0.4Sq. Inch
MU

COLONY 200 - 100/5/5A GEC ALSTOM

ST
ST
ST
ST
ST

SARABHA NAGAR 400 - 200/5/5A GEC ALSTOM


LA

MODEL GRAM 400 - 200/5/5A GEC ALSTOM


MU

2x 0.4Sq. Inch PAU- FOUNTAIN CHOWK


ST

MU

B.R.S. NAGAR 400 - 200/5/5A


CGL
1
ST

MU
MU
INCOMING -3 1200 - 600/5/5A
2x 0.4Sq. Inch
BUS BAR NO

CGL S / NGR - DC COMPLEX


MU
ST

ST
ST
CAP BANK 400 - 200/5/5A
STEL MEC
ST

CAP.
MODEL TOWN

MVAR
364x36
NO -1

=13.104
BANK
MU
ST

2
ST

2x 0.4Sq. Inch
BUS BAR NO

CAP.

CAP.
NO -2
364x36

MVAR
BANK

364x36

MVAR
NO -5
=13.104

=13.104
BANK
DUGRI

IED's
ST

MU

ST

CAP.

CAP.
364x36

MVAR
NO -3
=13.104

NO -4
364x36

MVAR
BANK

BANK

=13.104

IED's
IED's
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

Bus 1 Bus 2 Bus 3

Programmable
Voltage Source
Transmission Line
220 / 66 kV Voltage regulator
Step Down
Transformer
Load
Merging Unit

A/D SV Publisher
CT/PT based on IED
Converter
IEC 61850

Fig. 14. Simple power system model

Fig. 15. Power system modelling in Matlab/Simulink

After the conversion of NCIT signals to a single analogue signals into digital signal. The signal is
vector, it is to be fed into the Merging Units. to be transmitted to Ethernet. Process bus
The configuration of Merging Unit is given in receives the information in the Sampled Value
Fig. 18. form.

6.2 Complete System Integration The purpose of modelling a power system is to


test the merging unit by simulation if it sends the
The developed model in order to test various Samples Values. This needs to be connected
protection functions is shown in the screenshot through fibre optic cables enabling IEC61850
where the formulated power system has been protocol signals. The performance can be
merged with NCIT. The subsystem has been analyzed using the modelled power system. The
created indicating ECT and EVT (Electronic network packet analyzing software Wireshark
Current and voltage transformers) model has been used to capture SV from the connected
integrated with Merging Unit to convert the MU’s.

62
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

Fig. 16. Model of power system with NCIT’s

Fig. 17. RT-LAB OpIEC61850 merging unit block

63
Kumari and Singh; AIR, 21(1): 50-66, 2020;; Article no.AIR.54992

Fig. 18.. Configuration of RT-LAB


RT OpIEC61850 merging unit block

Fig. 19. Complete system integration

64
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

7. RESULTS AND DISCUSSION

7.1 Comparative Analysis of Smart Substation and Conventional Substation

Table 1. Comparative analysis of smart substation and conventional substation

Smart substation Conventional substation


Smart substation is IEC 61850 standard Conventional substation is complied with Indian
compliant that is fully advanced with upgraded Electricity Act, 2003.
communication.
Electronic current transformer has no Conventional CT installed causes saturation in
saturation effect and immunity to the core leading to non-linear excitation. It is
electromagnetic interference. affected by the electromagnetic interference.
Non-conventional instrument transformers can Conventional current and voltage transformers
be integrated into Merging Units. The other and secondary equipments are used which are
secondary equipments can be merged into not efficient enough and occupies large space.
Intelligent terminal. Then both can be
formulated into Integrated Intelligent Terminal.
So compact size reduces space and lowers
maintenance.
Hence compactness is bound to reduce cost. Heavy cost is imposed on the system.
Fiber Optic Cables to be replaced with copper Large cabling required, generally copper wires
wires with no electromagnetic interference plus are used. Hence costing is enormous.
it has the capability to transmit at higher data
rates over long distances. Less cost.
It uses high speed Ethernet generally with 100 Power Line Carrier communication have been
MBps enabling SV, GOOSE and MMS and installed for the communication purpose. SCADA
integrated with existing SCADA system. is being used.
Monitoring, protection and immediate decision Used method of communication causes delay in
making functions completely digitized making the safeguarding of equipments in case of
the system more stable, reliable and cost- outages because of slow communication.
effective.
Intelligent Electronic Devices are employed in Not so efficient protection and control system is
intelligent substation which uses logical nodes. available in existing substation system.
It employs protection and control function
digitally with improved operation.
Automatic fault clearance capability within few Fault clearance time is large.
milliseconds.

8. CONCLUSION analysis has been penned to show the


contrasting features between the existing and
A Smart substation, an indispensable part of the intelligent substation. Though communication
smart grid, is latest technology and the hot topic part still needs to be worked upon a lot
being discussed around. The main components and the time synchronization can be a good
of smart substation to be initially used and research for further work to test between
developed is discussed in the paper. The different Merging Units and Intelligent
integrated intelligent terminal and intelligent Electronic Devices. The merging units can
electronic devices blocks were used in single line be more technologically advanced
diagram of 220 kV Ferozepur Road (standalone merging units) in near future for
substation. The three layers of the smart interoperability which is the main focus of IEC
substation are described, and functional 61850.
architecture of substation is designed using
AutoCAD software. The proposed model of COMPETING INTERESTS
power system created in MATLAB/Simulink
has been used to understand the behaviour of Authors have declared that no competing
system in case of fault. At last, a comparative interests exist.

65
Kumari and Singh; AIR, 21(1): 50-66, 2020; Article no.AIR.54992

REFERENCES cobweb topology. IEEE Transactions on


Power Delivery. 2014;29(2):842-850.
1. Golam Robbany, Golam Mostafa, Smart 7. Gagandeep Singh. Design and
grid technology in Bangladesh: An engineering for smart secondary
overview and Implementation, B.Sc., Dept. substation automation panel. M.Sc. Thesis,
of Electrical and Electronic Engineering, Department of Computer and Electrical
Daffodil International University, Engineering, Tampere University of
Bangladesh; 2014. Technology; 2015.
2. Durgesh Kumar Dubey. Issues and 8. Xiaofei Zhanga, Luolin Zhengb, Ruying
challenges in electricity sector in India. The Zhaoc. Research on network system of
business & management review, smart substation typical problems and its
th
International Conference on Issues in corresponding solutions. 4 International
Emerging Economies (ICIEE). 2015;5(4): Conference on Sensors, Measurement and
132-139. Intelligent Materials (ICSMIM). 2015;772-
781.
3. IEC 61850; 2018.
9. Jeyasingam Nivethan. Modeling and
Available:https://en.wikipedia.org/wiki/IEC_
simulation of an electric power substation.
En.wikipedia.org Thesis, Department of Computer
4. Manufacturing Message Specification; Engineering, The University of Tulsa;
2017. 2013.
Available:https://en.wikipedia.org/wiki/Man 10. Muhammad Salman Khan. Development of
ufacturing_Message_Specification protection scheme for Non Conventional
En.wikipedia.org instrument Transformer (NCITs) Based on
5. Generic substation events; 2018. IEC 61850-9-2, M.Eng. Thesis, College of
Available:https://en.wikipedia.org/wiki/Gen engineering and science, Victoria
eric_Substation_Events#Generic_Object_ University, Melbourne, Australia; 2015.
Oriented_Substation_Events 11. Zhang Shujian, Sun Ming, Ge Gaofei. The
En.wikipedia.org research based on IEC61850 intelligent
rd
6. Xiaosheng Liu, Jiwei Pang, Liang Zhang, terminal of substation. IEEE 3
Dianguo Xu. High-reliability and International Conference on Communica-
determinacy architecture for smart tion Software and Networks. 2011;304-
substation process-level network based on 307.
_________________________________________________________________________________
© 2020 Kumari and Singh; This is an Open Access article distributed under the terms of the Creative Commons Attribution
License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any
medium, provided the original work is properly cited.

Peer-review history:
The peer review history for this paper can be accessed here:
http://www.sdiarticle4.com/review-history/54992

66

View publication stats

You might also like